Loading…
Loading…
15,046 results • Best match
Quantum of works involved in Increasing capacity of different rating Distribution Transformer installation/ new and Construction of PCC/ST pole as per requried on site,EDSD-III Banthar under Divison-II, Unnao. against Business Plan Year 2024-25 pa
For the Work of Business Plan 2023-24 Nagar Nigam Scheme Replacement of Damage XLPE Cable, Zarzar Bare Conductor, Guarding of HT Line, Pole Erection Between Long Span and Earthing of Power and Distribution Transformer Under EUDD-II, Meerut.
INCREASING CAPACITY OF 16 KVA TO 63 KVA AND 100 KVA TO 250 KVA DISTRIBUTION TRANSFORMER AND OTHER RELATED WORKS IN THE AREA OF E.D.S.D.-III, MIYAGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR 2025-26.
9 KVA, 750 V / 415 V / 190 V AC, 3 Phase, Star - Star - Star, Dry Type and air cooled power distribution transformer to RDSO Specification No. RDSO/PE/SPEC/TL/0158-2010 (Rev.1), Type I. (Warranty as p
Dry type power distribution transformer 60 KVA, capacity 750/415V, 3-Ph for LHB type AC coaches as per RDSO Spec No. RDSO/PE/SPEC/AC/0080-2007 (Rev-1), Material shall be procured from RDSO/RCF/ICF app
9 KVA, 750 V / 415 V / 190 V AC, 3 Phase, Star - Star - Star, Dry Type and air cooled power distribution transformer to RDSO Specification No. RDSO/PE/SPEC/TL/0158-2010 Rev.1, Type I. FIRM'S OFFER : A
9 KVA, 750V/415V/190V AC, 3 Phase, Star-Star-Star (Yyy) dry type and air cooled power distribution transformer suitable for the Train lighting load (4.5 KVA - 415 V AC + 4.5 KVA - 190 V AC) of LHB typ
9KVA Dry type Distribution Transformer, 750V/415V/190V AC, 3 Phase, confirming to RDSO/PE/SPEC/TL/0158-2010, Rev-0 or latest. Suitable for Non AC LHB LS and LWSCN Coaches. as per Specn. RDSO/PE/SPEC/T
9KVA Dry type Distribution Transformer, 750V/415V/190V AC, 3 Phase, confirming to RDSO/PE/SPEC/TL/0158-2010, Rev-0 or latest. Suitable for Non AC LHB LS and LWSCN Coaches. as per Specn. RDSO/PE/SPEC/T
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under juridiction of EDD-II, Sitapur.
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA,250 KVA to 400 KVA in Business Plan 2017-18 Under juridiction of EDD-I, Lakhimpur.
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under juridiction of EDD-II, Gola.
Replacement of damaged L-Piece, Lugs Housing, U-Type Spring Contact, Brass Back Entry, Repairing of Damaged Fuse Unit, other related jobs including Removal of Grass, Garbage and Bushes Around the Distribution Transformer in the area of Sub-Divisiona
For Safe Cartage of damaged Transformer from Site to Store and OK Transformers from Store to Site, in the Area of Electricity Urban Distribution Sub-Division-XII, Under Electricity Urban Distribution Division-IV, Meerut
For Safe Cartage of damaged Transformer from Site to Store and OK Transformers from Store to Site, in the Area of Electricity Urban Distribution Sub-Division-VII, Under Electricity Urban Distribution Division-IV, Meerut
For Safe Cartage of damaged Transformer from Site to Store and OK Transformers from Store to Site, in the Area of Electricity Urban Distribution Sub-Division-XIII, Under Electricity Urban Distribution Division-IV, Meerut
EDD-II, Mughalsarai area under, Replacement of burnt transformers from workshop in place of burnt transformer 02 Nos. vehicle is required for haulage work.
work of stopping transformer oil leakage from Power Transformers installed at various 33/11 KV sub-station under EUDD-I/II/III/IV, Aligarh
Centrifuging of transformer oil along with other associated works and replacement of gaskets of transformers at 132 KV sub station Asha under ETD Hardoi
Custom Bid for Services - MRCC24P005 for Sampling collection transportation and Diagnostic testing of Transformer oil samples of power distribution transformers of Mathura Refinery Locations
work for power transformer packing wiring etc
Earthing Delta Point of various power transformer
REPLASMENT OF POWER TRANSFORMER UNDER EDD KHURJA
33/11 KV, 10 MVA, Power Transformer
33/11 KV, 10 MVA, Power Transformer
Transportation of 04 nos. 30 MVA Power Transformer from BHEL Jhansi to Kodayar POWER HOUSE STAGE 1 TGC KANYAKUMARI TAMILNADU by suitable Hydraulic / Mechanical Trailer
CONSTRUCTION OF NEW 33/11 KV SUBSTATION WITH 2X5 MVA POWER TRANSFORMER FOR PHOOLLI, DIST. GHAZIPUR, CONSTRUCTION OF NEW 33 KV LINE AND 11KV LINE FOR 33/11 KV SUBSTATION PHOOLI, DIST. GHAZIPUR ON SEMI TURNKEY BASIS.
For Installation 400 KVA T/F with Mobile Trolly AND Supply AND Errection of Chemical Earthing and connection with Power Transformer in the area of Uedd-II, Varanasi under system Augmentation /System strengthening work Plan 2023-24
work of replacement of 05 MVA Power Transformer at 33/11 kv S/s Katghar Moradabad after carriage the same from 33/11 kv S/s Daulatbagh under the jurisdiction of Electricity Urban Distribution Division-III, Moradabad
Work of replacement of 05 MVA Power Transformer at 33/11 KV S/S Katghar Moradabad after carriage the same from 33/11 KV S/S Daulatbagh under the jurisdiction of Electricity Urban Distribution Division-III, Moradabad.
Carrying out various electric works for arresting oil leakage from 10 MVA power transformer installed at 33 KV Sub Station Krishna Nagar under the area of EE, EUDD III, Mathura in the jurisdiction of SE, EUDC, Mathura
PARTIAL DISCHARGE TESTING OF VARIOUS 220KV CTs AND PTs AND TAN DELTA TESTING OF VARIOUS POWER TRANSFORMER INSTALLED AT 220KV SUB STATION MIRZAPUR, 132 KV SUB STATION LALGANJ AND 132 KV SUB STATION CHHANBEY UNDER ETD, MIRZAPUR
CONSTRUCTION OF NEW 33/11 KV SUBSTATION WITH 1X5 MVA POWER TRANSFORMER FOR BAURI, DIST. GHAZIPUR, CONSTRUCTION OF NEW 33 KV LINE AND 11KV LINE FOR 33/11 KV SUBSTATION BAURI, DIST. GHAZIPUR ON SEMI TURNKEY BASIS.
Bimetallic terminal connector to suit ZEBRA ACSR conductor and 30 dia copper stud of CT/CB/Traction power Transformer (11011 &11012) as per RDSO Spec No-TI/SPC/OHE/FITTING/0130- (10/13) , Rev-1 and d
Construction of 01 No. 132kV GIS Bay and 01 No. 33kV GIS Bay includes Erection and Commissioning of 01 No. 63MVA Power Transformer for Increasing Capacity Work at Existing 220kV GIS Jalpura, Gr. Noida on Turnkey Basis
Buchholz Relay transformers
PAINT FOR TRANSFORMERS
Baricating of Transformers
Installation of Transformers
Earthing of Transformers
Fencing of Transformers
The Work for Replacement of packing of 08/05 MVA power Transformer installed at 33/11 KV S/s Chatta/Chomuha in the jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
For the Work of Business Plan 2024-25 For Earthing of Power Distribution Transformers and Installation of 9 No. Additional 250 KVA Transformer Due to Overloading of 400/630 KVA Transformer Work Under EUDD-I, Meerut.
Loading-carriage-unloading of damaged distribution transformers from site of its damage up to Store Centre/ Repair Workshop and its proper stacking and Loading-carriage-unloading of repaired/healthy transformer from Store Centre/Transformer Repair Wo
For Installation of an Additional 11/.4 KV 250 KVA Transformer near B.K.M. School. Gurubagh, Varanasi to reduce the load of overloaded existing 400 KVA DTR under Business Plan 2022-23.
For Safe Cartage of damaged Transformer from Site to Store and OK Transformers from Store to Site, in the Area of Electricity Urban Distribution Sub-Division-Ramlila Ground Town, Under Electricity Urban Distribution Division-V, Meerut.
33/2024-25/EDCR Providing and fixing of Tailless Unit with related material for protection of 250/400/630 KVA Distribution Transformer emanation from 33/11 KV substation under EDC, Rampur and bifurcation works under Business Plan 2024-25 (Part-2).
CA NO.CWE BLY/GE (E)/93 OF 2025- 2026REPAIR/MAINT OF HT DISTRIBUTION SYSTEM AND ITS CONNECTED WKS OF EAST AREA, REPAIR/MAINT OF DISTRIBUTION TRANSFORMER, CONTROL PANEL AND CONNECTED WKS OF EAST AREA, REPAIR /MAINT/REPLACEMENT OF HT CABLE
For providing and fixing of FRP fencing including civil work at distribution transformer 400 KVA Shyam baba dal mill and 400 KVA GSI colony against M and R work in the area of substation GSI under EUDD Sitapur road Transgomti LESA
Establishment of additional distribution transformer in the works to be done under the work plan of Rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in EDD-I, Chandauli. on semi turn-key basis