Loading…
Loading…
15,054 results • Best match
Establishment of additional distribution transformer in the works to be done under the work plan of Rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in EDD-I, Chandauli. on semi turn-key basis
Under Business Plan Work 2024-25 Incresing Capacity of Medium Distribution Transformer 100KVA to 250 KVA in Town Shahpur (JK HYDROLIC ke Pass and Ashirwad Hospital ke Pass) and Village Basikala (Palda Mode ke pass) in Area of EDD Budhana.
22/2025-26/EDCR Providing and fixing of Tailless Unit with related material for protection of 160 KVA to 1000 KVA Distribution Transformer emanation form 33/11 KV substation works under Business Plan 2025-26 under jurisdiction of EDC, Rampur
QUANTUM OF WORKS INVOLVED IN REPLACEMENT OF OLD AND JARJAR WIRE WITH PROVIDING ADDITIONAL POLE TO REDUCE SPAN LENGTH OF 11 KV AND L.T. LINE AND INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER DUE TO OVELOADING AT DIFF. SITES UNDER THE SPECIAL BUSINES
REPAIR PREVENTIVE MAINT OF THE VARIOUS POWER DISTRIBUTION TRANSFORMER ALONG WITH RMU, VCBs ETCWITH REPLACEMENT OF BURNT OUT HT JOINTS CABLES ETC WITH REPLACEMENT OF BURNT OUT HT JOINTS CABLES ETC WITH OTHER CONNECTING ACCESSORIES ETC AT AF STN BALY
QUANTUM OF WORKS (30 WORKS) INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES AND REPLACEMENT OF OLD AND JARJAR WIRE WITH PROVIDING ADDITIONAL POLE TO REDUCE SPAN LENGTH OF 11 KV LINE,UNDER THE BUSINESS PLAN YEAR 2023-24
Increasing capacity of Distribution Transformer against Business Plan 2023-24 Package No. 1039, 1040, 1043, 1044, 1045, 1046, 1047, 1048, 1049, 1050, 1051, 1052, 1053, 1054/23-24 under Jurisdiction of EDD, CESS-I and II, Ciss Gotmi, Lesa, Lucknow
9 kVA, 750 V/415 V/190 V, 3 phase Dry Type Distribution Transformer (Type. I) for LHB Non- AC Coaches to RDSO specification No.RDSO/PE /SPEC/TL/0158-2010 (Rev-0) with all accessories as per scope of s
9 KVA, 750/4l5/190V AC 3-phase Star-Star-Star (YYY), dry type and air cooled step down distribution transformer for LHB type Non-AC EOG coaches as per RDSO Spec. No. RDSO/PE/SPEC/TL/0158-2010 (Rev. I)
60 KVA 750/415V 3 phase Dry Type power Distribution Transformer for EOG LHB Coaches as per RDSO's SPEC No.RDSO PE SPEC AC 0080-2007 [Rev-0] with Amndt. No. 1..Spec:RDSO PE SPEC AC 0080-2007(REV-O) wi
9 KVA 750V/415V/190V AC, 3-Phase,Star-Star-Star, Dry Type, Air Cooled Power Distribution Transformer For LHB Type Coaches As Per RDSO/PE/Spec/TL/0158-2010,Rev-0,Type-1. as per Drg.No. N/A specn: RDSO/
9 KVA 750V/415V/190V AC, 3-Phase,Star-Star-Star, Dry Type, Air Cooled Power Distribution Transformer For LHB Type Coaches As Per RDSO/PE/Spec/TL/0158-2010,Rev-0,Type-1. as per Drg.No. N/A specn: RDSO/
Replacement of burnt Transformers with the healthy transformers under EDD Balarampur.
ROUTINE, BREAKDOWN MAINTENANCE OF HT/ LT TRANSFORMERS, VENTILATION SYSTEM AND OVERHAULING OF LT TRANSFORMER OF 3X210 MW, ATPS, ANPARA SONEBHADRA AS PER SCOPE OF WORK
Increasing capacity of various transformers and installation of extra transformer, earthing, plinth, fencing work under the area of EDC, Lalitpur under Business Plan 2024-25
Transportation of 1x40 MVA, 132/33 KV Power Transformer (with accessories) from 220 KV S/S Sikandra (Agra) and balance accessories from 132 KV S/S Bodla (Agra) to 132 KV S/S Sasni (Hathras) under ETD, Hathras
Schedule of works for construcion of wire mess fencing on differnence medium power transformer in area of E.D.S.D.-I, Shuklaganj, Unnao in area of 33/11 K.V. S/s Gokul Baba ( Feeder No. - 1 ) under EDD-II, Unnao.
Schedule of works for construcion of wire mess fencing on differnence medium power transformer in area of E.D.S.D.-I, Shuklaganj, Unnao in area of 33/11 K.V. S/s Gokul Baba ( Feeder No. - 1 ) under EDD-II, Unnao.
For the Works of Maintenance and Replacement of LT/HT Side Bushing Rod, Bushing and Gasket Set of 250/400 KVA Medium Power Transformer at Installed Various 11/0.4 KV LT Sub-Stations of Under EUDD-I, Meerut.
Custom Bid for Services - Procurement of consultancy services for repair maintenance of power transformer of 5MVA capacity SM No 160194 NES No L 2522C at MRS Bareilly Cantt under GE West Bareilly Similar Category Backup as a Service
Quantum of works schedule of construction wire mess fencing on different medium power transformer in 33/11 KV substation F-84 at different places in the area of EDSD-II, Safipur, under Electricity Distribution Division-IV, Bangarmau, Unnao.
REWINDING, REPAIRING AND SERVICING OF COOLING FANS FOR SUMMER SEASON ( FOR A PERIOD OF SIX MONTHS) 315 AND 500 MVA I POWER TRANSFORMER AT 400 KV SUB STATION, MOTIRAM ADDA, GORAKHPUR. UNDER E400 KV S/S DIVISION GORAKHPUR
The work of Annual maintenance of the established power transformer at various 33/11 KV Sub Stations under the Electricity Urban Distribution Division Alambagh, Amausi Zone Lucknow against O AND M head for the financial year 2025-26.
Schedule of works for construcion of wire mess fencing on differnence medium power transformer in area of E.D.S.D.-I, Shuklaganj, Unnao in area of 33/11 K.V. S/s Gokul Baba ( Feeder No. - 1 ) under EDD-II, Unnao
The Work related to Replacement/repair of damaged WTI, OTI and Marsline of Power Transformer installed at 33/11 KV Sub Station in the are of UEDD-III/V/VI and VIII, Varanasi Under EE, UETD-II, Varanasi.
REPLACEMENT OF DAMAGED PACKING AND REPAIRING OF OIL LECKAGE IN 33BY11 KV SUBSTATION MANCHHANA 8 MVA JAGEER 5 MVA CIVIL LINE RURAL 5 MVA AND BAKHATPUR 5 MVA FOR 04 NOS VARIOUS POWER TRANSFORMER UNDER EDD II MAINPURI
Construction of 01 No. 132kV GIS Bay and 01 No. 33kV GIS Bay includes Erection and Commissioning of 01 No. 63MVA Power Transformer for Increasing Capacity Work at Existing 220kV GIS KP-5, Gr. Noida on Turnkey Basis
Stopping of oil leakage including the work of Replacement of damaged Gasket,Top cover,Radiator and oil seal and packing of 10MVA Power Transformer in 33/11KV S/S Ahibaranpur,under the jurisdiction of EUDD-Daliganj, LESA, Lucknow.
Supply of 10 MVA Power Transformer for construction of New 33 KV Substations and augmentation of existing 33 KV Substations on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India
Supply of 5 MVA Power Transformer for construction of New 33 KV Substations and augmentation of existing 33 KV Substations on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India.
Supply of 10 MVA Power Transformer for construction of New 33 KV Substations and augmentation of existing 33 KV Substations on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India
stoppage of oil leakage from 200 MVA TF (Aditya make) and 160 MVA 220/132 KV TF (EMCO make) and 63 MVA TF-1 (BBL make) at 220 KV Sub-station Nara under Electricity Transmission Division, Muzaffarnagar
POWER TRANSFORMER PROTECTION WORK UNDER EDD-II LONI
Maintenance of Power Transformer under EDD-II, Mainpuri
Maintenance of Power Transformer under EDD-I, Mainpuri.
Maintenance of Power Transformer under EDD-III, Mainpuri
work of cleaning of installed medium power Transformer
For Increasing Capacity of Existing Distribution Transformer of Various Capacity and Installation of New Distribution Transformers under Business Plan 2026-27 scheme Under EDD-Aonla
Custom Bid for Services - Installation of additional 5 MVA Power Transformer at existing 33 11 KV substation Devi Road and BHOGAON TEHSIL in district Mainpuri Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance and Installation of Plant Systems/Equipments
For Installation of Additional 11/.4 KV 250 KVA DTR G.P. Katra, Chandrika Nagar, etc AND Increasing capacity of 100 KVA DTR to 250 KVA DTR near Chetganj Chauraha, Lahurabeer Chauraha AND Handaha Baba mandir in the area of UEDD-II, Varanasi under
Installation of Transformers under EDD, Bahraich and Increasing of Transformers under EDD-Nanpara
Quantum of works for replacement of damaged bushing rod, packing and general checking of power transformer and yard related works for 33/11 KV Aira Bhadiyar in the area of E.D.S.D. Kundan Road under Electricity Distribution Division-II, Unnao.
Supply of De-centralized materials and work for Increasing capacity Power Transformer, enhancement of 11/0.4 kV substation, Installation of 11/0.4 kV substation, Construction and bifurcation of 11 kV line and Replacement of Damaged 11 KV V.C.B CHUNAR
Work of replacement damage 05 MVA Power Transformer at 33/11 KV S/s Akta Vihar Moradabad under the jurisdiction of Electricity Urban Distribution Division-III, Moradabad carriage the same from 33/11 KV S/s Junawai, EDD-Babrala.
Work of streamlining cable stretches, mowing, replacement of chemical earthing strip of power Transformer, pruning tree branches near to 11 KV line at various places of Sub station Salempur and Nawada under the area of EE, EUDD I Mathura
Work of installing 11 KV pole on Deval and Surha feeder, pole between 11 KV Mania and installing new TPMO in sub-station Revatipur and earthing work of power transformer at sub-station Bhadaura in Business Plan 2025-26
NUT & BOLT WITH WASHER (10X40 MM), NUT & BOLT WITH WASHER (12X40 MM), ARCHING HORN SET, MS TOP COVER PLATE (FIT WITH 25kVA Distribution Transformer), MS TOP COVER PLATE (FIT WITH 63kVA Distribution Transformer), MS TOP COVER PLATE (FIT WITH 100kVA ... 100kVA Distribution Transformer )
Increasing Capacity of Distribution Transformer and other electrical work against Business Plan 2024-25 (Package No. 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 873, 874, 875, 876, 877, 878, 879
QUANTUM OF WORKS (PART A 55 WORKS) INVOLVED IN INCREASING CAPACITY, ADDITIONAL DISTRIBUTION TRANSFORMER AND OTHER WORK AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2024-25 (1.54 Cr) UNDER THE AREA OF EDSD-II SAFIPUR UNDER THE EDD-IV BANGARMAU UNNAO.
QUANTUM OF WORKS (PART A 30 WORKS) INVOLVED IN INCREASING CAPACITY, ADDITIONAL DISTRIBUTION TRANSFORMER AND OTHER WORK AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2024-25 (2.11 Cr) UNDER THE AREA OF EDSD-III BANGARMAU GRAMIN UNDER THE EDD-IV BANGA