QUANTUM OF WORKS INVOLVED IN PROVIDING DELTA TYPE EARTHING FOR THE NEUTRAL OF POWER TRANSFORMER IN BUSINESS PLAN YEAR 2025-26 UNDER THE AREA OF EDSD-I and III, UNDER THE EDD-P.D. NAGAR, UNNAO.
Work of supply of material for converting the relay from analog to digital of 11KV control panels of 10MVA power transformer No. 02 and 04 in 33/11KV sub-station-Jeevnathpur under EDD-Ist, Chandauli.
21.6/30.24 MVA, 132/27 KV, 50 Hz, single phase ONAN/ONAF type Traction Power Transformer with all accessories required for its commissioning as per packing list and as per RDSO specification no. TI/SP
Silica gel breather for 132 KV/25 KV, 21.6 MVA power transformer capacity 08 kg. poly carbonate clear view body with aluminum top & bottom flange with oil cup, filled with Orange silica gel, model-DTO
Required work for Topup of fresh oil in power Transformer No.-1 and 2 an other related associated work at 33 avam 11 KV sub station Jawahar Bhawan, in the area of EE, EUDD Rajbhawan
Reclamation of Burnt/Dirty/Old transformer oil at Khalasi Line Transformer repairing workshop by providing oil reclamation plant and manpower under EE(Workshop) KESCo.
Quantum of works involved in Additional of different rating Distribution Transformer installation and Construction of PCC/ST pole as per requried on site,EDSD-III Banthar under Divison-II, Unnao. against Business Plan Year 2024-25 part-I .
Providing Fixing of fuse set with fuse wire made by the Bakelite Strip on 11 KV Bushing Road of the 25 KVA to 100 KVA Distribution Transformer UNDER JURISDICTION OF E.E., EDD, CESS-IV, CISS GOMTI, LESA, Lucknow
Quantum of works involved in Additional of different rating Distribution Transformer installation and Construction of PCC/ST pole as per requried on site,EDSD-I Shuklaganj under Divison-II, Unnao. against Business Plan Year 2024-25 part-I.
The work of shifting of 11 KV line and distribution transformer obstructing the widening of Balawali Feena Marg Mandawar Pitam Singh from Chainage 22.450 to 26.575 Bahadurpur against sanctioned deposit package no. 03/2025-26 under EDD, Kiratpur.
Quantum of works involved in Increasing capacity of different rating Distribution Transformer installation/ new and Construction of PCC/ST pole as per requried on site,EDSD-I Shuklaganj under Divison-II, Unnao. against Business Plan Year 2024-25
Work of 11 KV Feeder Bifarcation, Installation of various Distribution Transformer, Damaged ABC cable, 11 KV incoming An outgoing VCB in Additional Business Plan 2023-24 again Work of 11 KV Feeder Bifarcation, Installation of various Distribution Tra
SCHEDULE OF RATES AND QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER, REPLACEMENT AND OTHER WORKS) UNDER THE SPECIAL BUSINESS PLAN YEAR 2023-24 IN THE AREA OF E.D.S.D.-III, MIYAGANJ UNDER E.D.D. V, HASANGANJ, UNNAO.
Quantum of works involved in erection of wire mess fencing on different medium power distribution transformer of 33/11 KV substation Aurash and Miyaganj in the area of EDSD-III, Miyaganj, under Electricity Distribution Division-V, Hasanganj, Unnao.
Supply of 11/0.433 KV, 25 KVA, 1 Star Rating Previously Level-2 now Level-1 (as per IS 1180 (Part-I) 2014 (Amendment-4) Aluminum Wound Distribution Transformer BIS Certified with ICB and External HT Fuse Set
QUANTUM OF WORKS INVOLVED IN REPLACEMENT OF OLD AND JARJAR WIRE WITH PROVIDING ADDITIONAL POLE TO REDUCE SPAN LENGTH OF 11 KV AND L.T. LINE AND INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER DUE TO OVELOADING AT DIFF. SITES UNDER
QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF 25 kva to 63 Kva DISTRIBUTION TRANSFORMER AND OTHER RELATED WORKS IN THE AREA OF E.D.S.D.-II, HASANGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR 2026-27.
QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF 25 KVA TO 100 KVA DISTRIBUTION TRANSFORMER AND OTHER RELATED WORKS IN THE AREA OF E.D.S.D.-III, MIYAGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR 2026-27.
Supply of 60 KVA 750V/415V AC 3 phase dry type power distribution transformer for EOG LHB coaches as per RDSO's SPEC no. RDSO/PE/SPEC/AC/0184-2018 (Rev-1). Make:-Vimal/RAMYA/ MLI/RISHAB/AUTOMATIC ELEC
9 KVA, 750 V / 415 V / 190 V AC, 3 Phase, Star - Star - Star, Dry Type and air cooled power distribution transformer to RDSO Specification No. RDSO/PE/SPEC/TL/0158-2010 (Rev.1), Type I. Warranty Perio
Dry type power distribution transformer, 60 KVA capacity, 750/415V, input 750 volt 3 phase 4 wire, output 415V 3 phase 4 wire confirming to RDSO spec No. RDSO/PE/Spec/AC/0080 (Rev. -1) 2007 suitable f
9 KVA, 750V415V/190V. AC, 3 phase, Star- Star - Star, Dry type air cooled power distribution transformer for LHB type Coaches. As per RDSO/PE/SPEC/TL/0158-2010, Rev.-1,Type-1. Note:- 1- To be procured
15 KVA, 750V AC/415 V/190 V AC, 3-phase, star-star-star (Yyy), Dry type, air cooled power distribution transformer confirming to RDSO specification No. RDSO/PE/SPEC/TL/0158-2010 (Rev-0) or latest suit
9 kVA, 750 V/415 V/190 V, 3 phase Dry Type Distribution Transformer (Type. I) to RDSO specification No.RDSO/PE /SPEC/TL/0158-2010 (Rev-0) with all accessories as per scope of supply Make / Brand : VIM
9KVA 750V/415V/190V AC, 3-PHASE,STAR-STAR-STAR[YYY], DRY TYPE,AIR COOLED POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE NON-AC EOG COACHES as per DRAWING/SPECIFICATION: RDSO/PE/SPEC/TL/0158-2010,REV-0,TY
15KVA,750V/415V/190V AC 3Phase,Star-Star-Star (Yyy) Dry Type and Air Cooled Power Distribution Transformer for LHB Type Non AC Coaches as per Specn. RDSO/PE/SPEC/TL/0158-2010 ( Rev-1) or latest Make
15 KVA, 750V AC/415 V/190 V AC, 3-phase, star-star-star (Yyy), Dry type, air cooled power distribution transformer confirming to RDSO specification No. RDSO/PE/SPEC/TL/0158-2010 (Rev-1) or latest suit
Supply of 63 KVA Distribution Transformer for construction of New 33 KV Substations and Augmentation of existing 33 KV Substations on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India.
VARIOUS ELECTRICAL WORK DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT INSTALLATION OF DISTRIBUTION TRANSFORMER STRENGTHENING OF 11 KV LINE NEW AND REPAIRING OF LT LINES
Transformer Package- TR-27A for procurement of Transformers under SIS reserve fund, NERPC requirement & Add-Cap
Replacement of damaged/burnt transformer with healthy transformers in the area under EDD-III(Colonelganj) Gonda.
BP 2025-26 Distribution Transformer Increasing Capacity additional
work for distribution transformer plinth fencing and earthing
Increasing Capacity from 1x5MVA to 2x5MVA
Schedule of works for construction of wire mess fencing on difference medium power transformer in area of different places in the Town AND Rural area of E.D.S.D.-I, Hasanganj under Electricity Distribution Division-V, Hasanganj, Unnao
Installation 400 KVA T/F with Mobile Trolly AND Supply AND Errection of Chemical Earthing and connection with Power Transformer in the area of Uedd-IV, Varanasi under System Augmentation /System strengthening work Plan 2023-24
Repairing/overhauling of Power Transformer installed at 33/11 KV Sub Station at 33/11 KV Obri, JP Nagar and Badel Sub Stations under the Jurisdiction of EE,EDD,Barabanki 1st UNDER EDC BARABANKI, MVVNL, BARABANKI
Testing of protective system of power transformer, 11 KV switchgear and 33 KV control panels installed at various 33/11 KV Sub-Stations, in administrative area of EUDC-X, LESA Transgomti, in Lucknow district of MVVNL.
Increasing Capacity for Power Transformer of 33,11 KV S.S. Goithaha, Replacement of 33 VCB, Replacement of Component in Different 33,11KV S.S. Interlinking of 33KV Line in Switchyard, Replacement of earth strip and construction of earth pit
For Annual routine testing work of power transformer 33 KV 11 KV breaker panel their incoming and outgoing installed at various substation against M and R head under the area of EUTD V Transgomti LESA Lucknow
Works of streamlining cable stretches mowing, replacement of chemical earthing strip of power, transformer painting of other associated structures, pruning tree branches near to 11 KV line of Bangali Ghat substation under EE, EUDD I, Mathura
Carrying out various electric works for arresting oil leakage from 10 MVA power transformer installed at 33 KV Sub Station Chatikara under the area of EE, EUDD II, Mathura in the jurisdiction of SE, EUDC, Mathura
Carrying out various electric works for arresting oil leakage from 5 MVA power transformer installed at 33 KV Sub Station Akashwani under the area of EE, EUDD III, Mathura in the jurisdiction of SE, EUDC, Mathura
Replacement of Burnt/Damaged Transformers with Repaired/New Transformer of Electricity Distribution Division, Rudauli (Town Area) Under Electricity Distribution Division-Rudauli ,Faizabad
QUANTUM OF WORKS INVOLVED IN DIFFERENT WORK (INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER, REPLACEMENT OF OLD AND JARJAR BATTERY ANDCHARGER SET) UNDER THE SPECIAL BUSINESS PLAN YEAR 2023-24 UNDER THE AREA OF EDSD-BHAGWANT NAGAR UNDER THE EDD-PURWA
Preparation of DPR with estimate including SCADA System for conversion of HT (33KV and 11KV)/LT over head lines to undergrounding, erection of distribution transformer and electrical connection of consumer from over head to underground with GPS and o
3KVA, 750V/415V, 3 PHASE DRY TYPE DISTRIBUTION TRANSFORMER FOR LHB HOG /EOG HIGH CAPACITY PARCEL VAN (LVPH) COACH, AS PER RCF SPECIFICATION EDTS- 409 REV-Nil or latest. Conforming with Annexure A to SPECIFICATION EDTS-409 REV- Nil.
Quantum of works involved in Additional of different rating Distribution Transformer installation and Construction of PCC/ST pole as per requried on site,EDSD-IV Kundan Road under Divison-II, Unnao. against Business Plan Year 2024-25 part-I.
Quantum of works involved in Increasing capacity of different rating Distribution Transformer installation/ new and Construction of PCC/ST pole as per requried on site,EDSD-IV Kundan Road under Divison-II, Unnao. against Business Plan Year 2024-25
Quantum of works involved in Increasing capacity of different rating Distribution Transformer installation/ new and Construction of PCC/ST pole as per requried on site,EDSD-II Magarwara under Divison-II, Unnao. against Business Plan Year 2024-25 p