Loading…
Loading…
15,045 results • Best match
Quantum of work attending oil lekage Power Transformer 05 MVA related work at 33/11 KV sub station Mawai, Unnao under area of EDSD-III, Maurawan of Electricity Distribution Division-III, Purwa, Unnao
Quantum of work attending oil lekage Power Transformer 05 MVA related work at 33/11 KV sub station Pathakpur, Unnao under area of EDSD-III, Purwa of Electricity Distribution Division-III, Purwa, Unnao.
Providing of Heavy Duty Cooler for cooling of power transformer installed at various 33/11 KV Sub Station under Jurisdiction SE. EDC, Lucknow Rural, Amousi Area, Lucknow as rental basis for One month
QUANTUM OF WORKS INVOLVED IN PROVIDING DELTA TYPE EARTHING FOR THE NEUTRAL OF POWER TRANSFORMER IN BUSINESS PLAN YEAR 2025-26 UNDER THE AREA OF EDSD-II, UNDER THE EDD-P.D. NAGAR, UNNAO.
Quantum of work attending oil lekage Power Transformer 05 MVA related work at 33/11 KV sub station Miyaganj, Unnao under area of EDSD-III, Miyaganj of Electricity Distribution Division-V, Hasanganj, Unnao
Execution work of Testing of Protective System of 33/11 KV System of Various Power Transformer and Switch gear, in the area Division-Chinhat, under the Jurisdiction of EUTD-II, Gomtinagar, LESA Lucknow
Stoppage Leakage of 10/08/05 MVA Power Transformer and Other Associated works at various 33/11 KV Sub Stations in the area EDSD-III, Bhola under the jurisdiction of EDD-III, Meerut
Execution work of Testing of Protective System of 33/11 KV System of Various Power Transformer and Switch gear, in the area Division-Gomtinagar, under the Jurisdiction of EUTD-II, Gomtinagar, LESA Lucknow
QUANTUM OF WORKS INVOLVED IN PROVIDING BOARING TYPE EARTHING FOR BODY OF POWER TRANSFORMER IN BUSINESS PLAN YEAR 2025-26 UNDER THE AREA OF EDSD-I and III, UNDER EDD-P.D. NAGAR, UNNAO
Quantum of work for Maintenance of 33/11 KV 05 MVA power transformer installation at 33/11 KV Substation Bihar, Unnao in the area of EDSD-Bhagwant Nagar under EDD-III, Purwa, Unnao
Testing of 33 KV Feeder panel breakers, Power Transformer and 11 KV incoming/outgoing panel installed at EDD, CESS-I/II/III/IV UNDER JURISDICTION OF E.E., EDT-IX, CISS GOMTI, LESA, Lucknow
Additional system strengthening work augmentation of Power Transformer 5 MVA to 10 MVA on Partial Turnkey in Varanasi, Prayagraj and Azamgarh Zone of Uttar Pradesh under Deen Dayal Upadhyay Gram Jyoti Yojana New
Required work for Topup of fresh oil in power Transformer No.1 and 2 an other related associated work at 33 avam11 KV sub station Dalibagh, in the area of EE, EUDD Rajbhawan
Name of material for supply / work. Stopping of oil leakage from 10 M.V.A. Power Transformer No. 01 intalled at 33/11 K.V. Sub-Station R.D.S.O. in the area of E.U.D.D-Aishbagh, LESA, Lucknow.
pipe earthing for power transformer
CRGO Lamination for Power Transformer
work for power transformer repairing
CRGO Lamination for Power Transformer
Professional Painting Service - Power Transformers; NA; Power Transformers
Water Level Earthing Neutral and Body for following Power Transformer at 33 KV Sub Station Under Sub Divisional Officer Electricity Distribution Sub Division Sambhal
QUANTUM OF WORKS INVOLVED IN PROVIDING PROTECTION SYSTEM AT H.T. AND L.T. SIDE OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2024-25 UNDER THE AREA OF EDSD-II, UNDER THE EDD-I UNNAO.
For the Work of Installation of 250 KVA New Distribution Transformer, 33/11 KV Line Improvement and Protection Work Under Business Plan 2025-26 in the Area of EUDD 11 KV and LT Line South, Meerut.
REPAIR MAINT OVERHAULING OIL TOP UP AND OTHER ALLIED WORKS OF DISTRIBUTION TRANSFORMER OF VARIOUS CAPACITY AT TECH AREA AND REPAIR MAINTENANCE OF 11 KV VCB RELAY PANELS BUSBAR AND OTHER ALLIED WORKS AT AFS KANPUR
Quntam of work involved in increasing capacity of distribution transformer installation/ new and construction of PCC/ST pole as per required on site, EDSD-II Magarwara under EDD II UNNAO Under BP 2023-24 (20 Cr).
QUANTUM OF WORKS INVOLVED IN PROVIDING PROTECTION SYSTEM AT H.T. AND L.T. SIDE OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2024-25 UNDER THE AREA OF EDSD-I, UNDER THE EDD-I UNNAO.
Work of installation pipe earthing of 250 KVA and 400 KVA distribution transformer in view of tripping and safety and installation of 100 KVA T/F in Additional Business Plan 2024-25 under EDD-Saidpur, Ghazipur
Quntam of work involved in increasing capacity of distribution transformer installation/ new and construction of PCC/ST pole as per required on site, EDSD III Banther under EDD II UNNAO Under BP 2023-24 (20 Cr).
QUANTUM OF WORKS INVOLVED IN PROVIDING PROTECTION SYSTEM AT H.T. AND L.T. SIDE OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2024-25 UNDER THE AREA OF EDSD-III, UNDER THE EDD-I UNNAO.
The Work for increasing capacity of 400/630KVA T/F by Installation of additional 250 KVA T/F AND Increasing capacity of Distribution Transformer from 250 to 400 KVA in the area of UEDD-VI, Varanasi
QUANTUM OF WORKS INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2024-25 UNDER THE AREA OF 33/11 KV S/S BICHHIYA UNNAO, UNDER EDSD-III, EDD-I UNNAO.
QUANTUM OF WORKS INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2024-25 UNDER THE AREA OF 33/11 KV S/S MAKHI UNNAO, UNDER EDSD-III, EDD-I UNNAO.
Increasing capacity of distribution Transformer and other electrical work against Business plan 23-24 UNDER JURISDICTION OF E.E., EDD, CESS-I/II, CISS GOMTI, LESA, Lucknow (Package No. 153, 154, 147, 148 and 150/23-24
9 KVA, 750V/415V/190V, 3 Phase Dry Type Distribution Transformer for LHB Type Non AC EOG Coaches Conforming to RDSO's Specification No: RDSO/PE/SPEC/TL/0158-2010 (Rev-1), Type 1 or Latest. Accepted
Anti vibration mounting pad (AVM) for 60 KVA ,750/415 3 Phi D8 Dry type distribution transformer for LHB type EOG/AC coaches confirming to RDSO specification no RDSO/PE/SPEC/AC/0080-2007 (Rev-2).
9KVA 750V/415V/ 190V AC, 3 Phase, Dry Type Distribution Transformer as per Specification No. RDSO/PE/SPEC/TL/0158-2010, REV-0 (TYPE-1) along with RCF Corr-1 with EDML-225. Packing Instruction - SPI146
9KVA 750V / 415V / 190V AC, 3-PHASE, STAR-STAR-STAR, DRY TYPE, AIR COOLED POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE COACHES CONFIRMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/0158-2010,REV-1,TYPE-1 S
Out door type distribution transformer copper wound 11/0.415KV,3Phase,50Hz,250KVA capacity as per BIS specification no.2026(part-1)/2011 or latest and first filling of oil as per BIS 335/1993 OR LATES
15 KVA,750V/415V/190V AC, 3 Phase,Stare-Stare-Stare (Yyy), Dry Type and Air Cooled Power Distribution Transformer suitable for pantry car load & train lighting load (10.5 KVA-415AC + 4.5 KVA-190 AC) o
9KVA 750V / 415V / 190V AC, 3-PHASE, STAR-STAR-STAR, DRY TYPE, AIR COOLED POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE COACHES CONFIRMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/0158-2010,REV-1,TYPE-1 S
9KVA 750V / 415V / 190V AC, 3-PHASE, STAR-STAR-STAR, DRY TYPE, AIR COOLED POWER DISTRIBUTION TRANSFORMER FOR LHB TYPE COACHES CONFIRMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/0158-2010,REV-1,TYPE-1 S
9 KVA, 750V/415V/190V AC, 3 Phase, Star-Star-Star, Dry type, Air Cooled Power distribution Transformer for LHB type coaches. RDSO/PE/SPEC/TL/0158-2010, REV-1, Type-1, , Packing Instruction: PI146 VER
Installation of New Transformer against Overloaded Transformers in the head Increasing Capacity
Testing of 33KV incoming Breaker and Panel, 33KV Transformers Breakers and Transformer Panel protection, 33KV Incoming/ Outgoing Breaker Panel and complete testing of 5/8/10 MVA Power Transformers installed at various 33/11KV Substations
Increasing capacity of 33kv s.s Kotwali district bijnor
Increasing capacity of 33kv s.s Rajpura
Increasing capacity of 33kv s.s Bhaguwala, district Bijnor
MAKING OF DAMAGED TRANSFORMER PLINTH AND EARTHING OF DISTRIBUTION TRANSFORMER
REPAIR/MAINTENANCE OF DISTRIBUTION TRANSFORMERS AND CONNECTED WORKS AND REPAIR/MAINTENANCE/REPLACEMENT TRANSFORMER PANEL AT VARIOUS LOCATIONS UNDER GE E/M LUCKNOW
Overhauling of HT,LT motors, transformers, electrical work, maintenance of PA System and transformer in CHP area and works, PTPP, Parichha, Jhansi
Quantum of work for Maintenance of 33/11 KV 05 MVA No. 02 power transformer installation at 33/11 KV Substation Bighapur, Unnao in the area of EDSD-Patan under EDD-III, Purwa, Unnao.