Loading…
Loading…
15,054 results • Best match
Increasing Capacity Of Transformers
WORK MENTIONED IN BOQ
Quantum of works involved for minor maintenance and replacement of old damaged gaskets from top cover, bushing, radiators and other of power transformer no. -1 at 33/11 KV Ibrahimbagh, Unnao the area of EDSD-II, under of Electricity Distribution D
Work of increasing the capacity of power transformer under EDD-I, Mau and EDD-II, Mau and work of installation/repair of CT, PT, LA, Bus Isolator, Line Isolator, Control Panel under EDD-II, Mau in 20 cr per district plan
Quantum of works involved for minor maintenance and replacement of old damaged gaskets from top cover, bushing, radiators and other of power transformer no. -1 at 33/11 KV P.D. Nagar, Unnao the area of EDSD-II, under of Electricity Distribution
For the work of IDMT Relay, Master Relay, Master Relay and WTM and OTM, Auxiliary Relay etc,. for Power Transformer installed at different 33/11 KV Sub-Station Under Business Plan 2025-26 in the Area Eudd-33 KV Line, Meerut.
For the Work of Vacuum Chamber, Earth Tester Digital, Fuse Wire, Toolkit, Power Transformer Testing Kit, Water Level Earthing etc., Different 33/11 KV Sub-Station Under Business Plan 2025-26 in the Area EE EUDD-33 KV Line, Meerut.
Construction of 01 No. 220kV GIS Bay and 33kV GIS Bay which also includes erection and commissioning of 01 No. 60MVA Power Transformer (To be provided by UPPTCL) for increasing capacity work (2x60MVA to 3x60MVA) at 220kV GIS Substation Phoolbagh
Electrical Testing Division- Mau, for the protection of power Transformer due to faults in VCB, control panel etc. from time to time, repairing and repair work is done to protect the above mentioned VCB, control panel etc. from getting damaged.
Supply of De-centralized materials and work for Increasing capacity Power Transformer, Increasing capacity 11/0.4 kV substation, Installation of 11/0.4 kV substation,Replacement of Damaged 33/ 11 kV line Mirzapur in additional B.P 24-25 EDD-II MZP
MEMU ITEM :-Connector for SIEMENS make power Transformer consists of 02 items. (1) 51 F22/31 Connection Pipe F22/31 DIN 42551 Qty = 01 No. (2) 51 F H22/1 reduction H 22/1'' DIN 42551 Qty = 01 No. Redu
Offer for execution of work required for Removal of leakage of oil in the power Transformer 10 MVA No.2 installed at 33/11 KV sub station Jawahar Bhawan with cold welding compound under the jurisdiction of Executive Engineer Rajbhawan
Construction of 01 No. 220 kV GIS Bay and 33kV GIS Bay which also includes erection and commissioning of 01 no. 60 MVA Power Transformer for increasing capacity work( 3x60MVA to 4x60MVA) at Existing 220 kV GIS Substation Kanpur Road, Lucknow
Repairing and Overhaling of Power Transformer of 33/11 KV Sub-Station Sohawal Tehseel Power Transformer No.-1 Under Electricity Distribution Division-Rudauli, Ayodhya
Repairing and Overhaling of 5 MVA Power Transformer of 33/11 KV Sub-Station Daudhi Spare Power Transformer Under Electricity Distribution Division-Rudauli Ayodhya
Procurement of WTI and OTI for EHV transformer at NTPC Sipat (Q3), Procurement of OTI/WTI FOR POWER TRANSFORMERS AND AUX TRANSFORMERS FOR NTPC DADRI (Q3), OTI/WTI FOR POWER TRANSFORMERS AND AUX TRANSFORMERS FOR NTPC DADRI. (Q3)
work of replacement of damaged LT Transformers by new/repaired Transformers RAPDRP CHANDPUR TOWN
Gasket Sets for 630 KVA Distribution Transformers, Gasket Sets for 1000 KVA Distribution Transformers
Supply of 33/11 KV, 10 MVA, Power Transformer
33/11 KV, 10 MVA Power Transformer (DDUGJY scheme)
33/11 KV, 10 MVA Power Transformer (DDUGJY scheme)
Over hauling of ESP MCC HVR Transformers and Centrifuging of HVR Transformer Oil installed in Unit No 4
The work of increasing capacity of the transformer and installation additional transformation for removes the overloading of transformers under Electricity Urban Distribution Division-I/II/III, Muzaffarnagar
Complete and Minor overhauling 1.6MVA 6.6/0.4kV Service transformers (UST-11A, 11B, ESP-11A 11B Ash handling Transformer-11A 11B) during overhauling of unit-11 BTPS Obra
Complete and Minor overhauling 1.6MVA 6.6 0.4kV Service transformers (UST-13A 13B, ESP-13A 13B, Ash handling Transformer-13A 13B during overhauling of unit-13 BTPS Obra
Appointment of Agency for Installation of RCC Pilar Tarbad with Grouting outside the Periphery of Diffrent Forest Block of Range Dhaurahra North Nighasan South Nighasan Palia Majhgai Ranges of North Kheri Forest Division Buffer Zone DTR Kheri
ENQ ITEM 01 U LINK RING AS PER DRG 44990300018 REV03 ITEM 02 MTL PHOSPHOROUS BRONZE GR III HE IS 7814 1985 ST 604607 ENQ ITEM 02 U LINK RING AS PER DRG 44990300018 REV03 ITEM 03 MTL PHOSPHOROUS BRONZE GR III HE IS 7814 1985 ST 604888
WORK MENTIONED IN BOQ
WORK MENTIONED IN BOQ
Work of Overhauling of Transformers and gasket replacement of UT and UAT transformers of Unit 7 of 2X500MW, DTPP, Anpara
For Increasing Capacity of 31 Nos Existing Distribution Transformer and Installation of 10 Nos New Distribution Transformer of Various Capacity under Additional Business Plan scheme under EDD-Aonla
For Increasing Capacity of 13 Nos Existing Distribution Transformer and Installation of 4 Nos New Distribution Transformer of Various Capacity under Additional Business Plan scheme under EDD-Baheri
Construction of RCC drain from transformer to pond in village Jajumai
100 KVA Al. Wound Level 2 Transformers
Requirement of Lugs of Medium Power T/f and Distribution Transformer
Providing and Fixing FRP fencing including Civil work at distribution Transformer
Requirement of Lugs of Medium Power T/f and Distribution Transformer
Work of 20 No Fencing the distribution transformer Under EDC Orai
QUANTUM OF WORKS INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2024-25 UNDER THE AREA OF 33/11 KV S/S AWAS VIKAS AND 33/11 KV S/S SONIK UNNAO, UNDER EDSD-IANDIII, EDD-I UNNAO.
For providing and fixing of FRP fencing including civil work at distribution transformer at 11 KV Feeder at 630 KVA near Ansari Shop and at 400 KVA Prabhatpuram and against M and R work in the area of Substation Faizullaganj under EUDD Sitapur road
For providing and fixing of FRP fencing including civil work at distribution transformer 2 no 400 KVA Gaushala Indrapuri Ajij Nagar and 630 KVA Basant vihar near Sairabano against M and R work in the area of substation GSI under EUDD Sitapur road Tr
REPAIR MAINT OVERHAULING OIL TOP UP AND OTHER ALLIED WORKS OF DISTRIBUTION TRANSFORMER OF VARIOUS CAPACITY AT DOMESTIC AREA AT AFS KANPUR AND REPAIR/MAINT OF 33/11 SUB STATION EQUIPMENTS AND 11 KV SUB STATIONS EQUIPMENTS CONTROL PANEL 33 KV CT/PT A
For Laying 33KV Double Ckt. U/G cable in faulty section of 33KV water works in road crossing in frount of 33/11KV Bhelupur S/s under (Grishmakaleen) Business Plan2022-23 AND For Increasing capacity of 1 no. 11/0.4KV Distribution Transformer from 100K
Strengthening Work of 33 KV Line, Strengthening Work of 11 KV Line, Strengthening and Protection of 33 11 KV Sub-stations, 11 KV VCB Work, 33 KV VCB Work, Switch Yard Work 11 0.4 KV Distribution Transformer Plinth Fencing Earthing Work BP 2026-27
increasing capacity of distribution Transformer from 25 KVA to 63 KVA, 63 KVA to 100 KVA, 100 KVA to 250 KVA, 160 KVA to 250 KVA AND 250 KVA to 400 KVA in Buisness Plan 2017-18 Under juridiction of EDD-I/II, Hardoi
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under Sub-Division-III, Sitapur in the juridiction of EDD-I, Sitapur.
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under Sub-Division-I, Sitapur in the juridiction of EDD-I, Sitapur.
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under Sub-Division-II, Sitapur in the juridiction of EDD-I, Sitapur.
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under Sub-Division-Sidhauli, Sitapur in the juridiction of EDD-II, Sitapur.
Increasing capacity of distribution Transformer from 10/16 to 25 KVA, 25 to 63 KVA, 63 to 100 KVA, 100 to 250 KVA, 250 KVA to 400 KVA in Business Plan 2017-18 Under Sub-Division Laharpur, Sitapur in the juridiction of EDD-II, Sitapur.