Loading…
Loading…
74 live40 closing this weekmost from Eastern Railway and South Eastern Railway
74 results • Best match
245KV, 1250A Resin Impregnated Paper (RIP) Insulated Transformer Bushing, 2000A Resin Impregnated Paper (RIP) Insulated Transformer Bushing, 420KV, 800A Resin Impregnated Paper (RIP) Insulated Transformer Bushing
complete rewinding and repairing of 63KVA 550V- 440 Volt lighting transformer along with repairing and maintenance of 440Volt domestic overhead line of NHS-LCH Colonies, water treatment plant and its surroundings under Bankola Area.
Supply Installation and Commissioning of Neutral Grounding Resistance NGR Monitoring System along with Winding Temperature and Oil Temperature Indicator Assembly for 01 No 1.2 MVA 6.6kV/3.3kV Transformer at PSLW Workshop Jhanjra Project Colliery
Repairing/ Rewinding of (i) 250 KVA, 3.3KV/440V (ii) 250 KVA, 3.3KV/550V Lighting Transformer Installed at 7 no. Pariharpur village, under Girmit Colliery n sripur power house , sripur colliery respectively under Satgram-Sripur Area.
1.5 Micro Farad, 850V range Capacitors of Epcos or Vishay make in each arm of Star connected to be provided between phase and neutral and phase and earth of each secondary winding 415V, 60 kVA transformer
GUN METAL GATE VALVE 25MM BORE FOR TRANSFORMER OIL PIPE LINE OF BHEL EMUs AS PER KPA WORKSHOP DRG NO. ER/KPA/EL/TF.3HE.581E, ITEM 2.(Q FORM ATTACHED AT F/4 - F/5 ).
Construction Of Foundation of Different Equipment Structure related to installation of transfer bus facility for 3 nos 10MVA 33 11KV Transformer and other allied work at Amtala 132 KV Sub-station under Berhampore Area Office WBSETCL
Repairing/ Rewinding of (i) 250 KVA, 3.3KV/440V n (ii) 250 KVA, 3.3KV/440V Lighting Transformer Installed at sripur bazar substation under sripur Colliery n sripur 03 no sub-station, under sripur colliery respectively under Satgram-Sripur Area.
SPL REPAIR /REPLACEMENT OF OLD GI EARTHING TO CHEMICAL EARTHING OF TRANSFORMER AND PROVN OF 09X2 TON SPLIT AIR CONDITIONER WITH STABILIZER FOR RECREATION HALL AND DINNING HALL OF BDE CAMP-V, BDE WKSP-V AND BDE SIG COY-V UNDER GE (NORTH) BINNAGURI
MOTOR WITH CAPACITOR FOR TRANSFORMER OIL COOLER FOR BG AC EMU COMPLETE WITH FAN 0.5HP, 240V, 2.5 AMPS SINGLE PHASE AC, CAPACITOR START & CAPACITOR RUN AS PER ICF SPECN NO. ICF/ELECT/014 REV-A AND AS PER ICF DRG.NO. ICF/SK-9-0-606 ALONGWITH LATEST AMENDMENT/ ALTERATION IF ANY.
Transformer Oil Testing Kit - Determinat [Transformer Oil Testing Kit - Determination of Acidity of TFP oil Consisting of 06(six) items as follows: (i)Polythene Bottle containing 100 ml Alcohol(or neutral rectified spirit). Qty/set: 01 no. (ii) Polythene Bottle containing 100 ml Sodium Carbonate Solution. Qty/set: 01 no. (iii) Polythene Bottle containing 50 ml Universal Indicator. Qty/set: 01 no. (iv) Set of graduated droppers which serve as pippets (one graduated at 1.1 ml and other two at 1.0 ml). Qty/set: 03 nos. (v) Colour Chart calibrated with neutralized number values. Qty/set: 01 no. (vi) Test tubes 10 ml capacity. Qty/set: 05 nos. (Kit should be recommended by CPRI - Bangalore or Equivalent).]
Repairing of 500 KVA dry type transformer and other allied works at Intake Sub Station under Siliguri Comp WS Scheme
Construction of concrete road from H/O Mritunjay Sau to Transformer at Ward No. 14 within Egra Municipality in the district of Purba Medinipur
Self Starter, Feed Pump Assy, Air Cleaner, Hyd shaft, PTO Shaft yoke, Alternator Assy, Muffler Assy, Transformer power step down, Service Conductor device diode
ADDN/ALTN AND REPAIRS TO TRANSFORMER AONGWITH ALLIED HT SWITCH GEAR, LT PANEL and CABLES AT KV SCHOOL AT CH (EC) UNDER GE (A) KOLKATA
5000LPH Transformer Oil Filtration Plant with 415V 3-Phase input AC supply conforming to IS: 6034 along with a pair of hose 10 meter along with following parameters and accessories- Temperature Gauge, Minimum Breakdown Voltage 55KV, Vacuum Gauge, Timer, All Electrical Data Measuring Meter, Particle Size 0.1 micron content max 0.5 percent by Volume, Capsule Gauge. MAKE- NACH/CBS/TRUHEAT/Equivalent. Confirming to IS: 6034. General Technical Particulars are attached in the ANNEXURE-A.
Servicing and rectification work at 250 KVA AVR,200 KVA Transformer of 11 KV Sub-station of Parsala water supply scheme, Block-Simlapal under BMD, PHE Dte.
Potholes and Patch repair of Bituminous Road from Jaysinchak Transformer towards Pandugram Sitala Mandir at Pandugram under Madhabpur G.P. within Arambag Block in the District of Hooghly.
Potholes and Patch repair of CC Road from Markundu near Sabed Ali house transformer to Mundeswari Bundh under Bhangamora G.P. within Pursurah Block in the District of Hooghly.
Non Comprehensive AMC for a period of 1 year for 2 Nos 1600 KVA HT Transformer and 3 Nos VCB Panel at BRIC NIBMG Kalyani Nadia West Bengal
Improvement of Bituminous Road at B.T Mill More(Lat-24.119393, Long-88.269361) To Transformer Near Ice Cream Mill (Lat-24.120277, Long-88.269512) Ward No-02 of Berhampore Municipality
COVER PROTECTIVE DUST and MOIST SEAL506, COVER PROTECTIVE DUST and MOIST SEAL406, CAPACITOR FIXED CER 4.7, HYBRIDE CIRCUIT DC DC 40W 24V 5VLOWMISC RYT, RELAY VDC VAC I POL TAB ACDC, TRANSFORMER POWER STEP DOWN PRIMARY, CAPACITOR FXD ALEL
Servicing and rectification work at 315 KVA Transformer-I, AVR, LT and HT Panel of 11 KV Sub-station of Water Supply Scheme for Pathardoba and its adjoining Mouzas under Simlapal Water Supply Scheme, Block-Simlapal under BMD, PHE Dte.
SET OF GASKET FOR TRANSFORMER OIL COOLING PUMP MOTOR (MPH) CONSISTING OF 4 ITEMS-- (1) OIL SEAL LARGE = 2 NOS. TO DRG. NO.- LOCO/4/GK/102 (MOD.-B OR LATEST) REF.-1. (2) OIL SEAL SMALL= 2 NOS. TO DRG. NO.- LOCO/4/GK/102 (MOD.-B OR LATEST) REF.-2. (3) GASKET FOR MOTOR TERMINAL BOX= 1 NO. TO DRG. NO.- LOCO/4/GK/065 (MOD.-A OR LATEST). (4) GASKET FOR SUCTION AND DELIVERY PIPE JOINT TO DRG. NO.- LOCO/4/GK/064 (MOD.-B OR LATEST)= 2 NOS. FOR ELECTRIC LOCOS. Shelf life of this item is 12 months.%A0