Loading…
Loading…
5,587 results • Best match
High Voltage fuse rating 2 Amp ,1.2 KV AC for use in Primay circuit of 100VA control transformer of LHB coaches as per Spec no. RDSO/PE/SPEC/TL/0195-2019 (Rev-0) fuse size 8x50 mm. make siba, ferraz,
A set of silicon rubber gasket "O" rings suitable for transformer oil cooling pipes (metalic pipes) flange types A.B. C. D. F. G.K. L. & M as per ABB ID no . 3 EHN 424150 for WAG-9 Loco. As per sheet
SET OF RUBBER BUSH, SET CONSISTS OF 2 ITEMS AS GIVEN BELOW: (1) RUBBER BUSH FOR A- 34 TERMINAL BUSHING AS PER DRG.NO. ELW/BSL/WAM-4/4/113.024 -75 NOS/SET (2) OIL SEAL FOR TRANSFORMER BUSHING (a3,a4,a5
100 VA STEP DOWN TRANSFORMER 750/110 V AC H-CLASS INSULATION SUITABLE FOR LHB NON AC COACHES, CONFIRMING TO RCF SPEC. NO. EDTS-355 REV. 1 AMNDT. 2 specn: RCF SPEC. NO. EDTS-355 REV. 1 AMNDT. 2 BRAND-S
Set of Ball Bearings (i) 6205-C3 and (ii) 3205-BD-XL slovakia, 0045, N041-08, FAG X-Life, or 3205-ATN9, SKF-Explorer for Transformer Oil-Pump of MEDHA and BT make 3-Phase AC EMU (One set consisting of
Set of items for Transformer HETT-5400-0 of WAG7 locomotives.set consists of 02 items 1) S S Bend pipe assembly as per BHEL drg no. 34661950036,Rev.02,Qty-01 No. 2) Elbow as per BHEL drg no. 4466195
Set of Quick Coupling for main transformer of 3 Ph. Locomotives as per CLW Drawing No. CLW/ES/3/SK4/0456, Alt-C of CLW Specification No. CLW/ES/3/0456, Alt-K consisting of the following two items. 1)
High Voltage Fuse Base Of Rating 2A , 1.2 KV AC As Per Part No. 7103401 Of Siba, Suitable For Base Size 8x50mm For Use In Primary Circuit Of 100 VA Or 200VA Control Transformer Of LHB AC/Non AC. as Pe
OIL PUMP WITH MOTOR FOR TRANSFORMER (wound with corona Resistance Wire) FOR WAP-7 & WAG-9 LOCOS. Specn/ Drg No:- CLW'S SPECN. CLW/ES/3/0106/F with Latest and RDSO SPECN. NO.- RDSO/SPEC/E- 10/3/09 MOTO
Set of Nitrile Rubber Gasket for 3 phase Loco Main Transformer to ELW/BSL Sketch No. ELW/BSL/3-PH/SK.No.304, Alt-3. One Set consists of 06 Items 38 Nos. Material and Source of Procurement should be as
HT FUSE LINK (SINGLE BOLTED TYPE) 20 AMP. 3.3/3.6 KV FOR 9KVA TRANSFORMER OF LHB EOG NON AC COACHES AS PER M/S COOPER BUSSMAN CAT NO. 3.6 WDOHS20 CONF TO RDSO SPEC. NO RDSO /PE / SPEC. / TL / 0158-201
Step down transformer (TFVT) for Cab fan input 415 Volts + 5%, output volts 110 Volts + 5% frequency 50 Hz + 3%, rating 300 VA as per CLW Spec. No. CLW/ES/T-29. specn: CLW Spec. No. CLW/ES/T-29. MAKE
SET OF NITRILE RUBBER GASKET FOR 3 PHASE LOCO MAIN TRANSFORMER TO ELW SKETCH No. ELW/BSL/3-PH/SK.No.304 Alt-3. ONE SET CONSISTS OF 06 ITEM 38 Nos. (MATERIAL AND SOURCE OF PROCUREMENT SHOULD BE AS PER
SET OF NITRILE RUBBER GASKET FOR 3 PHASE LOCO MAIN TRANSFORMER AS PER ELW SKETCH NO. ELW/BSL/3-PH/SK.NO.304 ALT-3 Or latest (Sr. no. 01,02,03 ONLY) OR LATEST, CONSISTS OF 03 ITEMS 31 NOS. & ELW SKETCH
HT cable consisting of the following items as par set. 1) Supply of HT Cable complete for Train-18 from roof to transformer to part-1-2317771-5 & drawing No C-2317771-5 of M/s TE connectivity 01-No/se
Transformer Module Primary Voltage (Pos: 224.2/1+2) for WAP-7 & WAG-9 (3 Phase) class of Locomotives. As per [i] CLW Specn. No. CLW/ES/3/0083, Alt.B. [II] CLW's STR No. CLW/2015/ELDO/E/STR/0011, Rev.
Set of Nitrile Rubber Gasket for 3-Phase Loco main transformer as per ELW Sketch No.ELW/BSL/3-PH/SK.No.304, Alt %u2013 3 . One set consist of 6 items,Qty 38 Nos(Material and sources as per RDSO%u2019s
Gaskets for M/s. SHIL make Transformer Oil Pump, to type ACPD175 for 3 phase locos, Set Consists of 4 Items as given below: 1) Terminal Box Nitrile Rubber Gasket part no . SH/OPC/19- 1 no./set 2) Co
SET OF FLAME RETARDANT AND QUICK RELEASE COUPLING HOSE ASSEMBLY FOR 6500/6531 KVA 3-PHASE LOCO TRANSFORMER, SET CONSISTS OF 07 ITEMS IN 09 NOS. AS PER SKETCH NO. ELS/AQ/WAG-9/SK.NO.0012, REV-1. (1) FL
HRC FUSE LINK 125 AMPS,415V AC,ROUND BOLTED TYPE CENTRAL TAG FOR TRANSFORMER AUXILIARY CIRCUIT OF EMU. As per IS: 13703 (Part 2/Sec 2)- 1993 ref. B2. Spec/Drg No- As per IS: 13703 (Part 2/Sec 2)- 1993
High voltage bushing with fittings for 3 phase loco main transformer as per CLW Spec No. CLW/ES/3/0456, Alt-I or latest and item no. 11 of CLW Drg. No. CLW/ES/3/SK-5/0456 or latest
RMO sub-station equipments (2x400 KVA) Transformer, DG Set i/c Compound Light, LTOH line, IEI and Fans for Hospital Building, Residential Qtrs. Type-I-26 nos., Type-II-07 Nos., Type-III-02 Nos., Type-IV-04 Nos. and Type-V-04 Nos. in the Building of ... , Transformer , ... Equipments, Transformer , ...
System improvement work by drawl of HT LT line with installation of RMU, DTR, LT Kiosk, FPB, DB etc at DA DB block AA- I under Newtown Division
System improvement work by drawl of HT LT line with installation of RMU DTR, LT Kiosk FPB, DB etc at DE DF block, AA- I under Newtown Division
Development of Infrastructure for conversion of existing Overhead structure to HTUG Cable/Installation of RMU/ DTR at different locations under Bolpur Municipality under Bolpur Division under Birbhum Region.
Supply, Delivery of LT Distribution Box (Size H-700mmX W-484mm X D-214mm and made of Sheet Moulding Compound (SMC) suitable for 25KVA DTR for Egra Division
Supply Delivery of LT Distribution Box suitable for 25KVA and 100KVA DTR (Make Indo, Macedon, or RMW along with dealership certificate ) for Haldia Div of Purba Medinipur Region
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in semi-urban and rural areas of Arambag Division under Hooghly Region
Emergent repairing of transformer Burnt HT gear, GEC make old switch gear servicing of old LT unit including --- cable with supply of transformer oil packing bush stud etc. and painting HT gear and transformer within water tank no.16 under BMC.
10_M5425056017_Unchahar, 20_M5425056017_Dadri, 30_M5425056017_korba, 40_M5425056017_farakka, 50_M5425056017_Talcher, 60_M5425056017_Barh, 70_M5425056017_NorthKaranpura, 80_M5425056017_Solapur, 90_M5425056017_Gadarwara, 100_M5425056017_Khargone, 110_M5425056017_Sipat, 120_M5425056017_Nabinagar, 130_M5425056017_Vindhyachal, 140_M5425056017_Ramagundam, 150_M5425056017_Tanda
Supply of 1600 kVA, 6.6 kV-440V oil fill, Supply of Earth Pits materials, Supply of Sandwich type Al Bus Duct of 3, Supply of 3CX240 sqmm, 11kV grade, XLPE, Supply of end Termination kit for 3X 240, Installations and Commissioning of 1600 kV, Dismantling of existing 1000 kVA Transfo, HT Cable Termination of 3X 240 sqmm, 11k, Construction of Earth Pits, CEA certification from Competent Authori
WB/HOW/SHY-II/NIT-20/2023-24
10_600 LPH SILICON OIL FILTERATION MACHINE, 20_600 LPH SILICON OIL FILTERATION MACHINE, 30_600 LPH SILICON OIL FILTERATION MACHINE, 40_600 LPH SILICON OIL FILTERATION MACHINE, 50_600 LPH SILICON OIL FILTERATION MACHINE, 60_600 LPH SILICON OIL FILTERATION MACHINE, 70_600 LPH SILICON OIL FILTERATION MACHINE, 80_600 LPH SILICON OIL FILTERATION MACHINE, 90_600 LPH SILICON OIL FILTERATION MACHINE, 100_600 LPH SILICON OIL FILTERATION MACHINE
Installation of Solar Light near Electric Transformer and Gram Kali Mandir at Purba Ruidasha Two Nos under Jalash Nizamtara GP within Phansidewa development Block under APAS fund 2025 ID APAS-01-027-143-0009 Priority No 09 Booth No 27-143wa developme
Rate contract for repairing of Damaged_ Defective Power Transformers with_without OLTC of different Type and Capacity upto 10MVA
Annual maintenance contract of HT and LT Breakers, Relays and Transformers at Chaplin Square Substation and CMO Building.
ANNUAL MAINTENANCE CONTRACT OF HT AND LT BREAKERS, RELAYS AND TRANSFORMERS AT CHAPLIN SQUARE SUBSTATION AND CMO BUILDING.
Annual maintenance contract of HT AND LT breakers, Relays, Transformers at CMO building and Chaplin Square Sub-Station.
CONSTRUCTION OF MASTIC ROAD FROM TRANSFORMERS TO LOHA BRIDGE AT (BORO KALI MANDIR) LANE IN WARD NO-14
ANNUAL MAINTENANCE CONTRACT OF HT AND LT BREAKERS, RELAYS AND TRANSFORMERS AT CHAPLIN SQUARE SUBSTATION AND CMO BUILDING.
Installation of cylinder tube well i) Nidhichak near transformer ii) Kalipada Bera house at Amalpur iii) Near Mustafa sha house at Gahira Sinking of tube well near house of i) Apurba Atta at Potapul ii) Tridev Bera at Akand
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in semi-urban and rural areas of Jhargram Division under Paschim Midnapur Region
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in semi-urban and rural areas of Midnapur Division under Paschim Midnapur Region
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in semi-urban and rural areas of Belda Division under Paschim Midnapur Region
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in semi-urban and rural areas of Ghatal Division under Paschim Midnapur Region
Implementation of High Voltage Distribution System (HVDS) by installation of new DTr and using AB cable in semi-urban and rural areas of Kharagpur Division under Paschim Midnapur Region
Construction of foundation 04 nos DTR plinth fencing and allied works for S STn 1 2 3 4 within the premises of Jharkhali Eco Tourism park under Canning Division
CONST. 1NO. 400KV TRANSFORMER BAY FOR 315MVA, 400/220/33KV AT DURGPAUR 400KV, 1NO. 220KV TRANSFORMER BAY FOR 315MVA, 400/220/33 KV TRANSFORMER AT DURGPAUR 220KV AND 220KV S/C TRANSMISSION LINE FROM DURGAPUR 400KV SUB-STN. ALLIED WORK TURN KEY
Urgent pouring of new Transformer Oil and replacement of old HT PILC cable of Sub station and preventive servicing , Cleaning , checking and Testing of existing 1no 250 KVA , 11 KV/415 V, Oil type Indoor Transformer out of 2 nos Transformer and serv
FIBRE BLOCK, POTENTIAL TRANSFORMER, CONTACTOR KIT, EARTH LEAKAGE RELAY, PT