checking of newly constructed transmission lines and transmission lines under PESL for Operation and Maintenance.
Stringing of ACSR Panther conductor and Earthwire of 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun
Prov. 11KV HT Line to 11/0.4KV 100KVA Transformer a/w HT Line and LT LIne at Village Lodhwan Khadd
Design Supply Installation Testing and Commissioning of 220 KV Double Circuit Transmission Lines 1.Transmission line from Chaibasa (PGCIL) to Jadugoda (New) (47.7 km) 2.Transmission line from Chandil (New) to Jadugoda (New) (51.3 Km)
Shifting and Increasing Height and New Erection Testing Commissioning of 11 KV HT Lines and LT Lines km no. 68.100 to 70.500 at village Nimbhare tal Rahuri Dist Ahmednagar
Preventive, Routine and Break down maintenance of 132 KV Transmission Lines under the jurisdiction of TLMD-II Pampore
Hardware Fittings for Transmission Lines (PGCIL)
Understanding of Transmission Lines Kit (Q3)
Patrolling of Transmission lines by dorone
Tender for providing cutting and lopping of tree branches underneath 11 KV HT lines LT line in E Section Gagal under ESD ,HPSEB,LTD. Nerchaowk.
Tender for providing cutting and lopping of tree branches underneath 11 KV HT lines LT line in E Section Dhanotu under SSSD ,HPSEB,LTD. Sundernagar.
Tender for providing cutting and lopping of tree branches underneath 11 KV HT Lines line LT line (E) Section Pungroo under ESD ,HPSEB,LTD. Sundernagar
Tender for providing cutting and lopping of tree branches underneath 22/11 KV HT Lines line LT line (E) Section Mahadev under ESD ,HPSEB,LTD.Sundernagar
Tender for providing cutting and lopping of tree branches underneath 11 KV HT Lines line LT line (E) Section Pungroo under ESD ,HPSEB,LTD. Sundernagar
Widening and Strengthening of Nuapada-Dharambandha Road such as shifting of HT Line,Substation and LT lines near Sakhatora, Gadtor, Sarabang, Patora and Dharambandha chowck in the district of Nuapada
Shifting and Height Raising of Electric Pole/ HT line/ LT line/ Transformer for Triveni to Kaneri road 6.20 km. Distt. Ratlam.
Supply and Erection of Transformer-100 kVA with HT line and LT line for Distribution, at Pailpada Farm, MSSCL, Dist-Akola.
Erection Shifting of HT Line Sub Station and LT Line work in various places of UIT Area Alwar Under Yearly Contract
Shifting of Electric Pole/ HT line/ LT line Along Bargad Fanta (SH-31) to Bhaisana Fanta (SH-31) road District Ratlam.
Installation of transformer and poles in solid waste disposal unit and clearing of HT line, LT line poles. in Aland Town
Shifting of 11Kv HT Line at Hanjiwera Under CDF
Tender in advance for repair and restoration of 33KV HT line 11KV HT line and LT line for upcoming monsoon season for FY 2026-27 in E Section Larankello under ESD HPSEBL Naggar
Custom Bid for Services - BMC of 66KV MUWPH Transmission lines Switchyard and 11kV AWRS Locoshed Transmission lines Lara
STRINGING AND DISMANTLING OF LT LINE AT DIFFERENT LOCATION IN MINES
STRINGING AND DISMANTLING OF LT LINE AT DIFFERENT LOCATION IN MINES
Re stringing of 132KV line conductor in Between 02 span to make proper phase sequence of 132KV Fatehpur Khaga transmission line under ETD Fatehpur
Permanent restoration of 765 kV SC LucknowBareilly Transmission Line temporarily charged on ERS on urgent basis Work involving Dismantling Destringing Foundation Erection and Stringing
Erection of 3 No ERS STructures including stringing with 0.4 ACSR ( Zebra) of 220 KV Mirbazar - Lassipora Transmission Line at Shopian and Pulwama including destringing and dismantelling after completion of work
Estimate for providing 22 KV HT line, 3Phase LT Line , to new proposed 250 KVA 22/0.4 KV Transformer alongwith HT, LT line at village Dalgaon in (E) Section Kansakoti under ESD Rohru.
Tender for providing cutting and lopping of tree branches underneath 11 KV HT lines LT line in E Section Slapper-IInd under ESD ,HPSEB,LTD. Slapper.
Tender for providing cutting and lopping of tree branches underneath 22/11 KV HT Lines line LT line (E) Section Mahadev under ESD ,HPSEB,LTD. Sundernagar
SHIFTING AND DISMENTALLING OF 33/11 KV HT LINE AND LT LINE POLE WORKS AT SCHEME NO. TPS-08 MR-12 INDORE
Shifting of DTC 11 KV HT Line LT Line coming under submergence of Garga Medium Project at Mansudhawadi Tq Dharni Dist Amravati
Improvement Stablization of HT LT line at Thilabrok and HT line at Pangbar brok and Yerkashing of Barsoo under SDP 2021-22.
Supply Erection Testing and commissioning of 11 KV HT Line 16 KVA Transformer and LT Line at Shribhuvan Tal Surgana Dist Nashik
Shifting of existing HT Line, LT line and DTC causing obstacle in construction of shade at Bajar Tal, Manchar Tal. Ambegaon Dist.Pune
SHIFTING AND DISMENTALLING OF 33/11 KV HT LINE AND LT LINE POLE WORKS AT SCHEME NO. TPS-08 MR-12 INDORE
Tender for permanent restoration of 11KV HT line and LT line in (E) Section Katrain under ESD, HPSEBL, Katrain on Turnkey Basis
SHIFTING AND DISMENTALLING OF 33/11 KV HT LINE AND LT LINE POLE WORKS AT SCHEME NO. TPS-08 MR-12 INDORE
SHIFTING AND DISMENTALLING OF 33/11 KV HT LINE AND LT LINE POLE WORKS AT SCHEME NO.169-A SUPER CORRIDOR INDORE
The work of inviting unit rate for the work of HT line / LT line under the water department under the municipal corporation.
Bird flight diverter for Transmission lines (LED Type), Bird flight diverter for Transmission lines (Non-LED Type)
Top Patrolling of EHV transmission lines using Drone and Collection of data through High Resolution Close up imaging operating at close range cameras for each tower and its elements along with Aerial inspection of EHV line Corridor
Tender for Prov. and Erection of 11 KV HT Line to proposed 11/0.4 KV 100 KVA S/Stn in village Pubowal (Thakurdwara) and Prov. and Erection of 11KV HT line to proposed 100kva DTR along with 3-Phase LT line extension and 1 phase to 3phase LT line augu
Providing 11 KV HT line, LT line, 200 KVA Transformer, 11KV HT line, LT line and LED street light in newly carved out pockets (Ashiyana Scheme) in HSVP sector-1 Pataudi. (incl. 6 years DLP for T/F and 5 year DLP for LED S/L and including switch ON/OF
Erection of 2 No. ERS Structures including its stringing with 0.2 ACSR Panther for Zainakote - Wanganpora Transmission Line at flood spill channel near Zainakote including destringing / dismantling of the same after completion of the work.
Hardware Fittings for 400KV Transmission Lines at
6 Ton Rachet Hoists for transmission lines
Hardware Fittings for 400KV Transmission Lines at
Design Testing Manufacture Supply and Stringing of High Temperature Low Sag Conductor Except Gap Conductor alongwith associated hardware fittings on New Transmission line or De Stringing Replacement of Existing ACSR Conductor on SC or DC or MC