Loading…
Loading…
4,486 results • Best match
For Maintenance work of HT/LT Line before Kanwar Yatra 2023 to Avoid any Electrical Accident in the Area of EUDSD-XI, Under EUDD-III, Meerut.
REPAIR/ REPLACEMENT AND MAINT OF LT LINE, UG CABLES, JUNCTION BOXES, LT PANEL AND CONNECTED ITEMS AT AF STN AGRA UNDER GE(AF) TECH AREA, AGRA
of HT/LT line and 03 Nos. 250 KVA substation Near Anna Market, Near ram Leela AND Near Aajmi marbel , EUDD Sitapur road,Transgomti LESA, Lucknow.
11 KV/LT Line Reinforcement work under Additional Business Plan 2023-24 (339 Crore) in the area of EDD-Mant, Mathura on Semi Turn-Key Basis
THE WORK OF ERECTION and STRENGTHENING OF 33 KV and LT LINE IN BP-2026-27 ON SEMI TRUNKEY BASIS UNDER THE JURISDICTION OF EDC-ETAH.
Work of Strengthening of 11 KV Line under Business Plan 2026-27 in the Area of EUDD-11 KV and LT Line, North-Saint Lukes, Meerut.
AMC OF ELECTRICAL EQUIPMENTS AND OPERATION and MAINTENANCE OF HT/LT LINE, GENERAL ELECTRICAL EQUIPMENTS INCLUDING SUPPLY OF CONSUMABLES AT NUPPL GHATAMPUR THERMAL POWER PLANT UP
Replacement of damaged pole, conductor with fitting and other related work for 11 KV and LT line in the area under SDO IV Kundan Road, Unnao
Fixing of Bamboo batten on LT line and binding of insulated sheet on electric pole at Kanvad Yatra route in the area of EUDD-III, Muzaffarnagar
For the Shifting work of Existing 11 kv LT line and Transformer due to widening of Gulharia Ramnagar road from Asharafpur to Aurangabad Ekala gram gorakhpur
Custom Bid for Services - 200156716 MAINTENANCE OF LT LINE & DOMESTIC POWER IN REHAB AREA OF NTPC RIHAND Similar Category Operation and Maintenance Power House/Power Plant
Strenthening of HT/LT Line of 11 KV Town No 1 Feeder emanating from 132/33/11 KV S/S Husainabad, Jaunpur Under EDD-III Jaunpur
Pole Replacement at Various Location under 33/11 KV S/S Singhawali and HT/LT Line and Pole Replacement at 33/11 KV S/S Ratol
Short tern E-Tender for Maintenance work of different type LT Line nearest festivals at S/S Engg. College , Under the area of EDD-Rahim Nagar
Short tern E-Tender for Maintenance of LT Line of 11 KV Kathwara Feeder on 33/11 KV S/S , Under the area of EDD-B.K.T
for Maintenance and Repairing of LT line in the area of 33/11 KV Substation GSI and Faizullaganj, Lucknow under E.E. EUDD Sitapur road, LESA, Lucknow
Construction/ Mentinance of 11 KV/LT line and Other Associate Work underFull Deposit Scheem at various place at EDSD I/II Hathras under EDD-I, Hathras.
Construction/ Mentinance of 11 KV/LT line and Other Associate Work underFull Deposit Scheem at various place at EDSD I/II Hathras under EDD-II, Hathras.
Patrolling and Maintenance of 220KV Different Transmission lines Under ETD-Ballia
Patrolling and Maintenance of 132KV Different Transmission lines Under ETD-Ghazipur
Ground Patrolling Of Various 132 KV Transmission Lines Under ETD Raebareli
Patrolling and Maintenance of 132KV Different Transmission lines Under ETD-Mau
Patrolling AND Maintenance of 220KV Different Transmission lines Under ETD-Ghazipur
Work under maintenance and repair, system improvement and deposit scheme of O.H. U.G. line and breakdown work LT Lines, Pole replacement, Construction Strengthening, re-arrangements Under Jajmai and Harrisganj Divison under EUDC-III KESCo Kanpur
CONSTRUCTION OF 220 KV GANTRY (GTM) AND STRINGING OF ACSR ZEBRA CONDUCTOR ON D.C TOWER OF S/C 220 KV RAJA TALAB- AURAI (400 KV) LINE
WORK OF STRINGING 33KV AUXILIARY BUS , MAKING HOLE IN AUXILIARY STRUCTURE AND OTHER ASSOCIATED WORK AT 132 KV S/s F.C.I.-II UNDER ETD-I , GORAKHPUR
Proposed work for attending the breakdown of overhead lines (33KV, 11KV and LT lines) and fixing of cable jointing kit in the area of EE, EUDD III, Mathura in the jurisdiction of the SE, EUDC, MATHURA
The work of cutting and pruning the branches of trees touching the 33 KV, 11 KV and LT lines emanating from various 33/11 KV sub-stations and securing them using crane/hydra and man power.
The work of cutting and pruning the branches of trees touching the 33 KV, 11 KV and LT lines emanating from various 33/11 KV sub-stations and securing them using crane/hydra and man power.
Work of replacement of broken/crooked poles/lines from time to time in 11 KV/LT lines emanating from 33/11 KV sub-stations under Electricity Distribution Sub-Division-II, Muradnagar under Electricity Distribution Division-Muradnagar.
For the Work of Strengthening and Maintenance of HT/LT Lines Including Re-Sagging of Loose Span, Straightening of Tilted Supports and Misc. Works in the Area 33/11 Sub-Station Mohkampur Under EUDD-V, Meerut.
RUNNING CONTRACT OF REPAIRING AND STRENGTHENING OF 33 KV, 11 KV AND LT LINES POLE DAMAGED DUE TO HEAVY STORM (Daiviya Aapda) IN THE AREA OF EDSD-I, DAURALA OF EDD-II, MEERUT AT DIFFERENT SITES
Regarding Runing Contract Of Repairing And Strengthening Of 33 Kv, 11 Kv And Lt Lines Pole Damaged Due To Heavy Storm (Daiviya Aapda) In The Area Of Edd-IInd Dhampur In The Financial Year 2023-24
Proposed work for attending the breakdown of overhead lines (33KV, 11KV and LT lines) and fixing of cable jointing kit in the area of EE, EUDD II, Mathura in the jurisdiction of the SE, EUDC, Mathura
For the work of making and strengthening of 33 KV, 11 KV nd LT Lines, VCBs Installation/Repair nd other assocaites works in Buisness Plan 2024-25 on Semi Turn Key Basis under EDC-1 Agra
For the Work Reconstruction of 33 KV, 11 KV and LT Lines Damage Due to Andhi Tufaan (Daiviy Apda) in the Area of 33/11 KV Sub-Station, Ganga Nagar-1, Meerut Under EUDD-IV, Meerut.
Work for Attending the breakdown of overhead lines 33KV, 11KV, LT lines and fixing of cable jointing kit in the area of SDO II, Jaigurudev (EUDD I, Mathura) under the jurisdiction of the SE, EUDC, MATHURA
For the Work Reconstruction of 33 KV, 11 KV and LT Lines Damage Due to Andhi Tufaan (Daiviy Apda) in the Area of 33/11 KV Sub-Station, Ganga Nagar-1, Meerut Under EUDD-IV, Meerut.
For Replacement of Old And Jar Jar Conductor of Existing LT Lines Connected with 11 0.4 KV at Side Swar Town And Maswasi Town Under Theft Prevention Scheme. Under Jurisdiction of Electricity Distribution Division II Rampur
CONSTRUCTION OF A-TYPE KENDRIYA VIDYALAYA AT BHADOHI, UP (SH : CONSTRUCTION OF INTERNAL BOUNDARY WALL FOR RESIDENTIAL BLOCK AREA AND HT LINE AREA AT KV BHADOHI CAMPUS) Subwork/Packages: CONSTRUCTION WORK
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Additional 11 KV DTR Installation, extension of LT Lines and LT Line Augmentation works under Business Plan 2026-27 agains..
Transmision line Lightening Arrestor for TLM Vindhyachal WR-II, Supervision of Installation for TLM Vindhyachal WR-II, Transmision line Lightening Arrestor for TLM Prayagraj NR- III, Transmision line Lightening Arrestor for TLM Shaktinagar NR-III, Supervision of Installation for for TLM Prayagraj NR-III
power connection work at basantpur water supply scheme district Gorakhpur
Power connection work at Boopgarh WSS Gorakhpur
Power transmission work at Bewari WSS Scheme District Gorakhpur
Power connection work at Bharroh water supply scheme district gorakhpur
Power connection work at delapar water supply scheme district Gorakhpur
Custom Bid for Services - Maintenance OF Damaged 33/11KV/LT lines due to Heavy Storm/DaiviyaAapda at various places in the area under EDD, Kiraoli, Agra Similar Category Repair and Overhauling Service Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Tender for Constrction/Shifting of 11KV/HT Line for given New connection defferent places in Diposit Yojana against EDD -II, Hardoi under jurisdiction of EE, ED D-II,Hardoi.
Connection of PTW with Rural Feeder, Gaurd and laying of UG cable from HT line in the area of Sub-Division Jevar under the Jurisdiction of EDD-IV, Noida