Loading…
Loading…
4,486 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider
Construction of 33 KV New HT line under ground double Circuit in Yadav Chauraha to 220 KV Sub-Station Malikpur Under Electricity Distribution Division Ist, Ayodhya
tila more par swchalit nalkupo par hans gardern va nistoli bijlighar se aane wali 11KVA v HT line ke fault marammat (12 Hours) sanchalan ka karya
CONSTRUCTION OF LT S/S HT LINE AND RELATED WORK UNDER DEPOSIT SCHEME IN AREA OF EDSD-III AND EDS-IV LONI UNDER EDD-II LONI
Shifting of 11 KV HT Line and poles from boundary wall of Devangana Hawai Patti (Air port), Chitrakoot to outside of boundary wall under EDD, CHITRAKOOT
Proposed work for Laying of Earth Wire in LT Line for installation of meter at various villages in jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
Proposed work for Laying of Earth Wire in LT Line for installation of meter at various villages in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Proposed work for Maintenance and Replacement of Damaged 11KV/LT Line at various place Under EDSD-Aurangabad, in the jurisdiction of E.D.D.-Ist, Mathura
Shifting of HT/LT line at Rudauli to Kutubjamapur marg near Vill. Kutubjamapur, Teekar and Chitaipur Rudauli Ayodhya Under Electricity Distribution Division-Rudauli, Ayodhya
Work No. 16 related to the item of strengthening of LT line in the area of EUDC-II, Noida under Business Plan 2025-26.
Resagging Strenthening of of losse HT LT line conductor Repairing and grouting of Damaged. rusted ST Pole of Diffrent Place Under EDD I Ayodhya
Running Contract of repairing and Maintenance of 33 KV 11 KV and LT line or damage Jointing kit for EDSD Nagal under EDD Deoband
Replacement of bare conducter by New AB Cable of LT Line of 400 KVA T/F No-19 in Yamunapuram colony, EDD-II, Bulandshahr
Replacement of bare conducter by New AB Cable of LT Line of 400 KVA T/F No-24 in Yamunapuram colony, EDD-II, Bulandshahr
Shifting of HT/LT Line from Pratappur to Ugrasenpur Railway Fatak in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Vidhyut Vitran Khand Muradnagar ke Antergat 11 KV LT Line Avm Naye Parivartak Sthapit Karna Meetring Kyuvikal Sthapit Karna Aadi Karye Karye Jate HAi
Strengthening of 11kV, LT lines, construction of 11kV line and bifurcation work and capacity enhancement work of 11/0.4kV distribution transformers under Business Plan 25-26 scheme in the working area of EUDD BSR
Construction Errection of HT LT Lines LT Sub Stations alongwith Other Associated Electrical Works as when required Consumers request in DEPOSIT SCHEME in the work area of ENGINEERING COLLEGE and VIKAS NAGAR SUB DIVISION
Construction/Errection of HT/LT Lines, LT Sub Stations alongwith Other Associated Electrical Works, as when required Consumer request in DEPOSIT SCHEME in the work area of ENGINEERING COLLEGE AND VIKAS NAGAR, SUB DIVISION
Construction/Errection of HT/LT Lines, LT Sub Stations alongwith Other Associated Electrical Works, as when required Consumers request in DEPOSIT SCHEME in the work area of ENGINEERING COLLEGE and VIKAS NAGAR, SUB DIVISION
Looping Chopping of tree branches coming under the 33 11 KV and LT lines in the work area of Sub Division Ahibaranpur Under the jurisdiction of Executive Engineer EUDD Daliganj LESA Trans Gomti Lucknow
SCHEDULE OF RATES QUANTUM OF WORKS INVOLVED THE CUTTING OF TREE BRANCHES WHICH ARE TUCHING HT LT LINES IN THE AREA OF SUB STATION DEEH SUCHI UNDER MR IN JURISDICTION OF EDD SALON RAEBARELI
Construction/Errection of HT/LT Lines, LT Sub Stations alongwith Other Associated Electrical Works, as when required Consumers request in DEPOSIT SCHEME in the work area of 33/11 Sub Station, New University Campus
Work of Replacement of Jarjar conductor, poles and associated work required due to Storm/Devi Aapda of 33 kv/11 KV/LT lines in the area of EDSD IInd (Aliganj) under EDD Ist Etah.
Work of Replacement of Jarjar conductor, poles and associated work required due to Storm/Devi Aapda of 33 kv/11 KV/LT lines in the area of EDSD IIIrd (Jalesar) under EDD IInd Etah.
Work of Replacement of Jarjar conductor, poles and associated work required due to Storm/Devi Aapda of 33 kv/11 KV/LT lines in the area of EDSD IVth (Etah) under EDD Ist Etah.
Work of Replacement of Jarjar conductor, poles and associated work required due to Storm/Devi Aapda of 33 kv/11 KV/LT lines in the area of EDSD Ist (Etah) under EDD IInd Etah.
REGARDING RUNNING CONTRACT OF REPAIRING, REPLACEMENT OF RUSTED AND DAMEGED POLS, WIRE RESAGGING, POLE IN LONG SPAN OF 11 KV AND LT LINES IN THE AREA OF EDSD-I, Maliyana UNDER EDD-III, MEERUT
The work for Maintenance of various 11 KV/LT Lines, Old Stey, Straightening of Poles, Chopping of Tree Branches to clearence of Line Route at various place in the jurisdiction of E.D.D.-Mant, Mathura
Replacement of bend leg of 132KV Sitapur Neri line at Location no. 125 with de stringing, restringing of ACSR Panther conductor under ETD Sitapur
Refer to Tender Description.
As per Tender Document
Tower Foundation work of height raising of 220 KV CG City PGCIL, Raibarely and Sarojininagar Bacharawan CKT DC transmission line between loc no.190 to 191 using multicircuit towers under ETD II, Lucknow
Supply and work of height raising of 220 KV Kursi Road Hardoi Road - BKT - PGCIL DC transmission line between tower Loc. No.57 B 0 to 61 B 0 under ETD II Lucknow
Construction of LT S/S HT Line and Related Work Under Deposit Scheme in the area of EDSD-I/II Loni Under the jurisdiction EDD-I, Loni.
Shifting of HT line of 63 KVA T/F located Pilakhni Railway Station at 33/11 KV S/S Pilakhni in the area of EDD I SRE
CONSTRUCTION OF LT/HT LINE FOR ENERGIZED CONNECTION UNDER SUGAM YOJNA SCHEME IN THE AREA OF EDSD-I, PAVI LONI UNDER THE JURISDICTION OF EDD-I LONI
CONSTRUCTION OF LT S/S HT LINE AND RELATED WORK UNDER DEPOSIT SCHEME IN THE AREA OF EDSD-I/II LONI UNDER THE JURISDICTION EDD-I LONI
For Construction of HT LT line and substation Shifting of line and pole in the area of EUDD University against Deposit head FY 2025 26
The work for Construction/Shifting of HT/LT Line and Double Pole and other work under Deposit Scheme in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Shifting of 33 KV, 11 KV and LT Line in R.O.W. of Gorakhpur Link Expressway on Turnkey Basis Under Electricity Distribution Division-VI, Azamgarh (UP)
Replacement of damaged ST Pole 11 Mtr. long/ 9 Mtr. long and PCC Pole 8.5 Mtr. long installed at 11 KV Line and LT line
Work for Replacement of old and jarjar HT and LT Line conductor on main Spare Feeder and Dada Nagar East Feeder under Dada Nagar Division
Shifiting of HT/LT line at railway crossing 33B for the construction of over bridge underhead deposit scheme in the juridiction of EDD-Ist Sultanpur
Interpoling of 33 kv East feeder and Utraula feeder in itiyathok block, Repairing of HT/LT line and other related works under EDD 1 Gonda
Replacement of bare conducter by New AB Cable of LT Line of 250 KVA T/F No-59 in Akbar Town, Uner EDD-II, Bulandshahr
Replacement of bare conducter by New AB Cable of LT Line of 250 KVA T/F No-05 in Akbar Town, Uner EDD-II, Bulandshahr
Replacement of bare conducter by New AB Cable of LT Line of 250 KVA T/F No-67 in Akbar Town, Uner EDD-II, Bulandshahr
Replacement of bare conducter by New AB Cable of LT Line of 250 KVA T/F No-64 in Yamunapuram colony, Uner EDD-II, Bulandshahr