Loading…
Loading…
2,647 results • Best match
Carriage of spillaged coal from the gallery and bottom tail drum side of 406 and 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than
Carriage of accumulated slurry coal from the surrounding area of PS-14 and pump house by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Raj
Carriage of spillaged coal from the surrounding area of raw coal site office by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place Pont No. 5 for a lead less than 0.5 KM at Rajrappa Washe
Carriage of already accumulated clean coal of WCP from top of roof shed of 1204 , 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of spillaged coal from the different equipments like chain belt conveyors and bucket elevators from the floor of 43M, 35M and 31M of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to n
Carriage of already accumulated clean and washed coal power from the top of roof shed of 1204 and 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute/ suitable place for a lead
Carriage of spillaged coal from in between shed and surrounding area of PS-8 and its approach area by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than
Carriage of spillaged / overflowed coal from the drain west side and north side of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0
Carriage of spillaged coal from in between shed of PS-9 and its approach by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washer
Carriage of spillaged coal from the gallery and bottom and tail drum side of 406 and 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less
Carriage of spillaged coal from in between shed and surrounding area of PS-8 and its approach area by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than
Carriage of spillaged coal from the bottom area of 1204 and 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washer
Carriage of spillaged coal / boulder from the bottom area of 301A and 401A belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajra
Carriage of spillaged coal / boulder from the area in between tail side of 301A and 301B and area between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / ch
Carriage of spillaged / overflowed coal from the drain west side and north side of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at
Carriage of spillaged coal from the floor of PS-11 bottom and gallery of 1101 and 1103 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of spillaged/ boulder from the area in between tail side of 301A and 301B and area between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute /
Carriage of spillaged/overflowed coal from the bucket / chain belt conveyors from the floor of 6 Mtrs, 10 Mtrs. and 10 Mtrs. Of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute /
Carriage of spillaged coal from the gallery of 1201 belt head drum and tail drum area by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa
Work of Dismantling Dragging and Transportation of 150 MVA, 220 132 KV Auto Transformer from Old PTPS Switchyard to 220132 KV Grid Sub Station Hatia II
Hiring Of 5 Nos. Explosive vans of 9 Te. capacity for safe transportation of Explosives and Accessories from burragarh magazine to different mines under Kusunda Area.
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Feeding, crushing, loading & transportation of Coal for 90 days as per Scope of Work
INVITATION TO TENDER AND INSTRUCTION TO TENDERERS FOR APPOINTMENT OF GUNNY TRANSPORT CONTRACTOR AT CHATRA
Goods Transportation service - Monthly Based Service - Outside city within state; Household/Office, Food Grains, Vegetables, Machinery & Equipment, Food Items; Pickup Truck, Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km X 720 hours; Outstation 24*7
Widening and strengthening of coal transportation road(CTR) from haul road to HMB road at PEOCP Hazaribagh Area ( length- 850 mt)
Making of lighting arrangement from overbridge towards Dindayal chowk for safe coal transportation during back shift hour under CCD, Dhori Area
Empanelment of Transportation agencies with rate contract for Evacuation of ash from ash ponds of Bokaro Thermal power station of DVC
Dismantling, transportation, unloading and assembling assistance of 01 No BG 825 Motor Grader from Pandaveswar Area to Barmuri OCP, Mugma Area.
Empanelment of Transportation agencies with rate contract for Evacuation of ash from ash ponds of Chandrapura Thermal Power Stations of DVC
Extension of 220 Volt Over Head Line from CISF Check Post along Coal Transportation Route at Bastacolla OCP Under Bastacolla Colliery.
DISMANTLING OF 10 INCH AND 6 INCH IDLE DELIVERY OF WEST SUMP INCLUDING MANUAL TRANSPORTATION AND SACKING AKWMC UNDER KATRAS AREA
Construction of PQC Road for coal transportation from Nearby Basanti Mata Chowk to New Madhuband Washery Gate under Block II Area
Contract for annual maintenance of coal transportation road from Chilika Bridge to Montico Nallah under Govindpur U/G project, Kathara area.
Shifting of LT OH Line at Damodar river bridge near Ashok workshop for transportation road for proper illumination under Ashok OCP.
Transportation and laying fitting of 30lb track line from D18 BG / 10 dip to 19 face . Moonidih Colliery, W J Area
Cutting earthen drain along both side of coal transportation road at Hurra c Project and Hiring one J.C.B for different work.
Construction of approach road with boulder morrum as base course from Saglayi tola Dumariya to coal transportation road under Rajmahal Area.
Transportation from surface to D19 BG 9th dip NG Sleeper, 60lb track line XVI top seam. Moonidih Colliery, W J Area
Empanelment of Transportation agencies with rate contract for Evacuation of ash from ash ponds of Chandrapura Thermal Power Stations of DVC
Dismantling, loading, unloading, transportation and installation of 1000kVA, 11kv/3.3KV power transformer from Alkusa colliery to Dhansar pit substation under ADIC
Evacuation of Ash from BPSCL ash ponds and nuisance free transportation along with disposal of the same to NHAI road projects.
Custom Bid for Services - Collection transportation and disposal of Bio Medical waste of DVC HospitalBTPS for the period of 730 days
Repairing of drill rod of roof bolting mc, 2. Repair of 4 non return valve and sluice valve, 3. Repair of 4 and 6 G.I. bend, 4. Fabrication of coupling of AKG haulage and motor, 5. Providing main of MMV PV 200, 6. Repairing of damaged hose in 78
One Nos. of endless haulage seating at 17 EL MD to 22 No EL Tugger Dip. Location 17 EL to 22 No. Tugger dip EL. Rail Carrying, Laying, Fitting and Packing for development work at virgin property in top sec. of 31 no. Incline BP Seam at Badjna Collier
For dismantling ,removing and stacking and transportation of 8 inch dia MS Pipe from IV seam to TOCP workshop(approx length 600 mtr Vertically and Horizantal) TOCP
Carriage of accumulated slurry coal from the east side and north side of PS-14 Pump House by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajra
Carriage of spillaged coal from the picking belt 308A and 308B and its floor area by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place Pont No. 5 for a lead less than 0.5 KM at Rajrappa W
Hiring of 01 (one) no. Diesel Explosive Van having valid license for carriage of explosive with minimum carrying capacity 06 (Six) Tonne for day to day activities of mines for 24 Hrs. duty with drivers for a period of 03(Three) Years at Kathara Area
Carriage of overflowed slurry coal from the floor of 2 Mtr and its approach drain of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM
Dismantling and carriage of HDP pipe PE-80, 110 mm diameter PN-8 laid from Churi UG mine to surface and transporting of pipe to Purnadih Project and subsequently laying and fixing of pipe in Coal stocks no. 03 and 08 under Purnadih OCP