Loading…
Loading…
2,276 results • Best match
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
WARDROBE COMPLETE FOR GUARD'S ROOM, as per Drawing: LP64154 ALT 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD
SET OF LUGGAGE RACK FOR MEMU3PH COACHES, as per Drawing: MPLLRMEMU3PH VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
WARDROBE COMPLETE FOR GUARD'S ROOM, as per Drawing: LP64154 ALT 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD
WARDROBE COMPLETE FOR GUARD'S ROOM, as per Drawing: LP64154 ALT 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD
Transportation work in Mansa
Hiring of Mahindra Bolero B6 OPT BSVI 2 Color Diamond White (AC) on Monthly basis for the use of Officers/Officials of the District Employment Generation, Skill Development and Training Office, Ferozepur and also for transportation of official goods.
TPT FOOD GRAINS FOR THE YEAR 23-24
EXPRESSION OF INTEREST FROM INDANE DISTRIBUTORSHIPS ATTACHED TO NABHA LPG BOTTLING PLANT FOR OWN LOAD TRANSPORTATION IN VERTICAL POSITION ON UNIT RATE BASIS EX NABHA LPG BOTTLING PLANT UNDER PUNJAB STATE OFFICE
Construction of 2 No. 220 KV reactor bay and Design, Engineering, Manufacture, Supply, Transportation, Erection, Testing and Commissioning of 2 Nos. 25 MVAR 220KV Reactor at 400 KV Substation Dhuri and Nakodar.
SET OF FRAME FOR LHB POWER CAR COACHES., as per Drawing: MP23PFRAMEPO VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
BRACKET, as per Drawing: LE63168 ALT a, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STREN
FIXING CLIP 72MM DIA, as per Drawing: LP63137, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUAT
BRACKET, as per Drawing: LE44415, Packing Instruction: PI042 VERSION 1.0: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A
LATERAL RUBBER STOP, as per Drawing: 61705004 ALT.'nil', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WI
SET OF FRAME FOR LHB POWER CAR COACHES., as per Drawing: MP23PFRAMEPO VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
SLIDING SCREW M10X30, as per Drawing: MI004525 ALT a, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH
BRACKET FOR SWITCH MOUNTING, as per Drawing: LW44346 ALT b, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
SET OF FRAME FOR LHB POWER CAR COACHES., as per Drawing: MP23PFRAMEPO VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
BRACKET FOR SWITCH MOUNTING, as per Drawing: LW44346 ALT b, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
BRACKET FOR SWITCH MOUNTING, as per Drawing: LW44346 ALT b, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
FDS BOX COMPLETE FOR LHB AMRIT BHARAT COACHES, as per Drawing: 75564019 ALT NIL, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
SLIDING SCREW M10X30, as per Drawing: MI004525 ALT a, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH
Custom Bid for Services - OPERATION OF IN-HOUSE STATUTORY TESTING & PAINTING FACILITY AT LPG BOTTLING PLANT, BATHINDA Similar Category Haulage & Housekeeping Services for IOCL
Work of Transportation of the sand as taken through the weigh bridge against the supply order from Government approved desilting sites to the delivery site as per the order on the portal at the pre approved rates (through tendering process)
Supply, Transportation and Application of RTV Silicone Rubber High Voltage Insulation Coating on 11KV Indoor Bus Bar and its Spouts/ Support Insulators for 11KV Switchgear and Cleaning/ Removal of Waste from the Equipment
SET OF DOOR CUT OUT COMPLETE FOR VANDE BHARAT MC, TC, NDTCEC TYPE COACHES, as per Drawing: MP25VBDCO VERSION 0, Packing Instruction: (1) THE TRANSPORTATION ARRANGEMENT SHOULD BE AS PER DRAWING NO ICF/
BLIND RIVET A3.2X12 AL-ST-A1P, as per Drawing: DIN7337, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WIT
GRILL FOR LHB AC 3TIER ECONOMY COACHES, as per Drawing: ED44248 ALT nil, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHO
FLOOR END PROFILE,L=2000MM, as per Drawing: LW41112, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A
FLOOR END PROFILE,L=2000MM, as per Drawing: LW41112, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A
FLOOR END PROFILE FOR LHB COACHES, L=2M., as per Drawing: LS41128, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE
GRILL FOR LHB AC 3TIER ECONOMY COACHES, as per Drawing: ED44248 ALT nil, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHO
FLOOR END PROFILE FOR LHB COACHES, L=2M., as per Drawing: LS41128, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE
GRILL FOR LHB AC 3TIER ECONOMY COACHES, as per Drawing: ED44248 ALT nil, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHO
FLOOR AND PROFILE L=2000MM, as per Drawing: LG41173, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A
SPRING WASHER B20, COATING AS PER MDTS 057, as per Drawing: IS:3063-1994 GRADE 60C6, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.
SET OF HARDWARES FOR 3-PHASE MEMU DMC COACHES, as per Drawing: MPL3PHWE VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. TH
CABLE JACKET SYSTEM, as per Drawing: EDTS138,ITEM-5.COR-2., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
SPLIT PIN 3.2X40, as per Drawing: IS:549-2005, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUAT
GRILL FOR LHB AC 3TIER ECONOMY COACHES, as per Drawing: ED44248 ALT nil, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHO
FIXING CLIP, as per Drawing: DIN3016,B1-70X25 W4, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQ
FLOOR END PROFILE, L=2M, as per Drawing: LJ41154, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQ
FLOOR END PROFILE,L=2000MM, as per Drawing: LW41112, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A
MIRROR HOLDER RH, as per Drawing: LW62126 ALT b, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQU
FLOOR END PROFILE,L=2000MM, as per Drawing: LW41112, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A