Loading…
Loading…
4,989 results • Best match
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Set of Inlet and discharge valve assembly for Model RR20100 CG(M) on board & under slung CP of M/s ELGI. Set consists of 02 items as per attached Annexure.
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
8324 REPAIRS, MAINTENANCE TO SUBMERSIBLE PUMPS, BORE WELLS, PRESURE FILTERS, CLEANING TO FRESH WATER SUMPS, UNDERGROUND TANKS, VALVE CHAMBERS AND CONNECTED PIPE LINE WORKS UNDER AGE (I) RnD NSTL, VISAKHAPATNAM
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
OVERHAULING KIT FOR OPERATING VALVE OF WIPER ASSEMBLY AS PER M/S. KNORR BREMSE'S PART NO. I93279/KI. One kit consisting of 18 items (31 nos.) as per attached Annexure.
IOH Replacement kit required for EP valve assembly of single bottle VCB type VCBA as per M/s. AAL part no. 4300007100/35. Kit details are as per attached enclosure.
OVERHAULING KIT FOR OPERATING VALVE OF WIPER ASSEMBLY AS PER M/S. KNORR BREMSE'S PART NO. I93279/KI. One kit consisting of 18 items (31 nos.) as per attached Annexure.
OVERHAULING KIT FOR OPERATING VALVE OF WIPER ASSEMBLY AS PER M/S. KNORR BREMSE'S PART NO. I93279/KI. One kit consisting of 18 items (31 nos.) as per attached Annexure.
Supply and Delivery of Bleaching Powder for the Maintenance of Water Supply to Put Clean and hygienic condition, ELSR's Valve Pits, Filtration Plant, Clariflocculator etc complete in Kurnool Municipal Corporation.
MAJOR RE-FIT FOR VARUNA CAISSON GATE INCLUDING REPAIR/RENEWAL OF VALVE, PIPING SYSTEM, OPERATING SYSTEM, STAGING, SURFACE PREPARATION AND PAINTING AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
Manufacture Supply and Delivery of 12.7 Chromium Plated Single Valve lever operated steel tap including transportation to any where in the package area(Guntur, Prakasam and Nellore erst while districts
Formation of Gravel Road to New Clear Water Pump Room (100HP) and providing Quarry Dust Filling around Clear Water Sump and Valve Pit in 10MLD Plant Dowleswaram in 18th division.
Supply and Delivery of Bleaching Powder for the Maintenance of Water Supply to Put Clean and hygienic condition, ELSR's Valve Pits, Filtration Plant, Clariflocculator etc complete in Kurnool Municipal Corporation.
Nidadavole Municipality - Municipal General funds -Providing RCC Piped culvert at ZP Girls high school in 7th ward and shifting of existing scour valve at Maruthi cycle shop in 9th ward.
Construction of Valve pits at various places in Gautham buddha road and CC Patch works under sachivalayam no.10 to 20 in Mangalagiri urban of MTMC Under Municipal General Fund.
Supply & Delivery of DI Pipe fittings & Valve for Laying 300MM Dia DI K9 Pumping main from Island Center to ELSR @ PWD Colony in Piduguralla Municipality under General Funds/Special Grant.
SALARIES 2018-19; S.NO. 1 OF 58. ENGAGING OF MAN MAZDOORS FOR ARRESTING OF LEAKS, VALVE OPERATORS AND BORE WELL REPAIRS FROM 37 TO 44 DIVISION IN AE-1 SECTION
ERV VALVE ASSEMBLY (APM) SUITABLE TO THE "ESCORTS MAKE BMBS" PART NO. 3EB7346 CONFORMING TO RDSO SPEC. NO. WD-23-BMBS-2008 (REV-1), AMENDMENT NO.1 OF SEPT. 2016
Electro valve assembly complete for E.P. contactor, as per CLW Drawing No. 4TWD.111.118 Alt-14 (Sheet No.0) or latest and CLW Spec.No. 4TES.111.018. Alt-3 or latest.
N1 REDUCING VALVE 1/2 inch BSPT THD AS PER WABTEC PART NO-523002700. MAKE- FAIVELEY. Firm's offer:- N-1 REDUCING VLV 1/2BSPT THD to FTRTIPL Part no. 523002700
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Set of spares for C2 Relay valve , RDSO Specification No. MP.0.01.00.15 REV- 03 April - 2024 , RDSO Drawing: SKDP-4160. Each set consisting of 11 items as per attached annexure.
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Replacement of damaged M.S Pipes of various sizes at various locations of Hydrant, raw water, clarified, LP & HP water lines and air lines of Unit-I and II, replacement of G.I pipes of various sizes of drinking water lines from D.M.plant to Service ... landing valves , ... deluge valves at ...
Replacement of damaged M.S Pipes of various sizes at various locations of Hydrant, raw water, clarified, LP & HP water lines and air lines of Unit-I and II, replacement of G.I pipes of various sizes of drinking water lines from D.M.plant to Service ... landing valves , ... deluge valves at ...
Replacement of damaged M.S Pipes of various sizes at various locations of Hydrant, raw water, clarified, LP & HP water lines and air lines of Unit-I and II, replacement of G.I pipes of various sizes of drinking water lines from D.M.plant to Service ... landing valves , ... deluge valves at ...
STEM, FLUID VALVE
REPAIR KIT XL-500, BALL VALVE SET XL-500, Impeller, S815519010, LRVP, Shaft, S821164001, LRVP, Shaft sleeve, S823248010, LRVP, O-Ring 123.42 x 3.53, 1515012306, LRVP, Drive-End Port Plate, S834628026, LRVP, O-ring 600 x 3.00, 1515060005, LRVP, Non ... LRVP, Valve Plate, ...
SUPPLY OF KNIFE GATE VALVES REQUIRED FOR AHP/STAGE-II-
UPVC PIPES 15 MM DIA LENGTH 3M, UPVC PIPES 20 MM DIA LENGTH 3M, UPVC PIPES 25 MM DIA LENGTH 3M, 15MM DIA UPVC ELBOWS, 20MM DIA UPVC ELBOWS, 25MM DIA UPVC ELBOWS, 15MM DIA UPVC SOCKETS, 20MM DIA UPVC SOCKETS, 25MM DIA UPVC SOCKETS, 15MM DIA UPVC 45 ... UPVC BALL VALVE , ... UPVC BALL VALVE , ... UPVC BALL VALVE , ...
SPL REPAIRS TO WATCH TOWERS (BLDG NO.P-211C, P-211D, P-211E , P-211F) AND PUMP HOUSE P-210A AT NAD BHEEMUNIPATNAM AND SPECIAL REPIARS TO FIRE FIGHTING SYSTEM, STAND POST, HYDRANT VALVES, HOSE BOXES AND ITS CONNECTED ITEMS AT NAVAL STATION BHEEMUNIPAT
Transformer oil sampling bottle made of stainless steel Gr.304 for testing /Analysis as per IS: 9434/1992 & IS: 10593 having gas tight needle valves and hose nipples at both ends. Capacity : 1000 ml. Required to collect transformer oil samples for DGA testing.
OP DRIVE WHEL LIMIT SW Z047 359 AUMA MOV, DRIVE WHEEL LIMIT SW Z047 363 AUMA MOV, SWITCH PUSH BUTTON Z032 068 AUMA MOV, SEAL KIT ASSY SMAL NBR Z102 809 AUMA MOV, SEAL KIT ASSY LARG NBR Z102 810 AUMA MOV, DISPLAY BOARD AC01 2 100 09148 AUMA MOV, INTERFACE POWER SUP Z126 860 by 01 AUMA MOV, INTERFACE IO BOARD Z043 606 by 01 AUMA MOV, INTERFACE IO BOARD Z107 302 by 01 AUMA MOV, ASSY INTERFACE LOGIC Z124 628 AUMA MOV, INTERFACE G by U by F Z043 590 by 06 AUMA MOV, REVERS CONT ASSY A2 Z101 010 AUMA MOV, FUSE KIT ASS AC01 2 1A Z100 922 AUMA MOV, SEAL KIT ASY ACEXC01 1 Z035 196 AUMA MOV, OP DRIVE WHEEL LIMT SW Z047 351 AUMA MOV, SEAL KIT ASSY SA16 2 Z102 811 AUMA MOV, SEAL KIT ASSY SA16 2 Z102 812 AUMA MOV, INTERFACE C AC01 2 Z043 584 by 01 AUMA MOV, TERMINAL CONNECT ASSY Z109 625 AUMA MOV, SWITCH STACK EMS OPEN Z032 005 AUMA MOV, SWITCH STACK EMS CLOSE Z032 006 AUMA MOV, O by P DRIVE WHEEL LIM SW Z001 655 AUMA MOV, DRIVE WHEEL LIMIT SWIT Z046 605 AUMA MOV, POSIT INDICATOR MECH Z002 431 AUMA MOV, SEAL KIT ASSY SMAL NBR Z102 807 AUMA MOV, SEAL KIT ASSY LARG NBR Z102 808 AUMA MOV, REVERS CONT ASSY Z101 007 AUMA MOV
CYL GAS HELIUM 47LTR 110-150 KG SQCM, cyl hydro test charges, Cylinder oil and paint, valve safety guard replacement, cyl neck ring replacement, spindle of cyl valve replacement, cyl valve gland nut replacement, cyl valve brass replacement, cyl valve SS replacement
8366 MAINTENANCE / REPAIRS TO SUBMERSIBLE PUMPS, BORE WELLS, PRESSURE FILTERS, CLEANING TO FRESH WATER SUMPS, UNDER GROUND TANKS, VALVE CHAMBERS AND CONNECTED PIPE LINE WORKS UNDER AGE (I) RnD NSTL, VISAKHAPATNAM.
Providing and installing Ultrasonic clamp-on fixed type digital flow meter with required cable including costruction of valve chamber and MS door frame at 7 locations on YLM Canal. (2nd call)
WATER FILTRATION PLANT 1. 15000 LPH CAPACITY 2. 21/62(21 INCH DIA 62 INCH HT) FRP VESSEL WITH MULTIPORT VALVE 3. MEDIA USED IN FRP VASSEL BOQ Title BOQ BOQ
PRESSURE LIMITING VALVE (N1) WITH BASE FOR PIPE MOUNT TO FTIL PART No.523001000 OR SIL PART No.552238 AND RDSO DRG.No.SK.DP-3582 AND RDSO SPEC.No.MP.0.01.00.15 REV.00, MARCH 2004.
Manufacture & Supply, delivery of valve rods,check nuts and CID joints, rubber rings,bolts & nuts, materials etc, for distribution lines in the town at Guntakal Municipality under General Funds 2022-23
Cleaning of valve plates, cylinder water jackets, suction air filters and Inter & after coolers of Instrument/station air compressors of Stage-I, as and when required during the year 2022-23.
Manufacture & Supply, delivery of valve rods,check nuts and CID joints, rubber rings,bolts & nuts, materials etc, for distribution lines in the town at Guntakal Municipality under General Funds 2022-23
Providing Pump Operators/Valve Operators, Gardener, Lab Technician, Lab Assistant, Fitter Coolie and Watch man in various Divisions Under Rural Constituency from October 2025 to March 2026 in Nellore Municipal Corporation
Formation of Gravel Road to New Clear Water Pump Room (100HP) and providing Quarry Dust Filling around clear water sump and valve pit in 10MLD Dowleswaram in 18th division of RMC.
Manufacture & Supply, delivery of valve rods,check nuts and all engineering and electrical works for clear water pump house at head water works at Guntakal Municipality under General Funds 2022-23