Loading…
Loading…
15,769 results • Best match
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Puncha W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Rangamatia W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f.01.09.2024 to 31.08.2025)
Daily Operation Mtc. of Rising Main all distribution system, sluice valve, street stand post etc. under Sonathali W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f.01.09.2024 to 31.08.2025)
Daily Operation Mtc. of Rising Main all distribution system, sluice valve, street stand post etc. under Sonathali W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f.01.09.2022 to 31.08.2023)
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone-I) under Raghunathpur Sub-Division, P.H.E. Dte. (w.e.f.01.09.2018 to 31.08.2019)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Joypur W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020)
Daily Operation Mtc. of Distribution system, sluice valve, community stand post at Palaskola Zone under Palaskola-Keliyathol W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2021 to 31.08.2022)
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Sarbari W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2022 to 31.08.2023)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Hutmura W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Rangamatia W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2025 to 31.08.2026)
Supply and delivery of different dia. CIDF Pipes, Sluice valve and fittings for construction of RCC OHR (450 cum capacity) for Hiranyagram W/S. Scheme under Burdwan Division, P.H.E. Dte.
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Sutabai W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f.01.09.2022 to 31.08.2023)
Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara and Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Kotshila W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Supply and delivery of different dia. CIDF Pipes, Sluice valve and fittings for construction of RCC OHR (400 cum capacity) for Chakshanjadi W/S. Scheme under Burdwan Division, P.H.E. Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Bandwan W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Sutabai W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2025 to 31.08.2026)
Supply and delivery of different dia. CIDF Pipes, Sluice valve and fittings for construction of RCC OHR (400 cum capacity) for Ruppur W/S. Scheme under Burdwan Division, P.H.E. Dte.
Daily Operation and mtc. Of rising main and all distribution system, sluice valve, street stand post etc. at Zone-I under Balarampur W/S Scheme under Purulia Division, P.H.E. Dte
Daily Operation Mtc. of Distribution system, sluice valve, community stand post at Palaskola Zone under Palaskola-Keliyathol W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2024 to 31.08.2025)
Supply and Delivery of Sluice Valve of various sizes for pipe line maintenance of Baruipur Block at Baruipur Sub-Division under South 24-Pgns. Water Supply Division-I, PHE Dte.
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Sarbari W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2022 to 31.08.2023)
Daily Operation and mtc. Of rising main and all distribution system, sluice valve, street stand post etc. at Zone-I under Balarampur W/S Scheme under Purulia Division, P.H.E. Dte
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Sarbari W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2024 to 31.08.2025)
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Kashipur W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01.09.2022 to 31.08.2023)
Supply, delivery and Installation of 700 mm Electrically Operated sluice Valve at Clear Water Pumping Station of D Roypur water supply project under South 24-Pgs Mechanical Division,PHE Dte.
Daily Operation Mtc. of Distribution system, sluice valve, community stand post at Keliyathol Zone under Palaskola-Keliyathol W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte.(w.e.f. 01.09.2025 to 31.08.2026)
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Paharpur W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte.(w.e.f. 01.09.2025 to 31.08.2026)
Daily Operation Mtc. of Distribution system, sluice valve, community stand post at Keliyathol Zone under Palaskola-Keliyathol W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte.(w.e.f. 01.09.2022 to 31.08.2023)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Chitmu W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Daily Operation Mtc. of Distribution system, sluice valve, community stand post at Palaskola Zone under Palaskola-Keliyathol W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte.(w.e.f. 01.09.2025 to 31.08.2026)
SUPPLY AND FITTING, FIXING OF NEW SPINDLE, GM NUT AND OTHER ALLIED COMPONENTS OF 700 MM DIA. DELIVERY SLUICE VALVE OF PUMP NO.-3 AT RWPS PH-I OF GRWW.
Trial Run of Joypur Water Supply Scheme (Except Electro Mechanical Component) of all distribution system, Sluice valve, FHTC etc under Purulia Division, P.H.E Dte (For the Period of 90 days)
Special repairing work of UPVC pipe line and interconnection to increase Functionality of FHTC and installation and Construction of sluice valve chamer at Radhakantapur, Gosaidihi, Monoharpur, Gopalpur and Monaharpur mouzas
Materails only for 80 mm bore GI tubing medium grade laid in trenches, Materails only for 50 mm bore GI tubing medium grade laid in trenches, Materails only for 40 mm bore GI tubing medium grade laid in trenches, Materails only for 25 mm bore GI ... bore gate valve gun ... bore gate valve gun ... bore gate valve gun ... bore gate valve gun ... diaBall valves high ... diaBall valves high ...
Emergent works for repairing pipe line, FHTC refining, ferrule wash with supply of sluice valve and construction of valve chamber under Augmentation work at Kamlabas W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasa
Laying of pipeline for providing FHTC 100 percent coverage and also constn., installation of Sluice Valve,Valve Chamber to control the flow of water,road restoration work etc. of different PWS Schemes, Block Jamalpur under Burdwan Division, PHE Dte.
e auction sale of survey reported unserviceable materials damaged Wooden Materials Damaged GI pipe HCI Pipe Old and Damaged Grill and rusted Peets valve and Sluice valve etc obtained from the different types of works underthe jurisdiction of KSSDIV
VALVE, GATE, CI, 2IN, FLGD (ref PR No 4202004406), VALVE, GATE, CI, 3IN, FLGD (ref PR No: 4202004406)
ZERO LOSS DRAIN TRAP MECH VALVE- 3/4 IN, ZERO LOSS DRAIN TRAP MECH VALVE- 1/2 IN
Combined Station Work (CSW) for installation of 16 nos. ball valves at HMRBPL Haldia
Supply and fitting of two sets of boiler valves at Madhaipur Colliery, Pandaveswar Area
Servicing of HP Valves and Actuator during OH of U3 and U6 under TM
SS clip used in Safety Cap for self closing valves of LPG cylinders (Q3)
Procurement of Slide Gate Housing of Material Handling Valves for FAHS of Unit-8
Procurement of 300NB, 250NB, 200NB, 150NB, 100NB and 80 NB Gate Valves for SgTPP.
Overhauling of HP Valves and Servicing of Actuators of Unit#3 under BM Dept.
PROCUREMENT OF NORGREN HERION MAKE SOLENOID VALVES AND COILS FOR TG AREAAT NTPC FARAKKA
Procurement of 150 NB Pneumatic Actuator Operated Butterfly Valves under AHP (MM) Dept., STPS.
Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) as per IS: 1703 (Q4)