Loading…
Loading…
15,777 results • Best match
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Janaphul
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Maslandap
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Khosdelpu
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Kamarpur
VALVE FOR THROTTLE VALVE ASSEMBLY TO M/S SIL NEW REF NO. S0220131801 OR M/S CPL PART NO. C01920 OR M/S GSEC DRG.NO. GSEC/PANTO/092 FOR AM12/IR01/PAN01 TYPE PANTOGRAPH" . Firm's offer accepted - VALVE
Kit for D-1 Emergency Valve Strainer for WDG4 (HHP Loco) consisting of 02 items:- (1) Neoprene Gasket D-1 Emergency valve - 01 No. (2) Seal Gasket for D-1 Emergency valve - 01 No. Accepted Firm`s offe
Set of Disc valve for ELGI compressor model RR20070 OFM Consisting of following items. 1.DISC VALVE LP CYL DIA 150 AS PER ELGI PART NO.B009801070021-2nos./set. 2.DISC VALVE HP CYL DIA 100 AS PER ELGI
Set of spares for M/s. WSF Limiting valve consisting of 8 items. S.No. Descripton Part. No. Qty 1) Valve Spring A 9002/3 1No. 2) Valve Complete A 87561/8 1No. 3) Retaining Ring A72910/5 1No.
Kit of spares for M/s. ELGI make comp. type TRC1000 MN consisting of 5 items 01 no. each as follows: 1) Breather valve - ELGI Part No. A020030, 2) Drain valve - ELGI Part No. A020045, 3) Valve Seat -
Kit of spares for M/s ELGI make compressor type TRC1000MN consisting of 05 items 01 no. each as follows: 1)Breather valve Part No. A020030 2)Drain valve-ELGI Part No- A020045, 3)Valve seat- ELGI Par
Set of kits for Rotex valve as follows : (1) Overhauling kit for IP Magnet Valve , Rotex type : 3403-25-SB consisting of 09 items. Qty. = 14 Sets / Set , (2) AOH kit for IP Magnet Valve , Rotex type 3
INSTALLATION OF NEW VALVE AT INLET MAIN PIPE LINE AT PARNASREE BPS
Erection, Testing and comissioning - Gwalior IRD, OEM visit for Erection, Testing and comissioning - Hubli New IRD, OEM visit for Erection, Testing and comissioning - Jabalpur IRD, OEM visit for Erection, Testing and comissioning - Kadappa New IRD, ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ... POV Ball Valve - ...
RESTORATION OF FILTERED WATER SUPPLY BY PROVIDING SLUICE VALVE AND REPAIRING LEAKAGES NEAR H/NO-37, SIDDHINATH CHATTERJEE ROAD, P-105, UNIQUE PARK AND OTHER DIFFERENT LOCATIONS IN WARD NO 130, BR XIV.
Daily Operation mtc. of rising main distribution system, sluice valve, Street stand post etc. Marble Lake W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Lagda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Supply and delivery of 150 mm dia C.I. sluice valve and others Miscellaneous items for different Govt Own and Operated Major RLI Schemes under Assistant Engineer (A-M) Mathabhanga (Agri-Mech) Sub-Division
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Puncha W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for Nabakishore PWSS Scheme
Operation and Maintenance of Distribution and Rising Main, Pipe line (CI/DI/AC/UPVC/HDPE), Street Stand Post of RAIPUR W/S Scheme including operation of sluice valve under Bankura Division, P.H.E. Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Chitmu W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Manbazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Daily Operation mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Arsha Its Adjoining Area W/S Scheme Zone-I under Purulia Sadar Sub-Division, P.H.E. Dte.
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01.09.2023 to 31.08.2024)
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Ground Tube well, IEP, Stand Post, FHTC and operation of sluice valve for Kushmuri Zone-A
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for Joyrambati PWSS Scheme
Operation of different dia sluice valve at different points for distribution of water from different 6 nos ESR and Badra UGR at Dum Dum Municipality area for a period of 1(one) year
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Chitmu W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01.09.2023 to 31.08.2024)
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), RBTW with Collecting Line, Stand Post, FHTC and operation of sluice valve for Betanal Zone-A
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post / community stand post etc. under Barabazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Hutmura W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Joypur W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2025 to 31.08.2026
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone-I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f.01.09.2020 to 31.08.2021)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Puncha W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Supply, Delivery of Sluice Valve, Pipes for Kacharipotty ward no-18, Jambuni madrasha para ward no -05, Bhubandanga ward no -06...ward no-18, kalipur par ward no-17, Moldanga Ward no-04.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Bandwan W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Operation of different dia sluice valve at different points for distribution of water from different 6 nos ESR and Badra UGR at Dum Dum Municipality area for a period of 1(one) year
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Satra W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2025 to 31.08.2026
Daily Operation and mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Khudagara W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2018 to 31.08.2019)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Joypur W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2022 to 31.08.2023
Daily Operation mtc.of rising main all distribution system Sluice Valve, Community Stand Post under Jhalda Municipality W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Ground Tube well, IEP, Stand Post, FHTC and operation of sluice valve for Kushmuri Zone-B
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for Kotulpur PWSS Scheme
Daily Operation mtc. of rising main distribution system, sluice valve, community stand post etc. under Boram its adjoining mouza W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020)
Construction of Household Tap Platform at different household, Construction of Sluice Valve Chamder etc. for Chemaguri W/S Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for Rampur PWSS Scheme
Daily Operation and mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Khudagara W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2020 to 31.08.2021)
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01.09.2023 to 31.08.2024)
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone-I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01.09.2024 to 31.08.2025)