Loading…
Loading…
15,782 results • Best match
Daily Operation and mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Khudagara W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2020 to 31.08.2021)
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01.09.2023 to 31.08.2024)
Daily Operation and mtc. of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone-I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01.09.2024 to 31.08.2025)
Restoration of concrete road by Cement concrete Solar submersible pump, Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Manbazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Kotshila W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for Moynapur PWSS Scheme
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Satra W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2022 to 31.08.2023
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for Patrasayer PWSS Scheme
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Hutmura W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Daily Operation mtc.of rising main all distribution system Sluice Valve, Community Stand Post under Jhalda Municipality W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2022 to 31.08.2023
Daily Operation and mtc. Of Distribution system, sluice valve, Community stand post etc. under Arrah W/S Scheme (Zone-I) of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte.(w.e.f. 01.09.2025 to 31.08.2026)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Bandwan W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
Supply and delivery of 150 mm dia C.I. sluice valve and other Miscellaneous items for different Govt Own and Operated Major RLI Schemes under Assistant Engineer(A-M) Coochbehar(Agri-Mech) Sub Division
LAYING OF 300 MM DIA BYPASS LINE INCLUDING INSTALLATION OF SLUICE VALVE ACROSS 1200 MM DIA BFV FITTED ON 1400 MM DIA DEDICATED TRANSMISSION MAIN ADJACENT TO GHOLSAPUR MARKET ON JAMES LONG SARANI.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Kotshila W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Repairing by jacketing of perforated 700mm dia delivery bend pipe near the sluice valve adjoining area including replacement of dilapidated expansion joint with other allied works of pump unit no. C at DLPS
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Manbazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Puncha W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Laying of Rising main DI K7 interconnection work with HDPE pipe construction of sluice valve chamber for Umacharanpur PWSS Under Birpara Subdivision Alipurduar Division PHE Dte Under North Bengal Circle I PHE Dte
Operation and Maintenance of Distribution and Rising Main, Pipe line (CI/DI/AC/UPVC/HDPE), Street Stand Post of MUKUNDAPUR W/S Scheme including operation of sluice valve under Bankura Division, P.H.E. Dte
Operation and Maintenance of Distribution and Rising Main, Pipe line (CI/DI/AC/UPVC/HDPE), Street Stand Post of TALDANGRA W/S Scheme including operation of sluice valve under Bankura Division, P.H.E. Dte.
Construction Sluice valve chamber withdrawing and relaying of DI pipe and other allied works at Gosaba (Zone-III) (old) W-S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Bandwan W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Joypur W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc.of rising main all distribution system Sluice Valve, Community Stand Post under Jhalda Municipality W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, Street stand post etc. Marble Lake W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Satra W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Chitmu W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Lagda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Arsha Its Adjoining Area W/S Scheme Zone-III under Purulia Sadar Sub-Division, P.H.E. Dte.
Daily Operation mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Arsha Its Adjoining Area W/S Scheme Zone-II under Purulia Sadar Sub-Division, P.H.E. Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Hutmura W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Kotshila W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2025 to 31.08.2026
RESTORATION OF BROKEN AIR VALVE PIPE LINE CONNECTED TO 60 INCH DIA PALTATALLAH WATER TRANSMISSION MAIN OPPOSITE TO TITAGARH MUNICIPALITY EASTERN FLANK OF B.T. ROAD.
Buy Back - Small Sized Valve Regulated Lead Acid Batteries, Buy Back - Small Sized Valve Regulated Lead Acid Batteries Experience with Government Required 1 Year (s)
Dismantling of HP-IP-LP Turbine with valves, bearings etc and assemble with other relevant rotors
Overhauling of HP Valves,Gates,Dampers and Actuators at Unit 6 during July August of 2024
Procurement of different Types of High Pressure Valves for Boiler of Unit-7 and 8/DPPS
Procurement of different sizes of HP Globe Valves for Boiler of Unit-7 and 8/DPPS
Overhauling servicing of HP valves and Actuator during OH in2023 of unit 4 under BM dept
Operation of pumps, valves for underground pump house and allied water supply to the academic are
Procurement of Valves for Renovation of Service Water line at CHP,BkTPS through CAPEX 2023-24
Procurement of different types of Valves for U-5 Overhauling under AHP-MM dept. at BkTPS
Oil level indicator of Transformer as per ABB document No- HSTN 420277P0015. MAKE : BARODA VALVES & SOLENOIDS
Register Sick and Lame animal 250 pages, Envelop 11 x 5, Envelop A4 Size, Talc Sheet 2 Feet, Toner Refiller, Gum Bottle 700 ml, Pressure Cooker Regulator, Terakota Red, LCD TV Installation, Water Purifier parts Shut off valve comma check valve and clamp
O RING, O-RING, CROSS and BEARING, HOSE, SWITCH PRESSURE, REPAIR KIT, SPHERICAL PLAIN BEARING, SNAP RING, SEAL KIT, PULL DOWN CYL., CAP JACK, JACK PAD, SEAL KIT F-03749603, SEAL KIT CHECK VALVE B-03749622, KIT, SEAL KIT R VALVE V-02249603
SUPPLY AND INSTALL OF 300 MM DIA RISING VALVE, 150 MM DIA AIR VALVE,SHURBS CLEANING WITH ANCILARY WORKS ON INLET AND OUTLET AT PATULI 1 NO OVER HEAD IN WARD NO 101BR-XII
VALVE DISC, 01232001000/33, BHEL, BUSH, 0-12305- 01000C/08, 0-12305-01000C/09, HP HOSE, 01391801000/00/1, HOSE, 1-142-14-01000C, 01132202000C/014
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Sadpur wate