Loading…
Loading…
2,122 live1,368 closing this weekmost from Directorate of Local Bodies UP and Rural Development and Panchayat Raj Department
2,122 results • Best match
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village ERAYA Block BHITARWAR Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and
Repairing of UPVC pipe line with reconnection of FHTC and allied work at Ramnapara Water Supply Scheme within Bhagwangola-II
MOEI and Fans ic RMO DG set, Pump sets, Sub-station, FA and PA system and CH Plant at AG office Srinagar during 2026-27 SH Comprehensive Maintenance of CHP of capacity 3x6 Lac Kcal Hr Boiler FCUs and complete hot water pipelines in building at AGs office complex Srinagar during 2026-27.
Installation of Submersible Pump with Tank, Pipeline and Community Toilet at Rampura Mouza (Near Harekrishna Seva Sangha) of Makrampur GP under Narayangarh Block in the District of Paschim Medinipur.
Construction of Therina mane and development of maddina gudi at ward no 03 and laying of UGD pipeline infront of Honda showroom BM Road at ward no 02 of TMC Channayapatna TMC limit
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) for Execution of Underground Pipeline (UGPL) Irrigation System in Pressurised and Gravity flow in the Area of Khairibhandan Irrigation Project,Jashipur, Dist-Mayurbhanj covering distribution network
REVISED DNIT FOR REPLACEMENT OF PIPELINE COLUMN PIPE WATER CONNECTION SLUICE VALVE REPAIR OF CHLORINATOR And REPAIR OF EXPANSION JOINT OF WATER SUPPLY SCHEME KANG SABOO BLOCK NAKODAR DISTT JALANDHAR UNDER 15th FC
REPAIR/ REPLACEMENT OF CORRODED CI/GI WATER SUPPLY PIPELINE OF OFFRS MD ACCN AND MAP QTRS AT VARIOUS LOCATIONS AND ADJACENT AREA OF ACC AND S AND STN HQ UNDER GE (N) AHILYANAGAR.
Work to lay a 1335-meter HDPE pipeline of 110 mm diameter from Vishwakarma Chowk to Ramesh South Indian Dosa on Bhopa Road to streamline the drinking water system in the city area.
Work to lay a 1400-meter HDPE pipeline of 110 mm diameter on Sirkul Road from Mahavir Chowk to Chaudhary Charan Singh Chowk to streamline the drinking water system in the urban area.
Supplying, fitting and fixing different types valves used in fire fighting pipelines i.c.w. Gangasagar Mela - 2027
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village DONI Block BHITARWAR Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and d
AUGMENTATION OF W S SCHEME BHIWANI TOWN Construction of water works structures and Boosting stations at various location including RCC SS tanks Boundary wall clear water tanks pump chambers R W suction well Rising main lines electric etc
Proposal for lining up Rate Contract for emergency repair works such as pipeline leak, burst, pilferage and other miscellaneous maintenance activities in mainline jurisdiction for BKPL stations into 3 Groups Group C ERPL Jasidih
Supply and Lowering, Laying M.S pipeline for linking of pond situated at the existing 16 MLD Water Treatment Plant Dabhel with the pond situated at the Atiyawad Char Rasta Dabhel, Nani Daman. (E-11759)
Providing New Bore well with 7.50 H.P Submersible motor pump and extension of pipeline from Govt Arts and science college in Indra Nagar H/o Komarapalayam under Panchayat Union General Fund works 2026-2027
Estimate for construction of concrete lining of Attalan Minor from RD 55030-63880 and laying underground RCC pipeline in Escape Channel from RD 63880 - 65500 to connect the Attalan Minor tail with Kalwanoo Drain.
Providing, laying, testing & Commissioning of HDPE pipeline at PSV nagara(2R-03) and Flow Control Valves at off take points at Troopline (2R-06) in Ramanagara city under Scarcity for the year 2025-26
Balance work under JJM at Village Umri Block Panna based on TW. i.c pipeline, OHT, Sump well etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
BID DOCUMENT FOR RATE CONTRACT FOR CS PIPELINE LAYING AND ASSOCIATED WORKS IN BAREILLY GA FOR CITY GAS DISTRIBUTION PROJECT OF M/S. CENTRAL U. P. GAS LIMITED, FOR THE PERIOD OF 06 MONTHS.
REPAIR AND MAINT OF THE VARIOUS TYPES OF PIPELINE INCLUDING REPLACEMENT OF THE OLD WORN OUT PIPES, VALVES FITTTING ETC. ALONG WITH THE MISC ITEMS OF ZONE C AND D UNDER GE (WEST) PATHANKOT
SURVEY INVESTIGATION DESIGN SUPPLY ERECTION TESTING AND COMMISSIONING OF KALAGHATGI TANK FILLING SCHEME FOR FILLING UP OF 107 TANKS LOCATED ON LEFT BANK AND RIGHT BANK OF RIVER BY LIFTING WATER FROM BEDTHI RIVER IN KALAGHATAGI TALUK ON TURN-KEY BASIS ... POINT RISING MAIN PRESSURE ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Girls Hostel; Power Generators, Pipelines; Service Provider
Estimate for remodeling of water course O/L Rd 56020 L Kaluana disty (By laying pipe line) for balance work 5697 feet
PROVIIDING PIPE LINE CC DRAIN AND CC ROADS TO KABADI GUDEM 1ST LINE IN DIV.NO.14 UNDER AE-11 SECTION (5TH CALL)
PROVIDING SEWERGE FACILITY, CONSTRUCTION OF 3.00 MLD STP FOR BARANA and BABAIL INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINE
Sanitation and plumbing pipe line for dormitory, Additional development in kitchen cum dining & academic block etc., in APSWREIS(Girls)., Garugubilli. (2nd call)
Bituminous Concrete Road Restoration works for Laying of Raw Water Rising Main Line (450mm DI, K9 Pipe) from Intake at Samuihal to WTP at Ghatal polytechnic College in respect of Water Supply Project within Ghatal Municipality Under AMRUT 20
Ward - Malviya Nagar Pipeline extension work
Providing and Laying of Sewage Pipeline and Construction of Machineholes at 7th main road and 4/5 Gully roads, 10-11th Gull, Ramaiah road down and other roads of Ward no-56 of Mysuru City.
REPAIR REPLACEMENT OF US RUSTED PIPELINE INCL CONNECTED ITEMS SUCH AS FITTINGS AND CONTROL VALVE AND REPAIR REPLACEMENT OF EXTERNAL SERVICES ELECTRIFICATION SUPPLY DISTRIBUTION SYSTEMS AND CONNECTED ALLIED WORKS AT MEG CENTRE UNDER GE NORTH
Work Of Providing, Laying, Jointing, Testing and Commissioning of Pipeline for Drinking Water Supply in Municipal Area of Baswa, District Dausa including 05 year O and M after completion of one year defect liability period,
Providing, laying, testing and Commissioning of HDPE pipeline at Rehamaniyanagara, Janatha colony2R-03 and Flow Control Valves at off take points in Rayaradoddi R-05 in Ramanagara city under Scarcity for the year 2024-25
Tirupathur District 15th CFC VP 2025-26 Erection of New Motor, Pipes and Constrcution of New 10000 lit OHT (7.50 m stage) with extension of Pipeline at Thukkaram Vattam inPerumapattu Tirupattur Block Package No.01
p/f 1.50 hp submersible motor, control panel and lowering of submersible motor by column pipe for new borewell and pipeline work at 33/11 kv s/s premises jhalmala under (o&m) dn raigarh.
Working Survey, Design & Construction of Intake Well with Approach Bridge, Providing, Supplying, Lowering, Laying and Jointing various dia. of DI-K9/MS Rising Main Pipelines, RCC Sump, Pump House, Staff Quarter, Compound Wall, Supplying and erecting Pumping Machinery Including all Electro-Mechnical-Instrumentation and SCADA Works at Various HWs to SHWs under Water Supply Scheme Based on Bhadbhut Barrage (RHS) for Industries (GIDC) and Rural Areas of Bharuch and Vadodara Districts with 10 Years of Comprehensive O&M of entire scope of work. Dist.: Bharuch
(SH- Providing and installation of Raw water Mono Block pump set , Installation of centrifugal pumping machinery 475 HP 1set along with its allied accessories , Repair of existing Rising main 450 mm dia and C/O Anchor block )Under PDNA (Balance work)
Repair and construction of Boundary wall 80 Mtrs. Construction of 2 No. HLT size i.e. 8.84 x 6.10 x 1.83 Mtrs. Laying of 200 mm i/d D.I. rising main 2700 Mtrs. From proposed water works to old existing water works
Bidders should go through the scope of work and visit site for better understanding
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Huadies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Huadies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGP Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.