Loading…
Loading…
14,433 results • Best match
Restoration of Major leak over 700mm dia CI pumping main at Suddapalli Donka, 450mm dia Back wash pipeline at Old Clear water pump house at Takkellapadu.
Replacement of Existing pipe line damaged portion laying of 110mm dia HDPE Water pipe line from D.No. 18-1-539 to 18-1-610/B, 18-1-560/a to 18-1-644 and 18-1-622/a to 18-1-404 at Bhavani Nagar Ward No. 34 Under Zone-VI.(Reserved for SC/ST and Waddera).
Laying of pipeline from D.No.23-1-10/2 to D.No.23-1-16 and D.No.23-4-12/1 in Seelam vari savaram ward No.6
Laying of pipeline, UGD and CC road from north to south side from Mallikarjuna house to kadapa road behind YS Bharathi street in Bakarapuram of Pulivendula town
Laying of pipeline, UGD and CC road from D.No. 3-10-220-24 to 3-10-216-15(3) at Jayamma colony in Bakarapuram of Pulivendula town
Laying of Pipeline and CC patch from D.No. 2-7-397 to 2-7-435-1-2 in Jandamanu street of Missamma Bunglow Secretariat of Pulivendula Municipality
Drilling of Borewell and Laying of Pipeline from Borewells to Pumping mainlines in Penna River for Improving of Water Source in Tadipatri Municipality under Municipal General Funds.
Laying of Pipeline from D.No.7-2-27 to 7-3-29/1 b) 7-1-2/1 to D.No.7-1-3/1 in 26th ward
Laying of pipeline from excise police station to Electrical pole no.301/13 at Dasari colony in 9th ward of Gooty Municipality Under DMF Grants 2025-26
Repairs and Rectification of various sizes of distribution pipe line leaks and pumping main leaks under 10MGD and 2MGD water treatment plant in ward Nos.50,51,52,60,61 and 62 of GVMC for the year 2019-20
Repairs and rectification of various sizes of distribution pipe line leaks and pumping main leaks under 12MLD water treatment plant in ward nos 53 & 58 in AE KBR of GVMC for the year 2019-20
Repairs and rectification of various sizes of distribution pipe line leaks and pumping main leaks under 12 MLD WTP in Ward No. 53 and 58 in AE -KBRsection of GVMC for the year 2021-22
Replacement of old water supply pumping main from Erra Katta to Santhi nagar church with 800mm dia DI pumping main in 51st division
Maintenance of Kalyani water supply Arresting of leakages on raw water & Clear Water pipeline from Kalyani filter house to Alipiri pump house.
Development of Walking Track, Water Pipeline, Park Lighting paintings, to the Dr YSR Memorial Municipal Park in ward No 06(4th call)
Development of Walking Track, Water Pipeline, Park Lighting paintings, to the Dr YSR Memorial Municipal Park in ward No 06(3rd call)
Replacement of 2 Nos. of AHUs and dismantling and shifting 1 No. AHU and ducting system, chilled water pipe line etc., available on the terrace and installation in 2nd floor of OPD building in SVIMS Hospital, Tirupati (Part-A portion)
Replacement of Pumping Main to Vontimitta in Vontimitta Mandal
Providing pumping main in Nandivargam Village of Banaganapalli Mandal
Maintenance of leaks on Raw water pumping main line
Replacement of 100mm dia damaged AC pipe line with HDPE pipelines to maszid opp road and kumar tea stall opp roads in New Raja Rajeswaripeta 57th Division
Laying of pipe line a) From D.No.23-8-217 to D.No.23-8-211 B) From D.No.23-8-208 to D.No.23-8-201 in YSR Nagar ward No.5th ward
Yerraguntla Nagar Panchayat - GGMP 2022-23 - Laying of Pipe Line from D-no-4-2-56 R. Muni reddy house to D-No-4-2-96 of Ward 11 in Yerraguntla Nagara Panchayat.
Laying of pipe line from D.No.1/616a to 1/736 and from D.no.1/628 to HSC no.3291 in Gayathri colony and vidya mandir in pamidi town under 14thFC 2016-17
Yerraguntla Nagar Panchayat - GGMP 2022-23 - Laying of Pipe Line from D-no-4-2-56 R. Muni reddy house to D-No-4-2-96 of Ward 11 in Yerraguntla Nagara Panchayat.
Yerraguntla Nagar Panchayat - GGMP 2022-23 - Laying of Pipe Line from D-no-4-2-56 R. Muni reddy house to D-No-4-2-96 of Ward 11 in Yerraguntla Nagara Panchayat.
Improvements to PWS scheme and Providing Pumping Main to SS Tank at Agarthipalem village of Palakol Mandal, Est. Cost Rs. 13.00 lakhs
Replacing of existing Old damaged M.S. Pipe line with new MS Pipeline at Dowlaswaram 10 MLD Plant opposite in 17th division.
Replacing of existing Old damaged M.S. Pipe line with new MS Pipeline at Dowlaswaram 10 MLD Plant opposite in 17th division.
Repairs and rectification of various sizes of distribution pipe line leaks and pumping main leaks under 2MGD water treatment plant in ward Nos.51,52(p),61(p) and 62p of GVMC for the year 2017-18.
Shifting of 800mm dia. Water supply pumping main with 800mm dia. DI K9 Pipe line from Arunodaya Nagar Sundaramma Dibba to Singh Nagar Fly-over including Budameru Canal Crossing. General funds Rc.E11-101740/2025 (2nd call)
Repairs and rectification of various sizes of distribution pipe line leaks and pumping main leaks under 12MLD Water treatment plant in Ward Nos. 86 and 87 in AE KBR of GVMC For the year 2023-24
Repairs and rectification of various sizes of distribution pipe line leaks and pumping main leaks under 12MLD Water treatment plant in Ward Nos. 86 and 87 in AE KBR of GVMC For the year 2022-23
Arresting major Pumping main and Distribution main pipe line leaks & Sluice valve repairs in regular water supply maintenance for the period of 6 months of the (Zone -3) 41 to 50 Divisions in Machilipatnam Municipal Corporation.
Manning Operation fro Street Lighting maintenance and maintenance of Water Supply distribution pipeline, Bore wells, Pump house for the year 2017-18 of Palasa-Kasibugga Municipality with General Funds
Manning Operation fro Street Lighting maintenance and maintenance of Water Supply distribution pipeline, Bore wells, Pump house for the year 2017-18 of Palasa-Kasibugga Municipality with General Funds
Public Health Circle, Ananthapuramu-Proddatur Municipality-Remodeling of existing water supply distribution pipeline and construction of ELSRs(4 nos) with full SCADA including restoration of roads in Proddatur Muncipality
Supply and laying of distribution pipeline from MRO office to Prajasakthi Nagar and interconnection at crossroads from Police station to MRO office in Piduguralla Municipality under Gadapa Gadapaku Manaprabhutvam
Shifting of Existing Drinking Water Pumping Main of 400mm dia DI K9 (Raw Water Pumping Main) in New RTC Bus Stand in Pulivendula Municipality
General Fund - 2023 - 2023 - Laying of Pipeline from Govindhapalam Tank to Bore Wells at Govindhapalam Tank in Ward No.10 for Maintenance of Water Supply in Puttur Municipality.
Laying of pipeline, UGD and CC road from D.No. 4-7-317-C to 4-7-312-11 towards north to south in SBI colony of Pulivendula town
General Fund - 2023 - 2023 - Laying of Pipeline from Govindhapalam Tank to Bore Wells at Govindhapalam Tank in Ward No.10 for Maintenance of Water Supply in Puttur Municipality.
Excavation of Trenches, HDD, Laying of Pipes, OF Cable blowing and other allied works
Providing Gravity main at Neelayapalem (V) in Chinaganjam (M) in Prakasam Dt, est cost 9.00 Lakhs
Construction of Pump house and Laying pipeline to lift water from Gandikota foreshore area to Gangadevipalli cheruvu near Gangadevipalli (V) in Muddanur (M) of YSR District.
Completion of Electrical works and works at dormitory, water pipeline at dormitory etc., to Dr.B.R.Ambedkar Gurukulam at Tiruvuru (V&M) in NTR District
Maintenance of Kalyani Water supply - Arresting of leakages on raw water pipeline from Layani filter HOuse to Ailipiri filter house under Zone-VI.
Providing of Drinking water Pipeline from D. No. 23-217 to 23-225 at Amidala street in 18th Ward Secretariat under 11th Division
Dr MVR RTPP- Stage-III- O&M- Arresting leakage of water from Raw water pipeline ( SPVBR to RTPP) for the year 2025-26
Supply of Shovel, Welding set, Diesel generating set and Diesel Dewatering pump on hire for raw water pipeline leak at Kandrika near Koduru