Loading…
Loading…
2,750 results • Best match
Construction of 9 No 10,000 Gln GSR/Sump Tank, 1 No 20,000 Gln GSR/Sump Tank, 2 No pump room, 360 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Seiya (JJM).
Construction of 1 No 10,000 Gln GSR/Sump Tank, 1 No 30,000 Gln GSR/Sump Tank, 1 No Pump Room, 180 mtr b/wall, Laying and Fitting Rising Main and Distribution system under WSS Khargala (JJM).
Construction of 7 No 10,000 Gln GSR/Sump Tank, 2 No 20,000 Gln GSR/Sump Tank, 3 No pump room, 720 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Gagrote (JJM).
Construction of 1 No 10,000 Gln GSR/Sump Tank, 1 No 15,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Badnoo (JJM).
Construction of 1 No 50000 Gln GSR/Sump Tank, Construction of 1 No 20000 Gln GSR, Construction of 1 No 10000 Gln GSR, Laying and Fitting Rising Main and Distribution system under WSS Ujhan-A (JJM).
Construction of 6 No 10000 Gln GSR/Sump Tank, 2 No Pump Room, 08 Nos spring covers, 01 No. fencing and sign board, Laying and Fitting of Rising Main and Distribution system under WSS Rehan (JJM).
Construction of 01 No 20000 Gln GSR/Sump Tank, Construction of 06 No 10000 Gln GSR, 2 Nos Pump Room, 02 No. Compound wall, Laying and Fitting Rising Main and Distribution system under WSSDanna Chatyar (JJM).
Construction of 2 No 20000 Gln GSR/Sump Tank, Construction of 4 No 10000 Gln GSR, 4 Nos Pump Room, 01 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Nerojal (JJM).
Construction of 1 No 10,000 Gln GSR/Sump Tank, 1 No 25,000 Gln GSR/Sump Tank, 1 No Pump Room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Kurrah (JJM).
FIRE CRACKERS FOR JAMBU ZOO, REPAIR WORKS OF WATER COOLER INSTALLED AT JAMBU ZOO, MOSQUITO JALI 4 FEET X 50 FEET MS JALI, PROVIDING AND LAYING OF PIPE LINE FROM DIRECTOR OFFICE TO VETERINARY HOSPITAL AT JAMBU ZOO, LABOUR WORK FOR PROVIDING AND LAYING OF PIPE LINE...
Providing Laying and Fitting of HDPE GI pipes construction of Chain link fencing construction of Anchor Saddle blocks road restoration during laying of pipes and renovation improvements to existing pipe network WSS Ferozpora under NAB
Laying/ installation of water pipelines at Ward No.2 of Panchayat Halqa Kachnambal-B (PRI GRANTS)
Repair/ Maintenance of pumping system, pipelines and Control valves at JNE area under GE (U) Udhampur
REPAIR/REPLACEMENT OF LEGGINGS, JOINTS PIPELINES, ETC AT OMQ AND TECH AREA UNDER GE (AF) SRINAGAR
as refer boq
REPAIR IMPROVEMENT REPLACEMENT OF WATER SUPPLY GI PIPE LINE AND OTHER ALLIED CONNECTED WORKS AT UNDER GE SAMBA
REPAIR MAINT OF SOLAR WATER HEATERS ELECTRIC PANELS CONNECTED PIPE LINE CABLES AND CONNECTED ITEMS AT AKHNOOR UNDER GE (NORTH) AKHNOOR
Augmentation of Water Supply facilities at Kawbagh Nunner by way of laying/fitting of G.I pipe line for WSS Nunner UPD
Repairs to 300mm dia delivery pipe line at Lift irrigation cum dewatering scheme KP Payeen and allied works of MISD Pattan.
Providing Laying Fitting of GI/HDPE Pipe Line for Providing Water Connection to PS Wanda under Maintenance and Repair (JKSSR 2020)
Providing and fitting of new suction / delivery pipe line alongwith MCCB, aluminum cable at pumping station Thill Roun stage-0 (old).
Watch cum ward of flanged feeding pipe line from Ningli Nallah to BSF Campus singhpora under SHQ BSF Baramulla (March 2020)
Distribution of water supply pipe line from old basti to Chinar Mohala, Sheikh Mohala and Naibasti C. G. Dhar Under PRI
Extension of distribution system by way of laying/ fitting of G.I. pipe line at Tawheed Abad Colony Nagbal / Najar Colony (UPD)
Spl repair to main water supply pipe line feeding to JNE area from Pittangarh to JNE area under GE (Utilities) Udhampur
Repairs/Relocation of Oxygen, Vacuum and Medical Air Pipe line from PHE Station to Saria Block at Govt. LD Hospital, Srinagar.
Repair/Replacement of pipe line and control valve pumping system and switchgear installed at B Reservoir area under GE (Utilities) Udhampur
Spl repair to main water supply pipe line feeding to JNE area from Pittangarh to JNE area under GE (Utilities) Udhampur
Repair/Replacement pipe line control valve pumping system and switchgear installed at MAP Accn at different location under GE (Utilities) Udhampur
REPAIR AND MAINTENANCE OF SUBMERSIBLE PUMPS, STARTERS, SLUICE, PIPE LINE AND CONNECTED ITEMS AT AF STATION NATHATOP UNDER GE (AF) UDHAMPUR
Providing and laying of Augmentation of 80mm dia pipe line from 20000 glns GSR to existing 20000 glns GSR Dev Nagar
Repair Replacement pumping system, pipe line control valves pumping system and switch gear installed at JIB area under GE Utilities Udhampur
central air compressor with copper pipeline
Custom Bid for Services - COMPREHENSIVE TESTING OF 4000 METERS LPG PIPELINE INCLUDING VISUAL INSPECTION HAMMER TEST UTT MP TEST HYDRO TEST ALONG ISOMETRIC DRAWING Similar Category Hiring of Third-Party Inspection Agency Maintenance and Pigging ... Gas Pipelines Repair, ...
Construction of 01 No. Inlet Tank Providing laying and Fitting of HDPE Pipe for Shifting of Alignment in Gravity main from Source to Kathogra and Saras, Damage due to road Construction of PMGSY Road from Dranga to Hud Saras under Deposit Contribut
Permanent Restoration of Water Supply Schemes of PHE Sub Division Doda West (Improvement and Augmentation of WSS for Lower Areas of Doda Town) Providing and Laying of D.I. Pipe in Gravity Main RD 0 to RD 10000Mtrs, Providing of Chain link fencing ar
Construction of 01 No. Storage Tank, 08 No. Anchor Blocks, 100 No. Thrust Blocks, Steel Rope crossing, Protection Work and Laying Fitting of GI/HDPE Pipes in Gravity main, Sub main and Distribution Systems of Water Supply Scheme Koti Basti under JJM
Permanent Restoration of Water supply Schemes of PHE Sub Division Doda West (Improvement and Augmentation of WSS for Lower Areas of Doda Town) Providing and Laying of GI/DI/HDPE Pipe in Gravity Main RD 10000 to 02 Nos. GSRs (Sericulture/Agriculture),
Construction of 4 No 20000 Gln GSR/Sump Tank, Construction of 1 No 10000 Gln GSR, 2 Nos Pump Room, 02 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Dhanore Loharan (JJM).
Construction of 4 No 20000 Gln GSR/Sump Tank, Construction of 2 No 10000 Gln GSR , 3 Nos Pump Room, 03 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Dhanore Dhindian (JJM).
Construction of 01 No 20000 Gln GSR/Sump Tank, Construction of 05 Nos. 10000 Gln GSR, 04 Nos Pump Room, 01 No. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Dodasan Remote (JJM).
Construction of 1 No 10,000 Gln GSR/Sump Tank, 2 No 15,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Bali Bhawan (JJM).
Construction of 1 No 10,000 Gln GSR/Sump Tank, 1 No 15,000 Gln GSR/Sump Tank, 1 No Pump Room, 180 mtr b/wall, Laying and Fitting Rising Main and Distribution system under WSS Thathi Chakli (JJM).
Providing /Laying 100 mm dia flanged Rising Main , construction of side drain, Dressing/ Leveling of Ground around Filtration Plant, Rasing Valves Clear Water Chamber, repairs to electric/ mechanical work of filtration plant and R.C.C Jacketing to ol
Construction of 1 No 10,000 Gln GSR/Sump Tank, 1 No 15,000 Gln GSR/Sump Tank, 1 No Pump Room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Pichli Dhar (JJM).
Construction of 2 No 5000 Gln GSR, 5 No 10000 Gln GSR/Sump Tank 4 No 20000 Gln GSR, 3 No Pump Room and 540mtr Boundary Wall, Rising Main and Distribution system under WSS Changi Kangrial (JJM).
Development of JDA housing colony at Gole Gujral by way of providing and laying of water supply providing under DC works 1 Providing and laying of rising main and Distribution system. 2 Construction of pump room building
Construction of 3 No 5000 Gln GSR, 5 No 10000 Gln GSR/Sump Tank, 2 No 20000 Gln GSR, 3 No Pump Room and 900mtr Boundary Wall, Rising Main and Distribution system under WSS Lower Kangri (JJM).
Construction of 1 No 5000 Gln GSR/Sump Tank, 2 No 10000 Gln GSR/Sump Tank, 1 No Pump Room, 360mtr boundary wall Laying and Fitting Rising Main and Distribution system under WSS Mangla Devi-B (JJM).