Loading…
Loading…
2,750 results • Best match
Construction of 2 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR ,01 No. collection tank , 4 Nos. spring cover ,01 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Drari (JJM).
Construction of 3 No 20000 Gln GSR, Construction of 3 No 10000 Gln GSR ,2 Nos Pump Room, 2 Nos. spring cover ,02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Lower Sawani (JJM).
Construction of 8 No 20000 Gln GSR, Construction of 2 No 10000 Gln GSR ,03 Nos Pump Room, 03 No. compound wall, 01 No. protection work , Spring cover 13 Nos. Laying and Fitting Rising Main and Distribution system under WSS Ghambir Mughlan (JJM).
Construction of 4 No 20000 Gln GSR ,Construction of 2 No 5000 Gln GSR, ,2 Nos Pump Room, 02 No. spring cover . 02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Loorkote (JJM).
REPAIR / MAINT OF WATER SUPPLY LINES INCL RISING MAIN, PIPE LINES, VALVES, VALVE CHAMBERS INCL REPAIR/MAINT OF PUMPS, STARTERS, CLEANING UG SUMPS and OHTS AND REPAIR/ MAINT OF INTERNAL ELECTRIFICATION WORKS AT OTM ACCN AND ALL ADM BLDGS OF JAKLI RC
Construction of 10000 Glns GSRs 03 Nos, 5000 Gln 02 Nos, Const of pump room 04 nos., Const. Spring cover 02 No, Const. of Valve pits 10 Nos, Providing and instalation of clorinator. Laying and fitting of rising main WSS Jattan Kathyari
Construction of 10000 Glns GSRs 01 Nos, 5000 Gln 04 Nos, Const of pump room 01 nos, Const. Spring cover 05 No, Const. of Valve pits 10 Nos Laying and fitting of rising main and distributiion net work for WSS Chambra Saiklu
Construction of 2 No 10,000 Gln GSR/Sump Tank, 2 No 20,000 Gln GSR/Sump Tank, 1 No 30,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Metka (JJM).
Const. of Thrust block/ Anchor pillars at different spots along intake main retaining wall/Protctn Wall 03 No Lava. Block inclu. balance work of Machine Cum Operators Room, CL fencing and providing L/F of rising main for WSS Trumbgund Renji (NABARD)
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 4 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR , 5 Nos Pump Room, 05 No. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Margan (JJM).
Construction of 4 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR ,3 Nos Pump Room, 3 Nos. spring cover ,03 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Patrara (JJM)
Laying and fitting of 400mm dia D.I Rising Main SS/ Double restrained color joints from off take point at Narayan Bagh (Sindh Nallah) Shadipora upto proposed site for Const of 2.0 MGD RSFP at Devar near SSM college. WSS Regional Pharihaspora under NR
REPAIR/ MAINT OF CI/ GI PIPE LINE CONTROL VALVES CLEANING/ PAINTING OF OVERHEAD TANKS CHLORINATION PLANTS AND CONNECTED WORKS AT MIRAN SAHIB UNDER GE JAMMU
Supply, Installation, Testing and Commissioning of 8x8 Oxygen Cylinder Manifold along with control Panel and Dedicated Oxygen pipe Line for Operation Theatres at GMC Baramulla
Upgradation of Pipe Line from the house of Majid Lone to fourway crossing Naseerabad Sopore(House of Gh. Nabi Sofi) District Capex Budget 2024-2025
Relocation for Fire Fighting and STP ETP Pipe line Network with allied works to be carried out at 500 Bedded Govt Children Hospital Bemina Srinagar
Laying Fitting of G I pipe line from house of Khalimullah upto the house of Qudratullah at Salman e farsi Colony Ishber for WSS Ishber
Shifting of pipe line damaged by PMGSY department due to construction of road from Tunnel Pati, Ganiwan to Gich Khudan for WSS Bijad Pati Sonadab
REPAIR/REPLACEMENT OF ELECT WIRING/FITTING AND FIXTURES AND GI PIPE LINE, PUMPS, MOTOR AND ALLIED WORKS AT BARAMULLA AND PATTAN UNDER GE 969 EWS
Laying of water supply pipe line (Gravity line) from source to Glass Clad Cafeteria and Construction of water Tank at Glass Clad Cafeteria Nathatop, Ramban
Upgradation/Strengthening of Chewa Chankitar Machama Road by way of shifting of pipe line coming in the alignment. (Deposite contribution under 5054 NABARD RIDF XXVII)
Repairment of Slow Sand Filtration Plant at Kralkhani and Ninihama during repairment of pipelines at Hayan Palpora under PRI Grants.
Restoration of Water Supply Scheme Lancha Hariwala including providing and laying of Pipe and protection work in Block Thuroo and Restoration of WSS Pasera Wali Chamba in Block Thuroo under SASCI.
PLEASE REFER TO BOQ
Construction of 02 Nos. 10000 Glns GSR, 5 Nos. Chain Link fencing, 01 No. Boundary wall and pipe laying and allied works under WSS Penthi Samlah (JJM)
Embedding of 25mm dia pipeline at Ahangar Mohalla Rawalpora.
Realignment of pipeline at Pasto Chaq Saidapora WSS Saidapora
MAINTENANCE REPAIR AND REPLACEMENT OF VARIOUS SIZE OF GI PIPE LINE PVC TANK SLUICE VALVE GATE VALVE AND ALLIED WORKS FOR MARRIED ACCOMMODATION AND LOWER CAMP AREA AF STATION UDHAMPUR
SPECIAL REPAIR REPLACEMENT IMPROVEMENT TO CI DI GI PIPE LINE WITH ALLIED CONNECTED WORKS AND PROVN OF AIR CONDITIONING AT MIL STN SAMBA
8625/E8-SPECIAL REPAIRS TO RAISING PIPE LINE AND CONNECTED WORKS FROM AJAY BAUGH PUMP HOUSE TO SRINAGAR OVER HEAD TANK UNDER GE MINNIEBAY, SRI VIJAYA PURAM
Providing and Laying of 40/25/20 mm dia GI water supply pipe line at Manzpora and Ganai pora Khimber for WSS Khimber CDF 2026-27
Providing of water facilities by way of laying/fitting of G.I. Pipe line for Hassan Abad Shanglipora and Guzurbal for WSS Shunglipora Palpora (UPD/CAPEX REG.)
Providing Water Supply Pipe Line from Existing Sump near Jawan Barrack of SHQ to Sump near Communication Complex of 134 Bn BSF under SHQ BSF Sunderbani
Special Repair/Replacement of corroded DI/CI/GI Pipe line and provn of GI wire along with LA in certain different locations under GE (Utilities) Udhampur.
Shifting of pipe line for the construction of road and drain Gujral Chowk to Hanjana bridge via Chirst School Nowshera under WSS Nowshera Town. (Deposit work)
Maintenance/Repair/Upgradation / Providing And Fitting Of Pipe Line, Hydrant/ Irrigation Equipments, Motor/ Pump, Fountain System And Allied Works (For the Year 2020-21). Part-I)
RESTORATION OF DAMAGED PIPE LINE UNDER WATER SUPPLY SCHEMES DEVIGARH SUKHALGATHI BY PMGSY DEPARTMENT ON CONST. OF GRAN TO SUKHALGHATI ROAD UNDER PACKAGE NO. JK14-544
Repair/Replacement pipe line, control valves, sluice valves and connected works at Tawi, Old MH Area, 37 AMSD area and Mukherjee Enclave under GE Utilities Udhampur
Gund Gul Sheikh Khul-Construction / Providing/Laying of MS Pipe line 150mm dia from RD 0.00 mtr to RD 1220.00mtr for a length of 1220.00 RM
REPLACEMENT OF OLD VINTAGE CI/GI PIPELINE INTO DI/GI PIPELINE AND ALLIED WORKS AT CTS AND USMAAN VIHAR AREA UNDER GE SOUTH AKHNOOR
BRAKE SHOE REVITTING, FUEL PIPE LINE SOLDERING, FUEL PIPE LINE NO 1, FUEL PIPE LINE NO 2, FUEL PIPE LINE NO 4
Laying and fitting of GI pipe 100 mm dia, 80 mm dia, 65 mm dia, 50 mm dia,40 mm dia , 32 mm dia and 25 mm Rising Main and distribution system from base stage to 1.00 lac Gln GSR under WSS Mendhar-II Languishing
L/F of 80mm dia GI Rising main from Spring to Sump and Pump house to SR, Construction of Chain Link fencing around various structures, Constt of protection works of springs near Pump house and waterkhani SAR and outside sluice chamber etc WSS Water
Laying and fitting of GI pipe 80 mm dia, 65 mm dia,50 mm dia,40 mm dia ,32 mm dia 25 mm dia, 20mm dia 15 mm dia Rising Main and distribution system at Top stage Mohalla Pattan under WSS Gakhran Gunthal NABARD
Construction of 2 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, 2 Nos Pump Room, 02 Nos. Compound wall, Fencing and sign board,01 No. protection work, Laying and Fitting Rising Main and Distribution system under WSS Badhoon-A (JJM).
Construction of 6 No 20000 Gln GSR/Sump Tank, Construction of 4 No 10000 Gln GSR, Construction of 2 Nos Pump Room, 11 No collection tanks, 11 no spring covers, 2 No Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Panga
Construction of 4 Nos 20000 Gln GSR/Sump Tank, Construction of 1 No 10000 Gln GSR, 01 No. Collection Tank, 3 Nos Pump Room,02 No. Spring cover 03 Nos. Compound wall, 01 No. Protection work Laying and Fitting Rising Main and Distribution system under
Construction of 5 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR ,2 Nos Pump Room, 4 Nos. 2000 glns collection tank , 5 Nos. spring cover ,02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under
Construction of 1 No 20000 Gln GSR ,Construction of 3 No 10000 Gln GSR, ,2 Nos Pump Room, 5 Nos. collection tank , 5 Nos. spring cover ,02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Dh