Loading…
Loading…
3,832 results • Best match
Repairing of 8 dia MS pipe line of fourth range at sump no. 03 at Jehlitand under KDH OCP, NK Area.
TAKING OUT BROKEN PIPE LINE ALONGWITH DAMAGE SUBMERSIBLE PUMP AND REPAIR SUBMERSIBLE PUMP AND ALLIED WORKS AT KHOJATOLI UNDER GE RANCHI
REPAIRING OF WATER TANKER COMPARTMENTAL DUMP BODY WITH PIPE LINE OF WATER SPRINKLER SL. NO. 443 OF AMP COLLIERY BARORA AREA.
Repair and maintenance of sewerage pipe line, manhole, gully chamber at C type sec VII for 120 quarters in koyla nagar
Repair of Scrap Cabin Pipe Line Rep, Plantation, Hoeing Mulching and Bamboo shed for 14 no. ABOCP Under Block II Area.
Repair and replacement of old damaged pipe line from Asnapani G.M. Bunglow turning to Maszid Mohalla, Asnapani under G.M,Unit Kathara
Construction and laying of Hume pipe line near the culvert at entry gate and providing parapet with R.C.C work at BOCP.
Day to day maintenance of water supply main branch for different G.I/C.I. pipe line at Moonidih Township under WJ Area
Repair and Maintenance of water supply pipe line at Gandhi Gram near JRD seam, Under Sawang Govindpur Ph-II, Kathara Area.
Dismantling of 8 inch/10 Inch dia MS pipe line related things with pump motor at 9 seem under ABOCP Mine
Rotation of damaged 10 inch dia thickener bleeding pipe line from the thickener to pond no. 5 of Moonidih Coal Washery.
Day to day maintenance of water supply main branch for different G.I/C.I. pipe line at Moonidih Township under WJ Area
Erection of 1000Mtr, 6 inch Dia GI pipe line for Suction and delivery of 1000GPM Pump installed at Sayal-D OCP.
Day to day maintenance of water supply main branch for different G.I/C.I. pipe line at Moonidih Township under WJ Area
Day to day maintenance of water supply main branch for different G.I/C.I. pipe line at Moonidih Township under WJ Area.
Shifting at 2000GPM pump along with 8in dia M.S. Pipe line in 9 seam of ABOCP Mine under Block-II Area
Repairing of bleeding pipe line and its support structure from thickener area to slurry pond no.4 of Moonidih Coal washery.
WORK OF DISTRIBUTION AND CONNECTION PIPE LINE WITH FITTING AND ELECTRIC MOTOR PUMP IN TOILET ETC. GROUP NO. WATER ARRANGEMENT 02
Installation of pipe line and pump at 9 seam special for arresting discharge of water at coal face of 1T patch
WORK OF DISTRIBUTION AND CONNECTION PIPE LINE WITH FITTING AND ELECTRIC MOTOR PUMP IN TOILET ETC. GROUP NO. WATER ARRANGEMENT 03
Laying of 4 dia delivery pipe line at 7 8 incline using old pipes kept under Dhori (K), Dhori Area CCL.
Pipe line work at Basdiha from Bore well near Middle school to Masjid Gali (Shakil Mohalla- JB. No.- 4,40,55 and 69)
WORK OF DISTRIBUTION AND CONNECTION PIPE LINE WITH FITTING AND ELECTRIC MOTOR PUMP IN TOILET ETC. GROUP NO. WATER ARRANGEMENT 01
Re-assembling of pipe line damaged by hydraulic shovel at Kessurgarh siding connected to C-patch delivery range under ABOCP mine
Laying , Jointing of 6 Inch MS Pipe Line from Victory Colliery to Victory Colony for Domestic Water Supply at Bastacolla Colliery.
Running repair and maintenance of water distribution pipe line and sanitation work for colony quarters and offices at DVC Konar Dam.
Repairing of Water tank and Pipe Line of quarter Awadesh Yadav, Quarter situated at Jealgora near JLN Stadium Under Lodna Area
Day to day repair and maintenance work in domestic water supply pipe line at Gidi A (For period of two years).
Detailed Estimate For Installation of Medical Gas Pipe Line System With Compressor in Sadar Hospital Gumla For The Year 2026-27
Laying and erection of 100mm dia MS/GI pipe line for dewatering of mine water at Sarubera Colliery under kuju Area.
Repairing of pipe line and replacement of valve and bib cock of CCL Hospital Beniadih of Giridih Project of Dhori Area.
Installation of pipe line and 2000 GPM (MnP) dewatering of mine water of 9 seam face ABOCP mine Block-II Area
Drinking pipe line of PVC Pipe from Bararee More to near Hathi Talab Colony and Doctors Colony Jealgora under Lodna Area
Day to day maintenance of water supply main branch for different G.I/C.I. pipe line at Moonidih Township under WJ Area.
Installation pipe line shifting, breakdown rectification and other pumping related work at 1T patch of ABOCP mine under Block-II Area.
REPAIR OF WATER SUPPLY PIPE LINE CONTROL VALVES INCLUDING CONNECTED WORKS AT SRC AND MES MD AREA UNDER GE RAMGARH CANTT
Construction of New Sewerage line, Effluent treatment pipe line, septic tanks, Inspection chamber, Drain and Rain water harvesting etc under CHD.
Providing, fitting and fixing GI pipe line back side of Coal depot to back side of work shop at Rajpura OCP.
Repairing of water spraying pipe line and leaked water tank of WS28-II water tanker sl no-28002 of dakra project.
Day to day maintenance of water supply main branch for different G.I/C.I. pipe line at Moonidih Township under WJ Area.
Reorganisation of 6 inch dia pipeline
Supply and fixing of pipeline spares.
Strengthening of Source by Construction of Intakewell, Gangway supplying and Laying Raw Water Rising main from Konar River to Existing WTP for Gomia Rural Water Supply scheme under D.W.and S. Division Tenughat for the year 2023-24
Estimate for construction of 1 nos of HYDT installation of 1 numbers of 2HP submersible electric motor pump cable rising main 1 nos of protection chamber etc at mukhyamantri utkrist vidhyalay sahebganj Kasturba Gandhi School Saraikela unde
Reorganization of 2nd range 8 inch dia pipe line of CRE sump for dewatering purpose through 2000 GPM pump motor set in respect of AKKOCP, BnK Area
Changing of damaged pipe line at back side of Bastacolla Area Office under Bastacolla Area.
Dismantling, repair, fabrication and erection of 8 inch dia M.S pipe line and dismantling and fitting of flange 8 inch and valve 8 inch at coal stock heap no. 12 with extension of G.I pipe line 6 inch dia with fitting of 6 inch sluice valve and conne
Leakage repair in 1st delivery range of 10in/8in dia pipe line by replacing of rusted/damaged 10in/8in dia pipe line for D/L. face 9 seam section to O.S. cutting area and installation of 4000GPM pump at 9 seam of ABOCP Mine under Block-II Area
Different types of pumping and pipe line work fire quenching work at 3rd patch erection extension of 8 inch 10 inch dia MS pipe line from MOCP pump to khodo river erection of 8 inch 6inch dia MS pipe near Barora check post shifting of 4000 GPM pump m
Leakage repairing of under ground inch domestic water supply pipe line as well as fabrication of 01 no Head End at Baludenga domestic water supply station for tanker filling re installation of pully over old shaft structure, GRD Project.