Loading…
Loading…
3,833 results • Best match
Repair of damaged Pipe of Karkatta Pipeline under GM Unit, NK Area.
Repairing of pipeline at loyabad cokeplant colony near dam under sijua area
Repairing work for main pipeline near Nehru chowk under Block II Area
Pipeline work from Ghurjor to Sirpuria under Madanpur Panchayat, Block-Nirsa, Dhanbad
Diversion of Pit water from Gopalichak Pit to Pond by Providing Pipeline
Replacement of rusted pipeline at Railway siding colony Tarmi Under Dhori Area
Carrying out coating surveys for Paradip Raipur Ranchi Pipeline (GR C - Jharkhand)
Maintenance of pipeline of canteen situated at Nichitpur colliery under Sijua area
repairing and maintenance of water supply pipeline BnK Area Jrd Rly siding
For Installation 2 inch GI pipeline from 3.15MVA 6.6KV/11KV and 7.5MVA 6.6KV/11KV Transformers to oil soak pit at SBRS Sijua Area
Diversion of 8 inch dia pipeline at 6 no. bottom for dewatering purpose due to lowering of face w.r.t. AADOCM of Dhori Area
Rep. and fitting of water spraying pipe line and new valve changing of Water Sprinkler denting of platform, railing with changing of material of WS-28005 of GVP Ph-II,KTA
Installation of 1H.P Submerciable pump mortar and laying of 1inch G.I and PVC pipe line and Drilling 4/5 inch dia 10 nos Borewell at different places in Urjanagar colony.
Dismantling of 6 inch, 8 inch and 4 inch dia pipeline two range inactive pipeline from Sump No. 01 to Sump No. 05 in respect of Rohini Project, NK Area
Dismantling of 6inch and 8inch pipeline of main sump and old quarry and erection of 6inch pipeline in main sump and 1inch pipe for crusher at TSOCP under Hazaribagh area.
For Jointing of C.I Pipe with MS Pipe for Supply of Water to Township and MT Hostel Near Area Office, TMC Under Sijua Area
Water supply pipeline at coal dump near 2 seam NAKC and 1 nos. foundation for light pole at Departmental OCP under NAKC Govindpur Area
Laying of 3 Nos. of 10 inch dia pipeline of approx. 900 Mtr. Length (Each) and laying of 1 No. 8 inch dia pipeline of approx. 900 Mtr. from proposed Sump to the connecting Nalla of RITES and dismantling of existing 03 Nos. of pipeline of 900 Mtr.
Repair Fabrication of LHS platform, hand rail, battery box, front bumper, radiator grill tank body and spraying pipelines of water Sprinkler WT6 of Ashok OCP
Annual Running and Breakdown Maintenance of Pipelines including interconnection lines and valves carrying Ash Slurry of Dredge Pump House of TPP, CPP and Boiler 9
Repairing/ Replacement of pipelines and shifting of overhead tank for water supply arrangement from Washery Main Gate to Road Sale weighbridge at Moonidih Coal Washery
Preparatory and Assisting Jobs for RLA Study of Steam Pipelines (100 ata, 39 ata and Kindling Headers) along with other high-pressure line related job.
Repairing/ Replacement of concentrate media collecting pipelines and tank from 632-3 magnetic separator at 25 mtr. Floor of Washery Building at Moonidih Coal Washery.
Custom Bid for Services - conducting Safety Audit of ERPL Pipelines Installations in line with Rule no 10 of MSIHC Rules 1989 as per IS 144892018
Dismantling of 2000 GPM as well as 1000 GPM pump motor set at Karipani sump and loading and transporting it to patch A, B, Tarmi OCP respectively and then installing it with laying and fitting of 8 inch, 6 inch dia pipeline for dewatering
Extension of pipeline 6 inch dia pipe and installation of 1000 GPM pump in sump no-01 in respect of Rohini Project
Maint of 300mm 12 inch dia C I pipe line from Lagoon pump house to fresh water pond for Industrial water supply at Madhuban coal Washery under Block II Area BCCL
Day to day 6 inch and 8 inch dia pipe line work for six month FY-2024-25 for de-watering of different sumps of GVP Ph-II OCP (Monsoon Preparation)
Repairing of leakage in 10/8 inch dia rusted/damaged M.S. Pipe line and installed of 4000 GPM pump set at dragline coal face sump of ABOCP Mine, Block-II Area
Dismantling, loading transporting laying of 6 inch dia pipe line and 1000GPM pump motor shifting installation at Patch A(East side ) and Patch A (West side) for dewatering at Tarmi OCP
Shifting of pump-motor set, assembling of box pontoon its pipe line shifting diversion and extension of delivery range as per new position at Deco purba coal face of ABOCP mine
Repair, replacement, fabrication and laying of 6 inch dia GI pipe line including dismantling and fitting of valve at water column and different places in Raw Coal Section of Kathara Washery
Supply and fitting 8 inch sluice valve, strengthening of damage steel Bed structure of RKB pump, Suction side pipe line accessories fabrication of DSM 4 pump at Kabribad Mine, GRD Project
02times marching of 4000GPM Pump motor set of Jarlahi sump and maintenance of the above pump along with diversion of its pipe line due to mining activity at Phularitand, AMP Colliery
Transporting and installation of one set of pontoon with 4000GPM pump motor set from feeder breaker to main water sump and erection of its pipe line at Phularitand under AMP Colliery
Different type of pumping and pipe line works in departmental (dragline) coal face, during monsoon season, shifting installation of 3200 GPM/4000 GPM pumps of ABOCP Mine under Block-II Area
Laying of 300 mtr of 4 inch dia MS pipe line used to water supply from 42 No. mine to water filter plant 42 No. colony at Tapin NOCP , Hazaribagh Area
Different type of work i.e. Pump shifting, pipe line shifting and leakege repairing etc at Dragline Coal face to Box Cut-II outsourcing cutting zone of ABOCP mine Block II Area
Providing and Laying Ductile Iron pipe line from Water Treatment Plant, Gourkhuti to Over Head tank near Bhowra High School via Korhia Patti,23/8 Incline of Bhowra under EJ Area.
Supply and laying of 2IN, 1.5IN and 1IN dia G.I. pipe line delivery at 4 / 5 6 incline for water spraying at coal faces at new panal of Dhori Khas Colliery.
Repairing miscellaneous work related to pump shifting and pipe line shifting leakage repairing at Deco coal face to Box cut-III (AMPL out sourcing face) under ABOCP mine Block-II Area
Shifting of 4000gpm pump motor set of purba face sump due to increase of water level and maintenance of the above 4000gpm pump and its pipe line of Muraidih AMP Colliery
Installation of new 6UP4, 1000GPM 100 Mtr Head Pump set, pipe line 6 inch diversion, replacement foot valve and making of bed plate for water filtter plant sudamdih under ASP Colliery
Laying and fixing of 6 inch and 8 inch dia pipe line for installation of three pumps at new pumping station at Sump 01 in respect of Rohini Project, NK Area
Replacement and repairing of fire fighting delivery pipe line size dia 6 inch 12 inch back side of PS-8 building section at Madhuban Coal Washery under Block-II Area, BCCL.
DIVERSION OF 8inch DIA M.S PIPE LINE 800 MTR. FROM VERTICAL OF OCP PUMP TO KUMARI JORE IN NEW WAY FOR DEWATERING OF MINE AT W.M.C,OCP AKWMC,UNDER KATRAS AREA
2INCH DIA DOMESTIC WATER SUPPLY PIPE LINE DAMGED PORTION CHANGING 140 FIT AT KCC NEAR 6 PIT COLONEY AFTER PIPE DISMANTLING AND BRINGING FROM OLD AREA IV OFFICE UNDER KATRA AREA
Brick masonary chamber with man hole cover for sulice valve n wheel valves in the alignment of pipe line along the sprinkler of New Kuju Siding under Topa Project, Kuju Area.
Lowering of 4000GPM pump motor set of ground level due to decreasing of water level at Jarlahi coal face along with diversion of its pipe line at Phularitand under AMP Colliery.
Construction of Pump House, Deep Boring and Laying D.I. Pipe From Existing Pipe Line to pump House at Dak Bangla at ward no 07 under Chakulia Nagar Panchayat, East Singhbhum, Jharkhand