Loading…
Loading…
3,835 results • Best match
Provision of pipeline and other allied works for sprinkling system at Chainpur Siding under Kedla Washery of Hazaribagh Area
Dismantling and laying of 4 inch dia GI/MS pipeline in fire prone patch of SDOCM project, Dhori area.
LAYING OF PE PIPELINE NETWORK INCLUDING ASSOCIATED WORKS FOR JAMSHEDPUR GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
Work of leakage repair in 16 inch dia pipeline from JWTP to Harina Boosting under JWTP Block II area
Laying and dismantling of 170 Metre pipeline having dia 6 inch (150mm) at Hathidari incline underground of Bhurkunda Project.
Provision of water supply through pipeline in Bodiya Basti under CSR Scheme 2021-22 of CCL at Kathara Area
LAYING OF PE PIPELINE NETWORK INCLUDING ASSOCIATED WORKS FOR JAMSHEDPUR GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
Urgent repair of pipeline works beneath the patratu Jindal Railway line crossing under Sayal-D Project, Barka-Sayal Area.
Providing and Laying PVC Pipeline from Main road Srinagar to Upper dhaura Srinagar in Putki Colliery under PB Area
Provision of pipeline system with switch room for firefighting at East patch under Sayal D Project, Barka-Sayal Area.
Installation of Motor Pump, Provision of Water Tank and Pipeline at Chadra Dhawra Village under Dakra Project, NK Area.
Extension of existing pipeline from upper sump to proposed Sump at Dakra Coal face under Dakra Project, NK Area
Dismantling laying and repair /maint of 6 inch dia pipeline for Karipani Colony water supply in r/o SDOCM
LAYING OF PE PIPELINE NETWORK INCLUDING ASSOCIATED WORKS FOR RANCHI GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC).
Shifting of 8in dia pipeline and installation of 2000GPM pump at 9 seam under ABOCP Mine Block-II Area
Repairing and relaying of slurry flow pipeline between Pond no. 5-B and 5-C at Moonidih Coal Washery.
Provision of Pipeline and water tank for drinking water at Harizan Tola, Mohan Nagar under Dakra Project, NK Area.
Leakage repairing in 10inch dia pipeline from JWTP to Bhimkenali and other miscellaneous work under JWTP, Block-II Area
LAYING OF PE PIPELINE NETWORK INCLUDING ASSOCIATED WORKS FOR RANCHI GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
Cleaning/ P/L of PVC pipeline in New Marine and IN chandra colony in Gopalichak Colliery under PB Area
Repair and Maintenance of Old Damaged pipeline of Hazari Basti Behind Type II colony Under Sawang Washery, Kathara Area
Renovation at pipeline jointing arrangement Providing M.S.Flange at Deco Coal Face water dewatering ABOCP Mine under Block II Area
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER JAMSHEDPUR GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
Dismantling laying and repair /maint of 6 inch dia pipeline for Karipani Colony water supply in r/o SDOCM
Dismantling, erection and laying of 100mm dia GI Pipeline for water tanker point at Karma Project under Kuju Area..
Repair and maintenance of water supply pipeline from Mudiyan shop to 14 no. attendance point Under Block II Area
Laying of 200mm and 150mm diameter pipeline before upcoming monsoon for mine dewatering at Potanga Quarry under Urimari OCP.
Replacement of damaged/rusted G.I. pipe and repair of G. I. Pipeline at Central colony under CCD, Dhori area
Repairing revival of dust suppression pipeline along 401 belt conveyor at Madhuban Coal Washery under Block II Area BCCL
Cleaning of Railway track Drain and Repairing of pipeline at Burragarh Siding for 6 Six months under Bastacolla Area
Repairing/ Changing of damaged slurry flow pipeline connecting pond no. 6 to pond no. 7 at Moonidih Coal Washery.
For Diversion and Shifting of 10 inch dia. Pipeline which includes dismantling of 900 mtr. And re-joining including extension) of 980 mtr. by diverted route due to cutting area of NOCP because of extension of NOCP under Sijua Area.
Repairing/ strengthening and Replacement of damaged discharge pipelines meant for supply of settled/ decanted water from slurry pond no. 4 to pond 5-A including its valves, bends, flanges etc. at Moonidih Coal Washery.
Dismantling and laying of 10 inch and 8 inch pipelines for installation/re-location of pumps to new location at Patch A pump house for smooth and fast dewatering under Ask OCP, PPR Area.
Repairing, maintenance and replacement of damaged/leakages/rusted and old pipe at different section of pipelines in line with pump installed at BKB old sump and quarry 2 sump under Ashok project, PPR Area.
Repairing / Strengthening of delivery pipelines, base frames of sump pumps and motors along with replacement of 2 nos. sump pumps and their motor under the tunnel of unit 501-B at Moonidih Coal Washery.
Laying of 8 inch6 inch 4 inch MS GI pipe as well as Installation of pump with fabrication of required suction, delivery pipe line accessories, providing and fitting required NRV Suice valve 6 inch at different three sumps at kabribad Mine
A. Dismantling of old pipeline at main sump along with re-organisation of pipes for dewatering of mines (BOQ 1-17) B. Re-organization of pipeline along the new haul road towards CREW main sump (BOQ 18-28) wrt konar ex. OCP under BnK Area.
(A) erection of a 10inch dia MS pipeline (5th range) from Jarlahi sump to viewpoint Nalla and (B) shifting of 4000GPM pump motor set from ground level to a drum pontoon and diversion of its pipeline due to extraction of coal of Jarlahi patch, AMPC.
Laying , Fitting and commissioning of a) two range of 6 in (ID-150mm) and 8 in (ID-200mm) dia pipeline and b) one range mixed type of 10 in (ID-250mm) and 8 in (ID-200mm) dia pipeline under Karo-I OCP, BnK Area
Dismantling, cutting and laying of 8 inch dia M.S. Pipeline needed for diversion of the delivery pipeline of the two nos. of 2000 G.P.M. Pump Motor Sets, in the A Patch in Mine for developement of Haul road w.r.t. Karo OCP, under BnK Area
Work of pipeline for making an arrangement of pipeline around the periphery of Coal Stock No. 01, making branches to the top of Coal Stock No. 01 necessary for firefighting purpose and extension of delivery range from Sarna Patch at Q. 01, PND OCP
Dismantling/ laying of 6 inch /4 inch dia GI/MS pipeline from new water lagged area behind S K Unit road weighbridge to fire prone Jhama patch and diversion of existing 6 inch/4 inch dia GI/MS pipeline near Karipani coal stock under SDOCM.
Custom Bid for Services - A Diversion of 14dia MS pipe of RKB 25046 DK pump at kaveri view point of Deep mine to intermediate pipeline B Installation of 02 Nos Flygt pump set along with erection of 6dia pipeline and making arrangement for water filli..
Dismantling / Replacement of Feed chute of unit 616-1 and 616-2 and its discharge chute unit 619-1 and 619-2 with allied pipelines at 18M floor at washery building of Moonidih Coal Washery
External repair and painting work of outer facade, internal painting works of common area including stairs, replacement of damaged toilet pipelines and other allied works at E Type Quarters (Teachers Colony) in IIT (ISM) Dhanbad
Custom Bid for Services - Biennial Rate Contract of plant water system CW ACW system including Fire Water system along with associated valves pipelines of BTPS 1X500MW Similar Category Operation And Maintenance Of Water Supply Systems
Repair of 03 Nos. of 10 inch 250 mm audco valve and 03 Nos. of 6 inch/150 mm for audco valve for delivery of 236 pipe line and for bypass controlling of diluted media delivery line in HMS Section of Kathara Washery.
Transporting and installation 2000gpm pump motor set on ground level of Jarlahi sump along with dismantling of idle range of 8inch dia MS pipe line from main sump of Muraidih and transporting laying and jointing of 8inch dia pipe range at Jarlahi sum
Dismantling and withdrawal of HT2000GPM Pump, motor set with their baseplate, starter and its pipe line and transporting to safe place due to give free space to the HEMM for OB removal at old Ghutway patch-3 of Damoda Colliery under Barora Area.