Loading…
Loading…
3,835 results • Best match
Repairing of main Pipeline Shiv Mandir to mini complex and NHS 45/54 and 55/64 at Urjanagar colony under Rajmahal Area.
Provision of pipeline form Gidi-A Tanker point to the washing platform of the Excavation workshop under Gidi-A Colliery, Argada Area.
Laying of Delivery pipeline 600m length and 8 inch dia at quarry no 2 departmental quarry at Religara Colliery, under Argada Area.
Drilling and Commissioning of Thirteen (13) nos. deep bore well and pipeline work at different places of Urjanagar colony under Rajmahal Area.
Repairing of 50mm dia pipeline for water supply to workshop, office, canteen, HEMM Workshop and crusher of Karma OCP under Kuju Area.
Repairing of main Pipeline of Ashok Vihar Colony and some misc. work at Project Office Q-01 under Purnadih Project, NK Area.
Repairing, Fabrication/erection of slurry tank liner plate change and discharge pipeline change/repair etc. in Main Washing Plant at Sawang Washery.
Provision of additional main pipeline (80 mm dia) from Pump house to MQ Colony at Subash Nagar under Churi Project,NK Area.
Upgradation of old & dilapidated colony pipeline network, sewer line, Septic Tank & Other fittings at DTO, GHD & BRWD under Sr. DEN/1/DHN.
Upgradation of old & dilapidated colony pipeline network, sewer line, Septic Tank & Other fittings at DTO, GHD & BRWD under Sr. DEN/1/DHN.
Repairing of main damaged 4 inch dia pipelines carrying water to Feeder Breaker truck waiting point and damaged 2 inch, 1.5 inch dia pipline for sprinkling purpose in the Feeder Breaker hoppers installed at Tarmi siding of SDOCM
SPL REPAIR TO BLDG NO T-138, T-140 2, T-140 1 T-137 1 OTM AT NCO LINE AT MORABADI WORK SERVICES FOR REPLACEMENT OF DAMAGED UNSV PIPELINES AT MH AREA AT NAMKUM UNDRER GE RANCHI
Departmental estimate for the work of New making of Nipple and clamp, 6 inch 12 Nos. and coupling bolt for delivery and suction pipelines of two nos. of Pumps running in D.D. Mine of Bokaro Colliery, BnK Area.
Repairing/ Replacement of water spray system and their pipelines at different coal transfer points of belt conveyor units C-1 and C-2 and also under loading section including units 704, 901 and 903 at Moonidih Coal Washery.
Custom Bid for Services - Provision of Hume Pipe at Loading point area for storage of Materials and handling of Ore at Gua Ore Mines percentage quote based Similar Category Maintenance and Pigging Service for Oil and Gas Pipelines
(A)Diversion (Dismantling and re-joining) of 1 No. Pipeline of 10 inch and 8 inch dia pipe for shifting of 4000 GPM Pump motor set and 01 No. 2000 GPM (B) Carrying laying and joining of 2 No. delivery range of 10 inch dia pipeline of 340 Mtr. for sup
Fabrication and erection of damage and leakage pipe and 02nos 8inch dia and 6inch dia bend making in running pipeline of Pundi Project, Kuju Area.
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing and associated works for Phase V Patchwork for 22 point 4 Km under DE NWO CNTx E Hazaribagh Similar Category Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network
Dismantling and laying of 6 and 4dia pipeline from, near OB dumping to fire area under r/o SDOCM Project, Dhori Area
Erection of 8 inch, 6 inch dia and 4 inch dia pipe line of firefighting from 6 no sump to active fire point in view of engaging of shovel and road making for coal production for a period of 90 days wrt AADOCM of Dhori Area.
Installation of 6 inch dia. MS pipe line for new installation of 2000 GPM pump and motor at 4A patch Bhowra South Colliery for rapid dewatering at the same place due to heavy rain fall at respective site of 4A patch. Length of pipe 630 meter.
Lowering /shifting ( multiple time ) due to decreasing quarry water of 3 Nos 4000 GPM Pump motor set 12 time with delivery range and placeing all 3 Nos pump set at new place due to dry of quarry which includes dismantling pipe line of 10 inch 450
Const of water supply in Central Jail Giridih with 2 Nos 2HP Submersible MOTOR pump set 5 Nos. Syntax Water Tank Rising and Distribution Pipe line Etc complete job and 2 NOs.-200 mm X 165 mm X 185 Mtr deep HYDT under DWS DIV 2 Giridih
Replacing of BD turbine pump motor set by 1000 gpm pump motor set at the pond near SOCP substation and replacing of BD 4000gpm pump motor set by another 4000gpm pump motor set at 3rd patch and leakage repairing in 6inch dia domestic pipe line and 8in
(a) Making an arrangement to deal with spontaneous heating of coal stock No. 42 an 47 (b) Laying one range of pipe line from the sump of departmental working area to the departmental coal stock (c) Re-arrangement of part of 290 Meter..... at Ashok OC
(1) Assembling of MnP 2000GPM 150 Miter head pump (ii) Fabrication of bed fram 4000GPM pump Motor (iii) Extention of 8/10in dia pipe line (iv) Placement of 4000 and 2000 GPM pump motor set due to extraction of Floor coal can be done smooth operati
Shifting of 2000GPM and 4000GPM pump in the lower side of the coal face sump along with diversion of its 10in/8in dia delivery pipe line from D/L coal face sump to Box cut-III O.S.cutting area sump of ABOCP Mine under Block-II Area
PART-A shifting of two number pumps of 1000 GPM, Make - kirloskar oil engines Itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s
Erection of 10inch dia MS pipe line 2nd range from main sump to SOCP nalla near SOCP CISF checkpost for fast discharging of mine water and installation of 4000gpm pump motor set on the ground level of main sump of SOCP patch under Muraidih AMP Collie
Dismantling of 10inch dia and 8inch dia MS pipe from SOCP old coal face range and 3rd patch old range and transporting of SOCP attendance room premises for necessary repairing and erection of one 10inch by 8inch dia MS pipe line from 4th patch sump t
Erection of 10inch 8inch MS pipe line from MOCP coal face sump to chitahi road for discharge mine water to chitahi nalla by jointing the proposed range with the existing delivery and installation of 6point 6 KV 4000 GPM pump on the ground level of MO
Laying of 2 inch, 2.5 inch, 1 inch dia G.I pipe line for spraying water on road to suppress flying dust from fresh water pump to slurry loading yard through road sale weigh bridge and along raw coal hopper with essential valves and spraying points of
Lowering /shifting (multiple times) due to decreasing quarry water of 2 Nos.4000 GPM pump-motor set which includes dismantling pipe line of 10 inch dia 400 MS pipes short piece pipe and bend and laying and joining of 10 inch dia 500 M pipes short pi
Lowering of 02nos of HT 4000gpm pump of Muraidih Jharna sump due to decreasing of water level and diversion of 10inch by 8inch dia MS pipe line of 4000gpm pump supplying water to SOCP filter plant near view point due to safety purpose of Muraidih und
Installation and commissioning of a 4000 gpm pump motor set in 4th patch sump and erection of its pipe line from 4th patch sump to Silo nalla and installation of a turbine pump in 3rd patch sump and erection of its delivery range dewatering of mine w
Welding of flange on 6 inch dia meter pipe, transporting of pipe from surface to u/g and laying, installation and jointing of 6 inch diameter of length 300m M.S pipe line from 2 WL 2dip sump to 6EL 2 Dip of Kharkharee Colliery, under Govindpur Area
Lowering of 1 Nos. 3000 GPM Pump Motor set including diversion/dismantling of pipe line of 10 inch dia 540 Mtrs pipes short piece pipe and bend and laying and joining for the purpose of maintaining proper water supply for domestic use at colony of go
Shifting of 4000gpm pump motor set of main coal face sump 02timews and shifting of 2000gpm pump motor set of lower side sump 02times and diversion of its pipe line towards upper side sump and shifting of pontoon along with 4000gpm pump motor set of J
Dismantling and withdrawal of 02 nos of 4000GPM pump motor set from the damaged pontoon and installation on the ground level of SOCP coal face sump and shifting of 4000GPM pump of 3rd patch and diversion of its pipe line due to dumping of OB and main
Fabrication and erection of MS and GI pipe size 200 mm, 250 mm and 150 mm dia pipe line 13 mtr, 9 mtr, 4.8 mtr, 0-0 level and bend, flange fitting at different places and dismantling at Sec-I in HMS Section at Kathara Washery
Dismantling of delivery pipe line and used 6 inch dia M.S.Pipe of total length 750 Mtr(125 No. pipes) from delivery side of Golden Pahari pump along the East side of Patch above North Tisra Quarry to 25 No. Coal depot and then rejoining of 6 inch
Diversion / shifting and extension with new pipe 20 No. and 6 inch dia exiting and old dismantling 1200 Mtr. Pipe line delivery range of 1000 GPM pump set installed at D-Patch its discharge point at water supply of Golden pahari at Amal .NT-ST-JG Pro
Dismantling of 02 Nos. delivery range of 4000 GPM and 3000 GPM pump and re-organization of same delivery range to different route. Total length of pipe line is to be dismantled 10 inch dia MS pipe 340 Mtr.of Both delivery 56 Nos. pipes and r
Shifting of HT 2000 GPM Pump motor set 02 times in another side of the sump along with diversion of its 8 inch dia MS pipe line due to advancement of mining activity and other miscellaneous mechanical works at Old Ghutway Patch-3 of Damoda Colliery.
(a) Repairing of section of 4th delivery range of 150 mtr. 10 inch dia M.S pipe ( i. e 14 Nos. pipe in vertical position and 11 Nos. pipe level position ) damaged due to sliding of vertical overburden, under the pipe line of vertical range due to he
Lowering /shifting (multiple times) due to decreasing quarry water of 2 Nos. 4000 GPM pump-motor set which includes dismantling pipe line of 10 inch dia 350 M pipes short piece pipe and bend and laying and joining of 10 inch dia 500 M pipes short pi
Diversion including extension and shifting 02 Nos. 4000 GPM (2nd and 3rd) pump motor set with electrical from middle of quarry to south and east corner of quarry with 10 inch dia pipe line of B patch and Re installation at new place 4000 GPM 02
(A) Making of pumping accessories like bend, nipples etc for Golepahari pump house and Dhori East pump house (B) Erection of 250 m 4 inch dia pipe line along with a 4 inch dia tanker point (C) Fabrication of three number rest shelter in respect of AA
Carrying laying and joining 6 inch dia delivery range for 1000 GPM Pump from NT- Quarry to NT-Coal depot and matching existing pipe line Golden Pahari (Approx-1300 Mtr.) 215 Nos. 6 inch dia M.S. Pipes full lenght 15 Nos. bend /tapper and 10 Nos shor
Shifting of 02Nos. of HT 2000GPM Pump Motor set in the lower/safe side of the sump No.-01 and sump No.-02 due to decreasing of water level at old ghutway patch-3 along with erection of its 8inch dia M.S. Pipe line at Damoda Colliery.