Loading…
Loading…
3,835 results • Best match
Repair and maintenance of main pipeline and other related work near Kasturba school and Executive hostel under G.M unit,Dhori Area
Dismantling of 10in/8in dia pipeline from Jamuna face due to rusted and damaged pipes of ABOCP Mine Block-II Area
Drilling and Commissioning of 01 nos. bore well all complete fitting with pipeline and at Dakaita rehab site under Rajmahal Area.
Leakage repairing in 16in dia pipeline from Dam Park to Matigarha Filter Plant and miscellaneous work under JWTP, Block-II Area
Renovation at pipeline jointing arrangement by providing M.S Flange at DECO Coal Face water dewatering ABOCP Mine under Block-II Area
Repairing of 250 mm dia Cost iron main Pipeline of Water Supply near Rohini Colony enterance under Purnadih Project, NK Area.
Day to day Repair and maintenance work in domestic water supply pipeline at Gidi-C (for a period of two years).
Drilling and Commissioning of 01 nos. bore well all complete fitting with pipeline near Lamps of Lohandia basti under Rajmahal Area.
Shifting of all pumps in 6 no sump and along with laying of one 6 inch pipeline AADOCM under Dhori Area.
Laying of 60 No (360m) 6 inch MS Pipeline ( To Supply Domestic Water to Chandmari and Nearly Colonies) of Bastacolla Colliery.
Re-assembling of pipeline 6inch dia and 8inch dia delivery range neat high wall side at Jamunia patch of ABOCP Mines
Arrangement of water supply pipeline and temporary rest shelter at Check-post near outsourcing coal stock under Religara Project, Argada Area.
Leakage repairing of vertical delivery pipeline of Submersible pump motor set-2 at Dharmabandh Colliery 2-Pit under Govindpur Area-III
Laying of 500 meter, 08 inch diameter Pipeline in Quarry no. 06 for dewatering purpose at Religara Colliery under GM Unit.
Repairing of pipeline in respect of Sri Sunil Jha, Usman Ansari and others employees quarter at different locations of Lodna Area
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER JAMSHEDPUR GA (CITY AREA) FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC).
CONSTRUCTION OF DEEP BORING FOR PIPELINE NAL JAL NEAR MANGAL ORAON DILIP ORAON HOUSE AT AMBAWA NARAULI BLOCK- KAIRO DIST LOHARDAGA
PROVISION OF EFFLUENT TREATMENT PLANT (ETP) SLUDGE BED, SHED WORK AND DRAIN PIPELINE WORK DIVERTED TO ETP AT BOKARO LPG PLANT
Repairs to main pipeline from Intake well at Telaiya Dam to WTP/KQR and other related works for water supply system.
For Transporting, earth cutting and laying of 11 Nos. M.S Pipe 4 inch (for water sprinkling Jogta Siding Coal Dump and 03 Nos. MS pipe 4 inch (for dewatering of accumulated water by Gachh Pipe) near Jogta River at Kankanee Colliery under S
For fitting of 38 nos. of water sprinkler and laying of 2 inch and 1 inch GI pipe from 6 inch MS pipes at Railway siding Bansjora for Supration of Coal Dust of Sendra Bansjora Colliery
Dismantling of 10in/8in dia pipe line near Jamunia old OB dump due to rusted and damaged of pipes and after necessary repairing of pipes through cutting and welding, re-laying in safe and suitable route at existing site of ABOCP mine, Block-II Area
Dismantling, laying and fixing of 4 inch dia MS pipes for diversion of route of 4 inch dia MS pipe line near drill machine at Jehlitand mine to Jamun Dohar OB face to control fire for removal of OB under KDH Project, NK Area
Providing ,Laying and fixing of 100 mm dia G I pipe with welding and supply of 4inch dia G I Flange for laying and maintenance of existing pipe line from different location of colony to meet domestic water demand w.r.t konar exp ,OCP,BnK Area
Repairing and Straightening of 3.3 KV H.T. and 440 V L.T. Pipe Line (22 Nos.) along with repairing of Base Portion Clamping Welding and Fixing to avoid threat to safety at Baniahir DAV School near Shiv Mandir and Staff Colony Baniahir area of Amal. J
Dismantling and withdrawal of 2nd 4000GPM pump motor set with drum pontoon set along with its 10inch dia MS Pipe line from Jarlahi patch sump and transporting the same to the F/B for necessary repairing and keep in safe place at Phularitand, AMPC.
Different type of work i.e. 2000/4000GPM pump shifting, pipe line shifting and B.D. rectification work at D/L coal face sump and Box cut-III O/S. cutting area, B.D. 4000GPM 10UPH8 pumps dismantling and assembling after repair at RRWS of ABOCP Mine
A) Construction of rail-road gate barrier (old side) at near CPP check post under Kathara Washery B) Repairing, replacement and laying of 6 inch dia GI pipe line of pump no. 01 and DSM pump including dismantling and fitting of valve and patch repairi
RESTORATION OF DOMESTIC WATER SUPPLY TO 6 PIT GTC COLONY BY DISMANTLING OF EXITING DAMGED PIPE LINE 6 INCH DAMGED DUE TO OB SLIDING LEAKGE REPAIRING OF DAAGED PIPE AND DIVERTING TO COLONY USING BEND AT 6 PIT GTC UNDER AGKCC UNDER KATRAS AREA
Shifting of 2nos of HT 4000gpm pump at upper side of 3rd patch and main patch sump due to increasing of water level shifting of cable during marching of HEMM machine and other miscellaneous pumping and pipe line work at Muraidih under AMP Colliery
REPAIR MAINT OF GI WATER SUPPLY PIPE LINE, SLUICE VALVE NRV VALVE PIT CHAMBER AT SRC MH MDC SHO PRC MES ASC TEMPLE LANE AND LEKHA NAGAR AND REPIAR MAINT OF CENTRIFUGAL PUMP SETS SUBMERSIBLE PUMP SET PANEL STARTERS FLOCCULATOR AND CHEMICAL DOSING SYST
(1) REPLACING THE DAMAGED CGI SHEETS AT SUBSTATIONS OF ASGKCC AND LEAK REPAIRING OF PIPE LINE,KCC.(2) REPLACEMENT OF DAMAGED WINDING ROPE OF 200 HP SUBMERSIBLE PUMP BY LIFTING OF PUMP AT 2 PIT KCC,UNDER AGKCC.KATRAS AREA.(3) LOWERING AND LIFTING OF 1
Shifting of 02nos of HT 4000gpm pump at lower side of main patch middle coal sump and main patch lower sump due to decreasing of water level shifting of cable during marching of HEMM machine and other miscellaneous pumping and pipe line work at Murai
Diversion of 1st range of 10/8 inch dia pipe line from Drag line coal face sump to high wall side out sourcing cutting area due to water level increase of mine water and installation of 2000GPM pump of ABOCP Mine under Block-II Area
Dismantling and laying of 8 Inch dia MS pipe line for dewatering of Coal Face at Dept Patch and Shifting and re installation of pumps accessories after shifting work by cutting/welding as per requirement based on progression of face at Dept patch ask
PERIODICAL SERVICES TO OTM AND MD ACCN DAD LEKHA NAGAR AND REPAIRS TO WATER PROOFING SUNKEN FLOOR REPLACEMENT OF INTERNAL WATER SUPPLY PIPE LINE AND SANITARY FITTINGS IN MD ACCN AND OTM ACCN AT PRC MES TEMPLE LANE AND MINOR UNITS AT RAMGARH CANTT
Retrofitting of closed Mini WSS including Solar based Submersible DC Motor Pump and laying of HDPE Rising and Distribution Pipe Line including House Connection under D W and S D Hazaribag on TURN KEY BASI for the Year 2021-22 Deposit Head GR-FRT-02
Replacing of BD 4000gpm pump motor set of coal face sump with a 2000gpm pump motor set and diversion of its pipe line along the side of haul road due to dumping of OB on the top bench of the sump at Muraidih AMP Colliery
Earth cutting carrying laying and joining of 4 inch dia 498 Mtr. pipe line i.e. 348 Mtr.for supply of domestic water to Dom dhowra and 150 Mtr. for supply of domestic water to Laxmi Colony at Bararee Section of Amal. Joyrampur Collery under Lodna Are
Repairing of HEMM M/c. No. WS-28-2 Water Sprinkler-301 CIL No -173 and BH60M D-61063 Dumper of Jarangdih Colliery. (a) Repairing of pipe line modification of fire fighting discharge line 03 nos. valves. (b) Repairing of breakup of work for outside
Installation of 4000GPM pump on the ground level of MOCP sump and erection of 10inch and 8inch MS pipe line from MOCP coal face sump for discharging mine water to khodo river by jointing the proposed range with the existing delivery at Muraidih colli
Rep. and modification of damaged bed plate with installation Mather and platt make 2000GPM pump and Motor set with ext. and div. of pipe line with making bends etc with fix. by bolting at Kalimati quarry for dewatering the mines water at DBOCP/NLOCP
Dismantling of pump set from base plate n pipe line and Running Repairing of DSM -6 pump (1000GPM) (KGW Shed) and commissioning the pump WNP, make-Kirloskar having punch sl. No. BnK/IWSP/DSM6/KGW/02 on base plate after repair with alignment n leve
Leakage repair in 2ND range of 10in/8in dia pipe line by replacing of rusted/Damaged 10/8in dia pipe from dragline face 9 seam section to out sourcing cutting area and installation of 4000GPM pump at 9 seam ABOCP mine Block-II Area
(A) Replacing of B/D 4000GPM pump motor set of Jharna face sump (B) Replacing the B/D 1000GPM Turbine pump motor set of Muraidih river side sump (C) Other miscellaneous jobs related to pumping and pipe line work of SOCP Patch under AMP Colliery.
Transporting and installation of HT 2000GPM Pump, motor set at old Ghutway patch-3 and 02times shifting of HT2000GPM pump, motor set in the lower side of the sump and other misc.pumping and pipe line works at Old Ghutway Patch-3 of Damoda Colliery.
Repairing, maintenance, supply N erection of domestic water supply pipe line from 42 No quarry to 42 No colony filter point, supply and fixing of Non return valve, Hose pipe N Foot valve and shifting of 1000 GPM pump with all accessories at TNOCP,HZB
Shifting and replacing overhead tank from 8 pit to near tar plant ground after dismantling Existing pipe 5 Nos. pipe and 02 Nos. bend and refitting at near tar plant and matching with existing pipe line for Islampur and other colonies at Lodna Colli
Installation of a 4000GPM pump motor set on ground level of Jarlahi patch 2nd sump and erection of its delivery from the sump to SILO nalla(3rd range) for dewatering of Jarlahi patch (B) Maintenance of above pump and its pipe line under AMP Colliery.
Dismantling of three range of 8 dia pipe from pump house Patch A to discharge point near kiln and erection of one range of pipe line from Patch A pump house to discharge point near Baiti basti providing firefighting arrangement by Laying 3 dia pi