Loading…
Loading…
65 live49 closing this weekmost from Kerala Water Authority and Local Self Government Department
65 results • Best match
O and M Water Supply Schemes TRIPUNITHURA MUNICIPALITY AMC WSS to Tripunithura Municipality and Adjoining Pts Southern side of NH 49 NH 85 for the year 2026 27 Pipeline Work
O AND M Water Supply Schemes TRIPUNITHURA MUNICIPALITY AMC WSS to Tripunithura M and Adjoining Pts Northern side of NH 49 NH 85 for the year 2026 27 Pipeline Work
State Plan 2025 26 Supply and erection of 215 HP centrifugal pump sets having a discharge of 417 LPS against a total head of 30m at Thammanam Pump House Pipeline Work
O and M Water Supply Schemes Maradu Municipality JNNURM WSS to Kochi City Part I AMC of WSS to Maradu Municipality West side of NH 47 NH 66AI for the year 2026 27 Pipeline Work
O and M Water Supply Schemes Maradu Municipality JNNURM WSS to Kochi City Part I AMC of WSS to Maradu Municipality East side of NH 47 NH 66AI for the year 2026 27 Pipeline Work
Proj 513-26-27 New ward 51- Road raising tile relaying and drain construction at Narayanashan road drain construction Kuzhiyana Thachambilli road tile relaying at pipeline road Tile laying at Kaniyampuzha kavanal road and side wall protection
Construction of Permanent Campus for IIT Palakkad under Phase B SH: External Development SW: Providing, Laying, Testing and Commissioning of DI Water Supply Pipeline from the water treatment plant (H04) in Sahyadri Campus to the sump tank at the Nila Campus
Structural steel work, Aluminum work, Pipeline work, painting, column retrofitting etc.
replacing old 110mm PVC pipe with 110mm PVC pipe and shifting connections to the newly laid line from kolathu temple to government girls Higher Secondary School in ward 6 of Haripad municipality for a stretch of 750m.
Hiring of Vehicle for Pongummoodu Section for both Maintenance and Revenue activities under Pongummoodu sub division for the year 2026 - 2027- Pipeline Work
State Plan-2025-2026 - ARWSS to Maneed and Mulanthuruthy, Amballoor and Edakkattuvayal Panchayaths-Supplying and fixing of Valves in various places under Mulamthuruthy Section. Pipeline Work
DEPOSITCSME Parinamam Road Supplying and laying of 63mm pvc pipe for providing water supply arrangements to Hostel Building owned by Daisy Geeorge in DIV 72 Kochi corporation Pipeline Work
State Plan 2026-2027-UWSS to Muvattupuzha and Marady-Replacement of 250mm AC with 250mm DI K9 Pipe at Kavumpady road to Kizhakkekkara and allied works under P.H Section Muvattupuzha-General Civil Work-Pipeline Work
DEPOSIT Work Improving water supply to Kannanthodath road by changing the tapping point from100mm AC pipe to 300mm CI pipe and laying 160mm 6kgper cm2 PVC pipe across Aluva Ernakulam road in Div 34 old 38 new of Kochi Corporation Pipeline