Loading…
Loading…
10,767 results • Best match
Alathur Block Panchayath Annual Plan 2023-2024 Uravinchal Thottinpalla Drinking Water Scheme Pipeline Extension in Tharoor G.P-Proj No 94
Relaying of Pipeline in Civil Line Road for Construction of Metro Rail by Kochi Metro Rail LTD under Ernakulam GA
Water Supply Schemes-Annual Maintenance of water supply system -for Anicadu Grama Panchayathu for the year 2023-24-Pipeline Work
Jaljeevan mission 2020 21 Thiruvananthapuram District Aruvikkara GramaPanchayath Providing house hold connections and providing pipeline extensions in Aruvikkara grama panachayath
Deposit Work 2019-20 - Pattambi Block Panchayath - Pipeline extension in Natyamangalam Paramelpadi - Padinjarethil road (Ward-1) at Kulukkallur Grama Panchayath
MPLADS - 2024-25 - Sri Anto Antony MP - Replacement of Existing Pipeline at Vettikkulam- Arampuli Drinking Water Project in Poonjar GP
KIIFB RWSS to Thiruvambady Relaying Part of Distribution line from Kattiyattu junction to Erumbhakam at Thiruvambady Grama Panchayath Pipeline Work
KWA Revenue-Mace of CARWSS to Moorkanad and Adjoining villages-AMC 202223 Leak rectification works in Moorkanad panchayath-Pipeline Work
AMRUT-2 -Kozhikode Water Supply Project-Malaparamba Zone-Replacing old Premo pipe at Malaparamba Water tank to Eranhipalam-Pipeline Work
Jal Jeevan Mission (JJM)-Last Mile Connectivity of Thalavoor to Saturate FHTCLast mile connectivity of Thalavoor Grama Panchayath-Pipeline Work
JJM-WSS to Thripangode Mangalam Purathur Thalakkad and Vettom GPs - Providing Distribution Network and FHTCs -in Vettom GP -Pipeline Work
Pudussery grama Panchayath deposit work 2020-21 pipeline extension atKizhakkumuri various places of W No 6(14) in Pudussery panchayath
Annual Maintenance of LIC Aided RWSS to Malayattoor Repairs to the pipeline for one year 2022 23 in Malayattoor Panchayath
KIIFB-Improvements to Parappanpoyil-Karakunnu road 0/000 to 8/400 in Kozhikode District-Shifting of KWA Utilities-Pipeline work
DEPOSIT-Vypin Block- Njarakkal Panchayath-Laying 90mm PVC Pipe and shifting connections in Coir Society Road- Ward 9-Pipeline Work
DEPOSIT Aruvappulam Grama Panchayat Mlanthadam water supply scheme Phase 2 GLTank Pump set Pumping lines and distribution line Pipeline Work
JJM-2021-22-Elanthoor grama panchayath - Pipeline extensions and providing FHTCs at various places in Elanthoor grama panchayath- 3rd SLSSC
KDP 2021-2022 (Mylapra Grama Panchayath)-Extension of pipeline to Kottamala bhagam in ward no.3 of Mylapra Grama Panchayath
AMRUT 2 Providing FHTC to the existing completed schemes in Kochi Corporation Division No 1 to 28 New Pipeline Work
Water Supply Schemes-Annual Maintenance of water supply system -for Kallooppara Grama Panchayathu for the year 2023-24-Pipeline Work
JJM PHASE 3 AROOR PANCHAYATH PROVIDING BALANCE FHTCs UNDER RETROFITTABLE AUGMENTABLE SCHEME JAL JEEVAN MISSION 2022 23 Pipeline WorkExtension 2
Jal Jeevan Mission JJM WSS to Aikkaranadu Mazhuvannoor Kunnathunadu panchayaths Providing Distribution Network and FHTCs in Aikkaranadu Panchayath Pipeline Work
DEPOSIT UWSS to Nedumangad Muncipality Enhancement of water supply in SUT Hospital area Venkodu by using Booster Pump Pipeline Work
LAC-ADS- Laying interlock tiles 420m in Alphonsa road in HUDCO pipeline road - Choornikkara GP Ward 2.-General Civil Work
KIFB project RWSS to Ariyancode Laying rider main of 110mm PVC pipe 10kg/cm2 from Keezharoor to Aruvikkara Pipeline Work
Annual Plan-Lalam BP Project No S0041/25-Pipeline and Associates for Kizhaparayar Jeeva DWSS-Meenachil GP -General Civil Work
Deposit Work Kottayam Muncipality KSP WSS to Nattakom Pipeline extension in various Roads in Ward No 39 of Kottayam Municipality
State Plan 2024 2025 TWSS Replacing of old damaged AC CI pipes at various places under Kuriyathy section Pipeline Work
JJM - 5th SLSSC - Pipeline extension, Construction of sump cum Pumphouse, Filter media changing and providing 2489 FHTCs in Kaviyoor Gramapanchayath
DEPOSIT Payyannur Block Panchayath Year 2021 2022 Providing water connection to ST Colony at Bhoodanam in Cherupuzha Panchayath Pipeline Work
S0 51/23-24-Paving interlock tile in Temple road byelane George lane Pipeline road side concreting in ward 27
State Plan RWSS to Mukkam Municipality Laying 160mm PVC pipe across PC junction by push through HDD method Pipeline Work
Supply and Installation of Acid and Lye Bulk Storage tanks incl. necessary Pipeline Work at Malappuram Dairy Under MRCMPU Ltd.
Jal Jeevan Mission JJM-JJM - CK1 Phase-Ernakulam Dist. - Providing FHTC in Chittattukara panchayath and allied works - Phase - Pipeline Work
State Plan-2025-2026-Replacing damaged 50mm GI ,80mm GI distribution line in various stretches in Purappuzha GP.-Pipeline Work
SO 607/25, Ward 9 Athrassery road , pipeline bylane road, metroyard road metroyard byelane road Tile laying -General Civil Work
Jal Jeevan Mission Mangattupara 11.5 Mld plant Part 1 General Civil Work Cwss to Aryanadu Uzhamalakkal Grama Panchayaths Pipeline Work
Annual Plan-Chinnakanal GP 2024-25 -Ward 13- Myladumpara SC Nagar Drinking water Project - 279/25-Pipeline-General Civil Work
Jal Jeevan Mission (JJM)-CWSS to Karulai, Amarambalam, Moothedam and Chokkad -Package X - Distribution system to Moothedam Panchayath.- Pipeline Work
DEPOSIT-RWSS to Ollukkara-Disconnection of 256 Public taps at various locations under Ollukkara scheme area, Thrissur corporation- Pipeline Work
DEPOSIT WORK 2023-24 - Nooranad Grama Panchayath - Project 1 - Pipeline extension at Ward 4, 6, and 14 in Nooranad Panchayath
STATEPLAN 2023 24 PROVIDING LEVEL INDICATORS CCTV COMPOUND WALL AT PUMPHOUSE AT MR HILL UNDER WW SECTION KURIATHY PIPELINE WORK
DEPOSIT--Thrissur District Panchayath -Indo - Soviet Drinking Water Project in Kolazhy Grama Panchayath (Ward No 11)-- 2nd part-Pipeline Work
DEPOSIT-Edavanakkad Panchayath -Laying 63 mm PVC pipe for 275m at Kadakkara road east end in ward 5-Pipeline Work
EGP 2025-26 PNo 538/25 PRMLPS WATER SCHEME CONNCETIONS AND PIPELINE Edavaka GP-WARD 4- OWN FUND Rs 35000/-
GENERAL-ANNUAL PROJECTS-2022 23- PROJECT NO 318/23 CHOORALKKUZHI DRINKING WATER PROJECT - PIPELINE LAYING WARD 28-General Civil Work
RWSS to Edathala Deposit work Extension of pipeline to Chalappilly by lane road in ward no 19 of Edathala Panchayath
DEPOSIT-Public Tap Disconnection- Thannithodu grama panchayat Disconnecting public tap connections in various ward at Thannithodu grama panchayat-Pipeline Work
Annual Plan-CHALISSERY GRAMAPANCHAYATH 2023-24 PALAKKAPEEDIKA PIPELINE NEETTAL IN WARD NO 2-PROJECT NO 96/23-General Civil Work
Depositwork_Kottayam District Panchayath 2018-19 Extension of pipeline at Mutuchira Kottappuram Hospital road in Ward No 10 of Kaduthuruthy Pt