Loading…
Loading…
10,767 results • Best match
Proposed pipe line extension in Mundakkal ward of Mangalapuram GP
Pipe line extension work at Pulikunnu coloney in Manampoor GP
Pipe line extension to APJ Nagar ST colony in mullankolly
Pipe line extension to various places to Pulimath Grama Panchayath
Extension of pipe line in Mankuzhi colony in Madavoor GP
Pipe line extension to IHDP SC Colony in Mullankolly pts.
Pipe line extension in various places of Manamboor Grama panchayath
Pipe line extension to Pappala parakonam road in pazhayakunnummel panchayath
GURUVANAM ERIKKULAM IRIPPIL ROAD PIPE LINE SHIFTING IN MADIKKAI GP
Deposit work- pipe line extension to variouse wards in Mangalapuram
PIPE LINE EXTENSION AND PROVIDING WATER CONNECTION IN UNNIKULAM PANCHAYAT
Pipe line extension to Alavilakam- kochukunnumpuram road in pothencodu panchayath
Pipe line extension to Chundayilpadi DWSS in ward no. 02
Pipe line extension to Kunnuvila road in Mangalapuram Grama Panchayath.
Pipe line extension to Pathiri Manchuvadu SC colony in Mullankolly
Pipe line extension to Chirakkal ward of Kadinamkulam Grama Panchayath
Pipe line extension to Kanara - Attoor Road in Pazhayakunnummel Pt
Pipe line extension to Parayadi ward in Mudakkal Grama Panchayath
RWSS to Edakkode- Extension of pipe line in Pothencode panchayath
Pipe line extension to Karuthankalazh and Valiyakolly colony in Meenagady
Pipe line extension to various places in Kilimanoor Block Panchayath
Pipe line extension to Vattali Thekkada colony in Pazhayakunnummel GP
Pipe line extension to Vettipaluthal DWSS in ward no. 17
REBUILDutilityshifting KALATHIKKODU PALLANA PUTHENVELIPPADI IN ARANMULA GP PIPE LINE WORKS
REBUILD RKI Automation of Pump Houses Automaion of VT Pumps at various pump houses under WS Section 1 Attingal Pipeline Work
DEPOSIT Division No7 Extension of the Water Distribution Lines at various roads in ward no 7 of Thrikkakara Municipality Pipeline Work
Deposit Work Kottayam Municipality KSPWSS to Kumaranallor area Pipeline extension in various roads in Ward No 4 in Kottayam Municipality
Deposit Work Kottayam Municipality KSP WSS to Kumaranallor area Pipeline extension in various roadsin Ward No 7 in Kottayam Municipality
DEPOSIT-CSME- Providing water supply arrangements to Nanma One Cochin Apartment Complex ,Silver Sand Island,Vyttila tripunithura Municipality- Pipeline Work
Deposit work . Augmentation of RWSS to Kumaly. Shifting of 300mm and 250mm DI K9 pipe lines under culverts along Munnar Kumaly road between 1st Mile and Vandanmedu Junction
Jal Jeevan Mission (JJM)-IMPROVEMENTS OF WSS TO KARAPARA ESTATE-A IN NELLIYAMPATHY GRAMA PANCHAYATH- SOURCE IMPROVEMENT, PROVIDING GRAVITY MAIN, STORAGE TANK, DISTRIBUTION SYSTEM AND PROVIDING HOUSE CONNECTIONS
Repair and Overhauling Service - REPAIR RATE CONTRACT FOR UNDERTAKING DEGUTTING REGUTTING OF MACHINERIES EQUIPMENT AND PIPELINES FITTED ONBOARD IN SHIPS AND YARD CRAFTS AT SNC INCLUDING INS DHRUV AND INS SAGARDHWANI; REPAIR RATE CONTRACT FOR UNDERTA..
GENERAL Urgent requirement for repair and maintenance of shades and outside painting work including rectification of damaged pipelines in the back side of SAT B Block attached to Govt Medical College Thiruvananthapuram work General Civil Work
Thiruvarppu Gramapanchayath for a distance of 600 meters.Work includes supply and laying of 600 meter 90 mm pvc pipe and necessary fittings incuding bend and elbows and couplings making interconnection with existing line
DEPOSIT KDP 2021-22 Mylapra Grama Panchayath-(General)Extension of pipeline to Olikkalpadi valumannilpadi in ward no 7 and Mylapra Poovannappadi Munjinattu road in ward 10 of Mylapra Grama Panchayath Pipeline Work
Deposit work by Aryanad Panchayath- RWSS to ARYANAD - Pipeline extension in Pallivetta Cheriya Aryanad Road for a length of 300m up to Neerazhithalakkal, in Kanjiramoodu Ward in Aryanad Panchayath
Deposit work -2021-22, -Shornur Municipality-(Ward-26) Pipe line Extension Various Places (1) Near Nedugottur Club to house of Radhakrishnan (2) Near Subrahmanian Kovil to house of Nellikulangara Sulochana (3) Kakkalath Road -Pipeline Work
Supplying and laying distribution network and providing FHTCs-Balance work Phase II- -Pipeline Work
JJM 2022-2024 Providing pipeline extension and FHTC at Vellanad Town and adjoining areas in Vellanad Panchayat(12 th reach) - SLSSC 5
Pipeline extension in Adakkakalam Thottyil road in Ward 8 Pulamanthole Grama Panchayath - Laying 220 Mtrs of 90 mm PVC and Road Restoation
10000 MT New Ammonia Tank jetty pipeline work (piping, instrumentation, civil and structural) at FACT Cochin Division, Ambalamedu, as per tender documents.
ALAPPUZHA MUNCIPALITY ZONE I- PROVIDING DRAINAGE FACILITIES BY CONSTRUCTING CUT AND COVER IN KOCHIMGGANAMPARAMBU ROAD IN CANAL WARD - PROVIDING NEW PIPE LINE INSTEAD OF EXISTING PIPE LINE
33KV XLPE 3C X 300 SQ MM, 6.6KV XLPE 3C X 300 SQ MM, 11KV XLPE 3C X 300 SQ MM, 6.6KV XLPE 3C X 185 SQ MM, 6 .6KV XLPE 3C X 185 SQ MM, 4C x 16 sqmm FRLSH XLPE LT CU cable, 4C x 2.5 sqmm FRLSH XLPE LT CU cable, 14C x 2.5 sqmm FRLSH XLPE LT CU cable, Earthing cable 10 sqmm Cu cable, 4C x 185 sqmm FRLSH XLPE LT AL cable
LAC - ADS - 2019-20- Proposed by Honble MLA Sri. A.P.Anil Kumar- Wandoor LAC- Pipeline Extension to Karutheni Area In Kalikavu Panchayath
Annual Plan-Madavoor GP 2024-25-257/25 Restoration of KWA pipeline cut roads ward 7 to 9-General Civil Work
Deposit work (Urban Agglomeration) Laying 90 mm PVC pipe along Ayyappankave Pallikulangara Road in Ward 8 of Kozhikode Corporation-Pipeline Work
Jal Jeevan Mission (JJM)-JJM - Kuttanad Drinking Water project - Phase II - Providing FHTCs in Edathua Panchayath in Alappuzha District -Pipeline Work
KVP 2020 21 Jilla Panchayath Deposit work providing pipeline extension to Aravindveli Parathazhe road in ward VI of Neendoor Grama Panchayath
KDP 2021 22 Elanthoor Block Panchayath Project No SO 0099 22 Extension of Pipeline to Kozhenchery division of Elanthoor Block Panchayath.
State Plan Budge Proposal UWSS to Nedumanagad Augmentation and enhancing the distribution net works Nedumanagadu Municipal area REACH 2 Pipeline Work