Loading…
Loading…
10,767 results • Best match
JJM 2020 2024 Providing FHTC with replacement of old pipes and pipeline extensions in various wards of Vilappil Panchayath second reach
JJM -Phase II - UWSS to Anakkayam-JJM- Phase II - Anakkayam- package C Laying of distribution systems in Anakkayam panchayath-Pipeline Work
Deposit Work Annual Plan Fund 2019 2020 Ummannoor Grama Panchayath SC Extension of pipeline to Mukaluvila colony in ward no 15
Deposit Work 2019 Thodupuzha Block Panchayat. RWSS to Manakkad. Extension of pipeline in Various places of Arikuzha Division in Manakkad panchayath
DEPOSIT-CWSS to Varkala-Deposit work-Supplying and laying 90mm pvc pipe at Vallakkadavu Thottippalam road in Varkala Municipality -Pipeline Work
JJM - 3rd SLSSC -WSS to Mallappally, Anicad and Kottangal Panchayaths- Road Restoration works in Mallappally Panchayath due to JJM Pipeline works.
DEPOSIT CSME Providing 90 mm pvc pipe as CSME line to the Kristal Emerald Apartment Palachuvadu in Thrikkakara Municipality Pipeline Work
Work NameJal JeevanMission 2020-2021 Phase II Providing 990 No.s FHTCs in Kollengode Grama Panchayath in Palakkad District and Pipeline extension
AMRUT GLSR at Thrikkakara WSS to Thrikkakara Construction of GLSR Pump House Supplying and errection of VT pump sets Pipeline Work
Work Name SO 188 20 21 Relaying of interlock tile and construction of drain in Ambalam pipeline road in ward 27
AMRUT 2.0 Providing 160 mm and 110mm PVC Rider main and Alteration of Existing connections along Mukkilkada Anandeswram Road Pipeline Work
Deposit work 2020 2021- Sreekrishnapuram Block Panchayath - pipeline Extension work in Ward No.11 Pombra Anodu Colony at KarimpuzhaGramaPanchayath- Division-2
Annual Plan-PROJECT NO 101/25-26 INSTALLATION OF MOTOR TANK AND PIPELINE TO RAHMATHNAGAR DRINKING WATER SCHEME IN KARADKA G.P
Annual Plan-MDR/242/2022-2023 CONSTRUCTION OF TANK PIPELINE AND BASIC FACILITIES FOR DWS IN VARIOUS PLACES OF GRAMA PANCHAYATH-
state plan 202425Relaying 90mm PVC line from Narayana bhavanam towards North in ward no 13 of Thakazhy Grama Panchayath Pipeline Work
Annual Plan-2023-2024-Ettumanoor municipality- THANDUVALLI KUDIVELLA PADHATHI -PIPELINE EXTENSION IN WARD 11-P.No. 368/23-24-General Civil Work
Annual Plan-Madavoor GP 2024-25-259/25 Restoration of KWA pipeline cut roads ward 10 to 12-General Civil Work
Deposit Work Anchal Block Panchayth 2019 20 Extension of pipeline to Cheruvaloor colony in Thevarthottam ward No 4 in Edamulakkal Panchayath
Jala jeevan Mission -A R Nagar Panchayath- Providing FHTC in AR Nagar Panchayath Package 2- distribution system SME FHTC-Pipeline work
Deposit work 2020-21-Malappuram District Panchayath - Pipeline Extension and House Connection to Various SC Colonies of Kannamangalam Panchayath-Phase-III
OandM - Water Supply Schemes-Annual Maintenance of water supply system -for Kottanadu Grama Panchayathu for the year 2024-25-Pipeline Work
KDP-WSS to Govt Medical College Kasaragod at Badiyadka in Kasaragod district Laying distribution line in Medical college campus Pipeline Work
Jal Jeevan Mission (JJM)-JJM-Phase III Ernakulam District-Providing FHTC in Chittattukara panchayath and allied works phase III-Pipeline Work
O M Water Supply Schemes Annual maintenance of water supply system in Muttar panchayat for the year 2023 24 Pipeline Work
DEPOSIT Deposit work Providing CSME to Kaithappadam Ollurkunnu Ward 30 Providing CSME by 63 PVC pipe to Kaithappadam Ollurkunnu Pipeline Work
MLA SDF CWSS TO OVC OLLUR Line extension to Ayur garden road at DN 30 Thrissur corporation Line extension Pipeline Work
Malappuram DP Annual Plan (2021-22), Project No 278-22 Extension of Pipeline for Kariparambu SC Colony Drinking Water Project - Kodur
Annual Plan-PROJECT NO 656/24-25 KAKKYEPRATH DRINKING WATER PROJECT-TANK MOTOR WIRING PIPELINE FIXING-WARD 25-General Civil Work
State Plan- 2022- 23- Cheruppulassery Municipality-Replacing damaged 200mm AC pipe from kalikadavu pump house to Karalmanna Reach- I-Pipeline Work
DEPOSIT WORK 2023-24-THRIKKUNNAPUZHA GRAMA PANCHAYAT - PIPELINE EXTENSION AT KATTIL AND NEELUPARAMBU AREAS IN WARD 16 OF THRIKKUNNAPUZHA GRAMA PANCHAYAT
Annual Plan-2024-25, Uzhavoor BP, 202/25-Installation of Pipeline to Amanakara- Erappumkara DWSS in Ramapuram GP-General Civil Work
Augur Boring Jacking Method for Railway Crossing in Steel Pipeline Laying Phase 2 Project of stretch from Mele Chovva to Muzhuppilangad
Depositwork kumarakom panchayath pipeline extension in various wards in 1 2 3 4 5 6 7 8 10 12 13and 14
OandM Water Supply Schemes Mace of RWSS to Vechuchira Removing sedimented silt and slush from Aruvi Intake pump house Pipeline Work
DEPOSIT Pathanamthitta Municipality Extension of pipeline to Kumbangal melethil bhagam and Konnammoodu Mundaplakkuzhi bhagam in ward no.3 of Pathanamthitta Municipality
Jal Jeevan Mission (JJM)-JICA Assisted KWSP to Cherthala Taluk-Improving water supply in Thycattussery Panchayath by replacing pumpset-Pipeline Work
Instalation of pipeline and motor at old age home chooralmala in ward no 10 Pr no 15-24-25)-Rs 270000
AMRUT2.O Providing FHTCs by augumentation /retrofitting of existing water supply schemes to Thrissur Corporation(8000 nos) Division 27 Pipeline Work
Annual Maintenance of CARWSS to Kozhinjampara, Vadakarapathy, Eruthempathy and Nallepilly Panchayat- Repair works of various pipeline for the year 2020-21
CONSTRUCTION OF PIPELINE AND ASSOCIATED FACILITIES FOR UPCOMING CGD HOOK UPS AND LMCS IN SOUTHERN REGION ON ANNUAL RATE CONTRACT BASIS
State Plan-STATE PLAN 2023-24- REPLACING OLD AC PIPE WITH PVC PIPE AT PALLAM - NELLIKKUNNU ROAD-STATE PLAN-Pipeline Work
Nenmmara block panchayath deposit 2022-23 pipeline extension to various places in Ayilor grama panchayath.-From Chathamangalam to Cheenikkode,Kollengode andoothanthottam
DEPOSIT- KIIFB-2017- Development of Hill Highway-Vellikulangara - Vettilappara reach 3, shifting utilities Vellikulangara Vettilappara road in Mattathur Panchayath - Pipeline Work
State Plan-2023-24 - DRW--WSS to cheekode and adjoining villages- Desilting and cleaning of RWPH well at Irattamuzhi-Pipeline Work
Jal Jeevan Mission (JJM)-RWSS to Wandoor Phase II and I-Shifting of Existing FHTCs to new distribution network-Pipeline Work
Annual Plan-Madavoor GP 2024-25-255/25 Restoration of KWA pipeline cut roads ward 4 to 6-General Civil Work
Jal Jeevan Mission WSS to Thrikkadeeri GP Additional Work Providing distribution in uncovered areas and LSGD Road restoration work Pipeline work
DEPOSIT-PMGSY 2023-24 - Utility shifting work -Shifting of KWA utilities along Valyakattakkal, kottukunnam, Vamanapuram road in Vamanapuram Block-Pipeline Work
KDP 2021-2022 (Pathanamthitta Municipality)-Extension of pipeline from Collectorate junction to Chittoor Bhagam in ward no 30 of Pathanamthitta Municipality
O and M - Water Supply Schemes-Thiruvalla Municipality-Annual maintenance -Running contract- Thiruvalla Municipality for the year 2025-26-Pipeline Work