Loading…
Loading…
10,773 results • Best match
WATER SUPPLY SCHEME
tarring interlocking and drain
DWS
DWSS
First retender
DWSS
O and M Water Supply Schemes JNNURM WSS to Kochi City Part I AMC of WSS to Maradu Municipality West side of NH 47 NH 66AI for the year 2026 27 Pipeline Work
Jal Jeevan Mission CWSS to Puthencruz Thiruvaniyoor Poothrikka and Chottanikkara Panchayaths Package VI CWPM From Thiruvaniyoor to Chottanikkara OHSR Rennovation of OHSR Providing Distribution network and FHTCs in Chottanikkara Grama Pt Pipeline Work
Jal Jeevan Mission JJM JJM 2021 2024 WSS to Adjoining Panchayaths of Varkala Phase II Supplying Laying Jointing Testing and Commissioning distribution networks and providing FHTCs in Elakamon Panchayath in Thiruvananthapuram District Pipeline
MLA-SDF-Kuttanadu MLA Sri Thomas K Thomas-RWSS to Kainakary-Supply, erection and commissioning of new 17.5HP submersible pumpset at Pallathuruthy South Pump House in ward 12 of Kainakary Panchayat -Pipeline Work
Jal Jeevan Mission (JJM)-WSS to Manalur Panchayath PH 2- 5th SLSSC-Laying 350 mm DI Pipe from Manalur Panchayath Crematorium to Manalur Water Tank via Anakkad and Jai Hind Road-Pipeline Work
O and M - Water Supply Schemes-JNNURM WSS to Kochi City Part I-AMC of WSS to Maradu Municipality - West side of NH-47(NH-66AI) for the year 2023-24-Pipeline Work
Jal Jeevan Mission JJM JJM CWSS to Vamanapuram Nellanad and Manickal panchayaths, Phase I and II Package 3 Part 2 Providing distribution network and FHTCs in eastern zone of Vamanapuram Panchayath Pipeline Work
DEPOSIT Restoration (Across road Chevayur Kozhikode Mavoor road Restoration work due to KWA Road cutting for pipeline under Urban Agglomeration scheme at Chevayur Ch 5 480 on Kozhikode Mavoor road General Civil Work
OandM Water Supply Schemes AMC CWSS to Palakkad Muncipality ward 1 to 30 Repair of Various pipe lines and allied works for the year 2023 2024 AMC Ward 1 to 30 Pipeline Work
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Distribution System Providing Pipeline Extensions and 1000 FHTCs in Maranad Ward No 4 Kochalummoodu Ward No 17 and Miscellaneous Connections of Pangode Grama Panchayath
State Plan 2024 25 RWSS to Cherukole Naranganam-Removing sedimented silt and slush from the intake well and removing silt slush earth over the gallery pipe at Puthamon intake pump house-Pipeline Work
Deposit work 2019 20 Restoration of Uthayamkunnu Kunhipalli road from Ch 0/000 to 2/400 deformed due to cutting of water supply Pipeline trench by KWA against the backdrop of AMRUT scheme
O and M Water Supply Schemes Annual Maintenance water supply distribution network of Left side of Thiruvallam Pachalloor Kovalam and Muttacaud area under WW Section Vandithadam for the year 2024 25 Pipeline Work
Deposit work - Sreekrishnapuram Block Panchayath D.W. 2019-20 -pipeline extension and providing house connection to Verkkad SC Colony at Karakurussi -Alupuram SC colony at Pallikuruppu in Karakurussi Panchayath from the existing KWA line.
DEPOSIT-Laying Work-Replacing old and damaged 63mm PVC pipe by laying75mm PVC pipe for a length of 200m at T.P Canal road in Division no. 27(old) of Kochi Corporation--Pipeline Work
DEPOSIT-Disconnection of Public taps and Fixing water meter in Edachery Grama Panchayath.-Disconnection of Public taps and Providing and Fixing water meter to the existing public taps in Edacheri GP.-Pipeline Work
D E P O S I T WSS to N e d u m b a s s e r y Disconnection of public tap in various wards of Nedumbassery panchayath Pipeline Work
Deposit work 2023-24 Alpy DP (Muttar W- 13)-KWSS to Muttar-Laying 90mm pvc line from Maliyekkal pady towards Anchil kadavu for a length of 200m in ward no 13-Pipeline Work
JJM-CWSS TOWANDOOR, TUVVUR, KALIKAVU, KARUVARAKUNDU, EDAPPATTA pt IN MALAPPURAM-PackageI A-1.Construction of11.00mtre dia Intake well 2)laying700mmDI RWP main3)Transfomer room and Operator Shift Room4)ElectroMecanical components ofRWP house-Pipeline
DEPOSIT-Deposit 2023-24 Alappuzha D. P Muttar- W-8 -KWSS to Muttar-Relaying with pvc line from Sahrudaya jn. to Kudavathipady and From Poochalikadavu to Konumadakkal pady in ward -8 -Pipeline Work
J J M-2021-22 - P- II (Balance work)- Velloor panchayat -Providing FHTC in Various wards by Rectrofitting/ Augumenting / Extending the existing Distribution system coming under the jurisdiction of P.H. Division Kaduthuruthy-Pipeline
Jal Jeevan Mission JJM JJM 2021 2024 WSS to Adjoining Panchayaths of VarkalaPhase II Supplying Laying Jointing Testing and Commissioning distribution networks and providing FHTCs in Vettoor Panchayath in Thiruvananthapuram District Pipeline Work
O and M Water Supply Schemes Annual Maintenance Water Supply distribution network of Right side of Thiruvallam Pachalloor Kovalam and Muttacaud area under WW Section Vandithadam for the year 2024 25 Pipeline Work
O and M - Water Supply Schemes-JNNURM WSS to Kochi City Part I-AMC of WSS to Maradu Municipality - East side of NH-47 NH-66AI for the year 2023-24 - Pipeline Work
O and M - Water Supply Schemes-WSS to Tripunithura M and adjoining Pts - AMC of WSS to Tripunithura Municipality-Southern side of NH-49 NH-85 for the year 2023-24.- Pipeline Work
DEPOSIT CSME Thrikkakara Municipality Providing 160 mm pvc pipe AS CSME line to the new projects Xylus Pixel Matrix and Press Land IV of Sky line builders at Athani Kusumagiri Road Pipeline Work
Jal Jeevan Mission (JJM)-WSS to pothumala ward 8 and Rajakkadu ward 7 in nelliyampathy panchayath-Construction of weir,supply and laying of cwdm and cwgm and providing FHTCs-Pipeline Work-RE TENDER
O and M Water Supply Schemes JNNURM WSS to Kochi City Part I AMC of WSS to Maradu Municipality East side of NH 47 NH 66AI for the year 2024 25 Pipeline Work
AMRUTAMRUT 2 SWAP 3Replacing distribution network by laying 160 mm rider main on both sides of road from Thirumala jn to Thrikannapuram bridge in connection with road widening Package 2 RHS Pipeline Work
O and M - Water Supply Schemes-WSS to Tripunithura(M) and adjoining Pts-AMC of WSS to Tripunithura Municipality-Northern side of NH-49 (NH-85) for the year 2023-24-Pipeline Work
DEPOSIT Supplying Laying Supplying and Laying 63mm PVC pipe for a length of 114m at Janatha colony road and Janatha colony road by lane in Div 45 old of Kochi Corporation Pipeline Work
Jal Jeevan Mission JJM JJM 2021 2024 CWSS to Pallickkal Madavoor and Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and commissioning of distribution network in Navaikulam Panchayath Decentmukku Zone 2 Pipeline Work
AMRUTAMRUT 2 SWAP 3Replacing distribution network by laying 160 mm rider main on both sides of road from Thirumala jn to Thrikannapuram bridge in connection with road widening Package 1 LHS Pipeline Work
Jal Jeevan Mission Urakam Panchayath Package 3 Construction of OHSR 2 LL Distribution network to Zone 3 East Vattaparambu Supply and erection of clear water pump sets and allied electrical works Pipeline Work
O and M Water Supply Schemes Annual Maintenance water supply distribution network of Left side of Thiruvallam Pachalloor Kovalam and Muttacaud area under WW Section Vandithadam for the year 2025 2026 Pipeline Work
Urgent Works related to 131 th Maramon Convention 2026 Installation of Hot-Cold Water Dispensers, 1000 Liters per hour capacity RO plant and Providing Water Supply arrangement works at Maramon Convention Pipeline Work
DEPOSIT-Deposit Work 2025-26 - Chambakkulam Block Panchayath -at Ward 8 in Edathua GP -Laying 110mm PVC line from Pandankari SMSS LP School towards South in Ward 8 of Edathua GP-Pipeline Work
KDP 201 22 Pandalam Block Panchayath SCP Extension of pipeline from Muttom colony Punthilathupadi to Cheruthappallil in ward no.12 and Kuzhiyathupadi Chennelil Vadakkecherivu bhagam in ward no.10 of Thumpamon Grama Panchayathu
AMRUT 2.0-ERAVATHUKUNNU SOUTH ZONE - LAYING 600 MM DI PIPE AT MANKAVE JUNCTION CROSSING AND LAYING 200 MM PVC PIPE FROM MANKAVE TO MEENCHANDA JUNCTION IN BOTH SIDES OF THE ROAD-Pipeline Work
State Plan-State Plan 2025-26- Rural Water Supply Schemes - Replacement of Unserviceable Pipe - RWSS to Chunakkara- Replacement of 100mm AC pipe with 110mm PVC pipe from Kidangil to Karingattil Gurumandiram-Pipeline Work
DEPOSIT WORK CSME Laying of new 63 mm PVC pipe 6 kg cm2 on private earth road for Firose Khan and others near Vazhikulangara Athani PWD road at N Paravoor Municipality Pipeline Work
State Plan-(2026-2027 )- Rehabilitation/Improvement Works of UWSS - CWSS to Sulthan Bathery, Noolpuzha and Muttil - Replacement of the DI pumping main with MS pipe near the WTP at MankunnuPipeline Work