Loading…
Loading…
10,774 results • Best match
Deposit work of Smart City Thiruvananthapuram Ltd TSS Mace Supply of DI pipes and specials for rerouting 900 mm DI pumping main from Kuriathy Sewerage pumphouse to STP Muttathara near TRIDA SOUBHAGYA Building Sewerage Work
AMRUT 2015-16 - Replacing the existing 525mm distribution cum pumping main OHSR along Santo Gopalan road - Upgradation of Electrical Installation inside pump house-Supply, erection, testing, commissioning and maintaining of 30 HP Centrifugal pump set
JJM-PHASE II WSS to Chathamangalam and Adjoining 7 Panchayaths in Kozhikode District - Construction of Intake well cum pumphouse Supplying Laying Testing and Commissioning of Raw Water Pumping Main Construction Commissioning of 100 MLD WTP
Design, Construction, commissioning and maintenance of 6 LL OHSR at Meenakshipuram Irrigation compound, clear water pumping main from WTP to proposed tank at Meenkshipuram, supplying and erection of motor pumpset, supplying and laying distribution sy
MLA ADS Thrissur LAC Kokkalai drinking water supply project in Thrissur corporation Div 39 PhaseI construction of 0.50 LL OHSR 4 meter dia RCC well cum pump house Supplying laying pumping main and distribution network
Jal Jeevan Mission WSS TO PothuPara School Padi IN WARD 6 AND 11 OF NELLIYAMPATHY GP--CLEANING EXISTING WELL, CONSTRUCTION OF PUMP HOUSE, SUPPLY AND ERECTION OF MOTOR PUMP SET, REPLACING DAMAGED PUMPING MAIN, ETC
Design,Construction ,Commissioning and Maintenence of 11LL GLSR at Plamaram,6LL GLSR at Munimala and 6LL GLSR cum of Clear Water Pumping Main , Clear Water Gravity Mains and distribution system with providing FHTCs 7000Nos, etc..
Construction of Sump Cum Booster Station at Kambipalam,GL Tank at Memal,Supplying and laying clear water pumping main from Manjalampuram to Kambipalam,Manjalapuram to Kelakam Junction towards Poovathinchola, Kambipalam to Parathode and Kambipalam to
AMRUT- 2017-18 - Construction of 10LL OHSR at Anappara with pumping system and Pumping main from Cherur to Anappara -Balance works of 500KVA transformer at Cherur pump house - Installation of CTPT unit and allied works.
Construction of Intake well cum pump house, Raw Water Pumping main, 10MLD treatment plant ,Clear Water Pumping mains,10 LL OHSR-2Nos., 9.0LL OHSR, 10000L GLSR-2Nos.,Raw water and clear water pump sets, Transformers
OandM Water Supply Schemes RWSS To Sooranad North Annual Maintenance 2026 and 2027 Leak rectification work in AC PVC GI pumping main distribution lines at various places of Sooranad North Grama Panchayath General Civil Work
AMRUT 2.0 AMRUT Design, construction, and commissioning of 3 MLD WTP and 10LL OHSR at Mulayam-Package 9 Supply, Erection and commissioning of Centrifugal pump set at Mulayam Pump House Head 40m, Discharge 45 Ips Pipeline Work
Deposit work -2019-20- Shornur Municipality- Pipeline extension and Relaying of the existing pipe at Ward 4 ( PVJB School Road, SK Nagar, Kalliyad Road ) and Ward11 - Nambram Mini Scheme- Relaying 50mm GI pipe From Excisting 63mm PVC
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Distribution System Providing Pipeline Extensions and 1000 FHTCs in Thrikkovilvattom Ward No 5 Moolappezh Ward No 6 Ambedkar Colony Ward No 7 and Miscellaneous Connections of Pangode Grama Panchayath
KWA Revenue Running Maintanence Contract 2021 22 Mace of RWSS to Kodenchery Natural Source of Koorottupara and Kandappanchal WSS to Venadi RWSS to Thamarassery TWSS to Thachampoyil and TWSS to Kayyelikkal under RWS Section Koduvally Pipeline Work
JJM -Urakam Panchayath -Package-2 -Construction of 6m dia RW well cum pump house 4 MLD WTP 2 nos OHSR Supply and erection of raw water and clear water pump sets and allied electrical works -Pipeline Work
O and M Water Supply Schemes Annual Maintenance of AUWSP to Kolazhy, Kuttur, Pottore and Adjoining Areas Routine mace works for the various pipe lines and accessories in Kolazhy Grama Panchayath July to December 2024 Pipeline Work
KIIFB Utility Shifting WSS to EastEleri in EastEleri Panchayath KIIFB Works 2017 18 Improvement of Hill Highway Kolichal Cherupuzha road KM 0 00 to 31 200 BM and BC Replacing damaged pipeline along Chittarikkal Cherupuzha PWD Road
Jal Jeevan Mission (JJM) - WSS to Manalur Panchayath PH 2 - 5th SLSSC Arimbur and Manalur common Gravity Line - Laying 355 mm HDPE Pipe through KLDC seepage drain, canal from Rachamuttu Bridge to Manalur Panchayath Crematorium - Pipeline Work
JJM WSS to Athirappilly GP Phase II Appendix B Providing Pipeline and FHTCs to ward 1 to 6 Part B Providing GI Provision for crossing rock filled areas and providing MS provision for crossing bridge and culvert
Deposit Work -Sasthamcotta Grama Panchayath- Annual Plan 2020-21-Project No.57/20-Extention of Pipeline to Punnammoodu-Kannilethu road in ward No.5 and Palampally Pallyyad ,Ayanivila road in ward No.15 of Sasthamcotta Grama Panchayath
AMRUT 2 WSS to Tripunithura Municipality Providing FHTC by augmenting or retrofitting the existing Water Supply Scheme and laying new rider line Thiruvankulam Zone Ward Nos 15 16 22 23 24 and 25 Package I Pipeline Work
AMRUT 2 SWAP 3 Proposal for 100per coverage in all wards under Thirumala Section of TVPM Muncipl Corprtion Replacing old line laying new lines alterations and providing new connections Package V PTP PangodeValiyavila Thirumala wards Pipeline Work
O and M Water Supply Schemes RWSS to Elakamon and RWSS and CWSS to Chemmaruthy Running contract 2026 27 Rectification of leakages or breakages of pipeline for a period of one year in Elakamon and Chemmaruthy Panchayath
DEPOSIT KMRL Providing temporary arrangement at Subash Chandra Bose Road canal by demolishing the existing culvert for constructing new in connection with KMRL culvert work in Division No 31 old 53 new of Kochi Corporation Pipeline Work
Construction of RCC overhead water tank of 40000 liters capacity including 10000 liters for firefighting with independent staging including P/F GI pipeline for pumping, scour pipe, and R.R masonry retaining wall for Kendriya Vidyalaya at Malappuram
Annual Maintenanace 202122Maintenance of RWSS to Paipra Repairs of pipelines and taps in Paipra Panchayath for one year period
AMC Arpookkara 2023 CWSS to Ettumanoor and adjoining villages Urgent leak rectification of various pipelines in Arpookkara panchayath 2023
Construction of pump house OH tank supply laying of pipelines supply erection of motor pumpset and chlorine dozing unit.
Construction of pump house OH tank supply laying of pipelines supply erection of motor pumpset and chlorine dozing unit
7670m, 800mm, 700mm, 600mm, 500mm , 300mm DI K9 CWPM from Chuloor to Kaipamangalam OH tank, Edathuruthy OH Tank and Valappad OH tank, installation of fire hydrant restoration of roads after laying pipes and allied works.-General Civil Work
Deposit work 2021. 22 Madapally Block Panchayath Pipe line extension at Koovakkada Thommipeedika road Ph.I and II Pallikkunnu Ezhuvanthanam areas in Vakathanam Grama Panchayath
Deposit work Annual Planning Scheme 2020-21 Vadasserikkara Grama Panchayath - Extension of pipe line from Maniyar jn to Maniyar HS jn in ward 8
DRW 2019 CARWSS to Mulavoor Asamannoor- Extension of 90mm PVC pipe line at Perumattom Palli road , Interconnection work and allied works in Paipra Panchayath
Deposit work-UWSS to Kothamangalam East side - Extension of pipe line from Valiyapara Cheekkoottumali road in ward No. 11 of Kothamangalam Municipality East side.
Deposit work of Neyyattinkara Municipality (1) interconnection between Gramam Junction to Tile Factory road (2) pipe line extension in Muzhiyamthottam load in Kirshnapuram ward
Mace. of NWSS to Olathanni, Ooruttukal and Thozhula Zone - Rectification of leakages in pipe line and allied works for one year RC 2021 - 22.
Deposit work-RWSS to Vellanad-Pipe line extension towards Gangamala road and Crematorium,Ayyarukonam,Mythrinagar,Pallithara and from pump house road in Vellanad pachayath
Relaying of Damaged 32/25 mm GI Pipe line with new 25 mm GI pipe at three places in ward 23 Of Chengannur Municipality
Deposit Work -ARWSS to Paralam-pipe line extension of 63mm pvc pipe in parppakadavu pandaramcole road of ward no x at paralam grama panchayath
Deposit work of Nemom Block-RWSS to Vilappil-Pipe line extension to Ootukuzhy Kuzhivila and nearest branch path in Vilappil pt under Aryanad section
Laying 90 mm PVC pipe line for a length of 180 m in Vandithadam Palappor branch road of ward No21 under Vandithadam maintenance section
Deposit work 2021. 22 Madappally Block Panchayath Proj. No. 96.22 Providing pipe line extension at Elavummood in ward No .09 of Paippad Grama Panchayath
Annual mace 2021 22 ARWSS to Keerampara Repairs of pipe line and taps of various WSS in Keerampara Panchayath for the year 2021 22
Deposit work UWSS to Kothamangalam Muncipality Replacement of old aged pipe line at PVIP canalppady Elakkattuparambil road in ward No 3 in Kothamangalam Muncipality
KDP Vechoocira Grama Panchayath Rwss to Kollamula Kurumbanmoozhi PIpe Line Extension in Ward 5 Olakulam Pathinachupadi Noottanipadi, Ward 6 Mukkoottuthara Santhoshkavala Punjab colony road
Jal-Jeevan mission - 2020-21- Providing Functional House hold Tape Connections through pipe line extensions in various wards of Kollayil grama panchayath (Part - II).
Deposit work SC-Development office in Kollyil grama Panchayath- Pipe line extension from Kannamkuzhi road to Kodavilakam Nadapatha and from Mudmala JN to Manalikonam
Deposit work Block Deposit work RWSS to Arakuzha Extension of pipe line from perumballoor to Palachuvadu road in ward No XIII of Arakuzha Panchayath