Loading…
Loading…
10,774 results • Best match
Jal Jeevan Mission (JJM)-PERUVAYAL GRAMA PANCHAYATH -PROVIDING FHTCs BY LAYING PVC PIPES, GAP CLOSING WORK, ROAD RESTORATIONS A N D A L L I E D W O R K S I N P O O V A T T U P A R A M B , ANAKKUZHIKKARA AND ADJOINING AREAS-Pipeline Work
Deposit Work
MLA - SDFHarippad LAC RWSS to Kumarapuram-Laying of150mm Pipe Line from Unnileth Junction to Umaparambil Thekkethil via Vallolil culvert in ward No.2 of Kumarapuram Pachayath
Deposit work-KumilyGrama panachayath-Annual plan 2020-21-Extension of pipe line at paaramthottupady near kollampattada in Ward 17 in kumily grama panchayath project no(564)
DEPOSIT Kalamassery Municipality Urban Agglomeration Replacement of existing old and damaged PVC AC distribution Pipe line with 315mm HDPE pipe along HMT Medical College road Kalamassery
O and M WSS Utility shifting Ward 5 of Thalikulam Grama Panchayath Pipe line replacing under Culvert at 10th stone in Ward 5 of Thalikulam Panchayath
Laying 90 mm PVC pipe line for a length of 165 m in Punnavilla Valiyavilla road ward No20 of Kalliyoor Gramma Panchayath under Vandithadam maintenance section
Deposit Work UWSS to Kothamangalam east side Laying 63mm PVC 6 kg pipe line at NH Ambalaparambu Branch road in ward No 16 of Kothamangalam Muncipality
JJM- 2020-2021 -Thiruvananthapuram District-Venganoor Grama Panchayath- Pipe line extension from Kalluvettankuzhi to Thumpliyodu to provide water to the FHTCs already done in Thumpliyode area.
RWSS to Vettoor and Cherunniyoor Rectification of leakages and blockages of pipe line for a period of one year for CWSS to Vettoor and Cherunniyoor Panchayath
AMRUT2.0 Neyyattinkara Municipality Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality Neyyattinkara Municipality road restoration work and PWD road restoration work
JalJeevan Mission 2023-2024Parassala GramaPanchayat - Pipe line extension and house hold connections electronic survey in Parassala GramaPanchayat under Water Supply Section Parassala Phase-3- Third Proposal.
DEPOSIT- Kochi corporation - -Laying 90mm and 63mm PVC pipe line in Kureekode road and Aiswarya Nagar road of division no 43(new)32(old) Kochi Corporation
RWSS to Vilappil Mace of Running Contract for the period of 2022-23-Rectification of leakages of various sizes of pipe line in Vilappil Grama panchayath
Supply, erection, commissioning of Raw Water Motor Pump set and Transformer, Refurbishing the filter beds with dual media, Pipe line extension and providing FHTCs (356 Nos)
JJM DER 2021-22 THOLICODE GP - Pipe line extensions (Extra) and providing house connections in THOLICODE GRAMA PANCHAYATH Phase II A1and A2 (Part 1,2 and 2,3).
JJM 2020-21- Providing FHTCs and pipe line extension works in Karakurissi Grama panchayath- Phase I- Additional work Part 2- Street main extension for providing FHTCs.
DEPOSIT WORK 2021-22-Deposit work (2021-2022) - Shoranur Municipality- Pipe line Extension and Providing Water Service connection to Parappuram Anganvadi No. 72 in Ward 3
DRW 2019 Pipe line extension of 75 mm PVC pipe and 80 mm G I pipe at Kudilingabazar in SN puram Panchayath ((IJK M-SPLAN XT151)
DEPOSIT Kalamassery municipality Providing water supply arrangements to ward 17 Ponvelippadam bylane road of Anakkulam road kangarappady in relation with for the irrigation pipe line work
Fabrication Erection Insulation Testing and Commissioning of Methanol Chiller supply and return SS pipelines of U200 300 and Nano TiO2 plant
NABARD-WSS to Kottiyur,Kelakam and Kanichar Panchayaths in Kannur District-Construction of sump cum pump house at Vellonni and pumping main from Kelakam junction to Poovathinchola sump and Poovathinchola sump to Vellonni sump-Package 4 Part 2
WSS to Koolimadu Nairkuzhi in Chathamangalam PanchayathWSS to Nairkuzhi NC/PC Scheme Laying 150MM DI Pumping main from Mavoor treatment Plant TP Stage II Erection of Pump set Power allocation and providing bulk meter and extending distribution netwo
Construction and commissioning of 2.00 LL capacity GLSR - 2nos near Team DOZO (down side of settukunnu) and sugandhagiri Down side, Supply, Laying testing and commissioning Clear water pumping main and supply and erection of pump sets in Pozhu
Supplying and laying pumping main from Booster station at Anakkuzhi to OHSR at Kolithattu, Construction of 7.00LL OHSR at Kolithattu, supplying and laying distibution network for Zone 2 and providing FHTCs and road reformation works and PWD, KSTP,
Design, Construction and commissioning of Grit Chamber, Screen Chamber, Well, Pump House, Pump ,Supplying and Laying 350mm dia DI pumping main, Supplying and laying 150mm and 250mm dia SW sewer line in the housing colony and allied works.
JJM-WSS TO NOORADI-POOTHUND FARM Near Ayurvedic Health Centre IN WARD 11 OF NELLIYAMPATHY GP--CLEANING EXISTING WELL, CONSTRUCTION OF PUMP HOUSE, SUPPLY AND ERECTION OF MOTOR PUMP SET, REPLACING DAMAGED PUMPING MAIN, PROVIDING STORAGE TANKS ETC
DEPOSIT KRFBKIFB-RWSS to Eyyal Improvements to Kechery -Akkikkavu Bypass road km 0/000 to 9/880 Utility shifting Replacements of existing pipes from Aloor river bridge to Paper mill Phase 2,Part A-RWSS to Eyyal Pipeline Work Part A
JJM 2022 2024 Kallara Scheme Phase 3 Distribution System Providing Pipeline Extensions and 986 FHTCs in Kodithookkikkunnu ward No 7 Parappil Ward No 10 Aruvippuram Ward No 13 Mithirmala Ward No 15 and Thumbode Ward No 17 of Kallara Grama Panchayath
DEPOSIT Interconnection For improving water supply in tail end of N K Sreedharan Road by tapping from Chittoor road and laying 90mm PVC pipe for a length of 170m along Karshaka Road in Division 45 of Kochi Corporation Pipeline Work
D E P O S I T D e p o s i t w o r k o f Thiruvananthapuram Corporation Providing water connection to take a break building in Thiruvananthapuram Collectorate premises Under WW Section Peroorkada Pipeline Work
3. Jal Jeevan Mission JJM 2020 2021 Phase I and II-Providing FHTC by retrofitting extension and augmentation of ongoing water supply scheme in Balusseri Grama Panchayath Providing Online Boosting station and FHTC in Ward No 13 and 15 Pipeline Work
Jal Jeevan Mission JJM Jal Jeevan Mission J J M R W S S T o K o l l a m u l a Kurumbanmoozhy Arayanjilimon Supply of open well submersible pump set at Kollamula Booster pump house Pipeline Work
MLA-SDF-Extension-Changing of tapping from the existing main in Karshaka road to Toll gate road by laying 63mm PVC for a length of 78m for improving water supply in Pamattuthundiyil area in Division 45 in Kochi Corporation -Pipeline Work
DRW 2022-23- Muttar grama panchayat - KWSS to Muttar - Relaying 110mm pvc line from St Joseph chappal to Mission hospital 90mm pvc line from Mission hospital towards south up to society and towards north near to manalil house - Pipeline Work
AMRUT - Amrut 2.O - Providing Hot line from Mangadikkunnu WTP to ward 23 and 32 of Irinjalakuda Municipality, Strengthening of old AC and PVC pipes by replacing with new PE/PVC pipes, and Providing 200 numbers of FHTCs - Pipeline Work - 1
O AND M Water Supply Schemes 2025 26 WSS to Tripunithura M and adjoining Pts AMC of WSS to Udayamperoor Panchayath Pipeline Work Periodical repair works and valve operating duty to water supply system to Udayamperoor Panchayath for the year 2025
Jal Jeevan Mission JJM 2020 2021 Phase I and II-Providing FHTC by retrofitting extension and augmentation of ongoing water supply scheme in Balusseri Grama Panchayath Providing online boosting stations and FHTC in Ward No 3 and 4 Pipeline Work
Deposit work of Thiruvananthapuram Corporation -Project No S0548/2022 - Improvement of water supply to Adarsh Nagar and TPJ lane areas-Water supply improvement by laying 110mm PVC line from Tee point of 700mm DI main in Pattom Ward-Pipeline Work
Deposit Work Eloor municipality Urban agglomeration Replacement of pipe lines and line extension for WSS to Eloor municipality Replacing old damaged 100mm AC and 80mm AC pipe with 110mm PVC and 90mm PVC at various wards and extension of pipeline 63
state Plan 2025 26 SWS 128 Rural Water Schemes 4215 01 102 97 Urgent replacement of existing damaged 90mm PVC with 90mm PVC 6kg cm2 from Madhavassery to Nazrat via Kavanad Palam in ward 1 of Champakulam Panchayath Pipeline Work
Name of work DEPOSIT Laying of 90mm PVC Pipes in Ambalamukku Sreevilas Lane A and B Branches with associated Connection Alterations Laying of new 90mm PVC pipe along with connection alterations by replacing old AC pipeline in A branch in Sreevilas
OandM Water Supply Schemes Mace of RWSS to Aythala Removing sedimented silt and slush from the intake well and removing silt slush earth over the gallery pipe and cleaning the gallery leading pipe at Aythala intake pump house Pipeline Work
O M Water Supply Schemes W.S.S to N. Paravur Municipality and Adjoining Panchayaths Replacing old damaged 75mm PVC pipe with new 90mm PVC pipe in Kalluchira Perumpadana Bund road River View road in connection with BMBC tarring work Pipeline Work
JJM WSS TO PANAVOOR REPLACING EXISTING 300 MM AC PIPELINE FROM ALAMUKKU(OHSR) TO SN PURAM JUNCTION USING CORRESPONDENCE SIZE DI PIPES -PIPELINE WORK
DEPOSIT-(24-25) - WSS to Mananthavady, Edavakka and Naloornadu villages-Pipeline extension to Chettapalam pilot road in Manathavady(M) (Proj No. 1157)-Pipeline Work
DEPOSIT-(24-25) - WSS to Mananthavady, Edavakka and Naloornadu villages-Pipeline extension to Vincentagiri Pattavayal road in Manathavady(M)(Proj No 1160)-Pipeline Work