Loading…
Loading…
10,729 results • Best match
Jal Jeevan Mission Kannur District Ulikkal Panchayath Laying distribution network and providing FHTCs in Ulikkal Panchayath Package 4 Construction of 4MLD WTP and allied components, Pumping main, Gravity main, Distribution system for Zone4
depositwork laying pipeline at kattilparamba subrahmania kshethram residence area in ward 12 of kozhikode corporation
Peringome Vayakkara GP Construction of Open well laying Pipeline and motor at GLPS perinthatta south-99/24-25(Retender)
KTLR 223-2022-23 Annual Plan-Drinking water pipeline construction in Kovilkadavu ward
MARAYOOR GP 2024 25 Chinnavara drinking water pipeline installation SO P No 184
Annual Plan 2025 26 KANDANASSERY GP SAMSKARIKANILAYAM DRINKING WATER PIPELINE INSTALLATION PRO 257
DEPOSIT Pipe line extension at South koduvally to kallidukk masjid Pipeline Work
KIIFB-WSS to Tanur Municipality and Adjoining four Panchayaths-Laying Clear Water Gravity Main and Distribution Network For Tanur Municipality -Pipeline Work
Jal Jeevan Mission JJM -JJM-2022-23 Adatt Avannur Kaiparambu and Tholur Panchayaths in Thrissur District -Laying of Pipes for Clear Water pumping main from Puzhakkal to Mundur - General Civil Work
Deposit work of Kalliyoor Panchayath project No.4 20_2019_20 Laying pipeline at various places of ward no 2 under Karamana section
Restoration work due to laying of pipe line by KWA -JICA Project on Nellikunnam Chepra road from 2/700 to 5/400
REPAIR/ROUTINE PREVENTIVE MAINT AND REPLACEMENT OF FILTERS, DUCT CLEANING AND REPAIR TO FCUs, CSUs, COOLING TOWERS, CONDENSER AND CHILLED WATER PIPE LINE AND AHUs AT NB(K)
Rectification of transit shed in the Seaward wharf at Vizhinjam Fishing HarbourLaying of pipe line in seaward wharf-General Civil Work
Jal Jeevan Mission clear water pumping main to trippakadu 8LL valiyavila 6.1LL paramugal 6LLclear water pumping main to valiyavila OHSR 200mm DI Pipeline Work
Work Name SO 57 22 Interlock tile laying of Pipeline road byelane and drain maintenance in ward 22
DEPOSIT-Edavanakkad panchayath-Laying of pipe lines in various parts of ward 7 -Pipeline Work
Deposit Work Providing 33 nos FHTC and pipe line extension Ambedkar New Colony in Muthalamada Grama Panchayath Pipe line extension Pipeline Work
DEPOSIT-Pipe line extension from KWSS to Vanitha Visramakendram at new Bus stand kasaragod-Pipe line extension and Water connection-Pipeline Work
AMRUT 1 0 KOZHIKODE WATER SUPPLY PROJECT KOVOOR ZONE EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS KOVOOR DEVAGIRI ROAD Pipeline Work
AMRUT1 0 KOZHIKODE WATER SUPPLY PROJECT POTTAMMEL ZONE EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS PATTERI MAVOOR ROAD PUTHIYARA Pipeline Work
MLA SDF 2017 18 Ettumanoor LAC providing rider pipe line and pumping main to Choorakadav Mini Water Supply scheme in ward II of Arpookara Panchayath
AMC 2026 27 RWSS to Karimpuzha Annual maitanance of various pipe line of pumping main and Distribution system and connected works under PH section cherpulassery
NARIKAL KINARIL MOTOR PIPE LINE ENNIVA STHAPIKAL IN THIRUNELLY GP
PIPE RISING MAIN TOP 1152 WILO UP10GH, PIPE RISING MAIN INTER 1151 WILO UP10GH, PIPE RISING MAIN BOTTOM 1150 WILO UP10GH, STOOL MOTOR BEND COMBIN 1041 WILO UP10GH
REPAIR ROUTINE PREVENTIVE MAINT AND REPLACEMENT OF FILTERS DUCT CLEANING AND REPAIR TO FSUs AND CSUs COOLING TOWERS CONDENSOR AND CHILLED WATER PIPE LINE AND AHUs AT NB(K)
Special Development Fund for MLAs Work for 2019 20 Schemes Proposed by Dr M K Muneer MLA for Drinking water pipe line installation at Karangottu paramba, Pandarathu Valappu, Thir
DEPOSIT EXTENSION OF PIPE LINE IN VARIOUS WARDS IN CHOORNIKKARA PANCHAYATH-Pipeline Work
JJM Piravanthoor- JJM Piravanthoor minor pipeline extensions and road restoration- pipe line work
DEPOSIT pipe line extension to Raroth Chalil in Mukkilangadi From Mukkilangadi Pipeline Work
DEPOSIT KADINAMKULAM Pipe line extension in various wards of Kadinamkulam panchayath Pipeline Work
DEPOSIT DEPOSIT Replacing 80mm GI pipe pumping main service laying Punnakkunnu Altharappad in Kulanada Grama Panchayath Pipeline Work
State Plan 2024-25 Rural Water Supply Schemes Utility Shifting PMGSY Road work Pipe laying from Punchappadam to Pookkottukavu Pipe laying work Pipeline Work
JJM-3rd SLSSC - Laying Pipeline and Providing 2793 FHTCs in Ranni-Perunad Panchayath including road restoration works
eye1/5440/20 filling trench for cutting laying pipeline at E M C road in div 41
JJM-Supplying and laying Clear Water Transmission main, Gravity main, Pumping main, Constructing Boosting pump house, Supply erection,Commissioning Pump sets, and Constructing 17.30 LL Capacity OHSR with 3.46 LL capacitysump cum pump house in Kulasek
Jal Jeevan Mission-WSS to Eroor Panchayath-Phase I Package-2- Laying of pumping main and Gravity main to OHSR distribution network in Eroor-Edamon road and its by roads in Eroor panchayath in Kollam district
JJM - CWSS to Kunnathoor, - Supplying and laying Clear Water Transmission Main, Gravity main, Pumping main, Constructing Boosting pump house, Supply errection, Commissioning CF Pump sets,Constructing 8.57 LL Capacity OHSR with 3.71 LL in Thodiyoor pt
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths Supplying Laying Testing and Commisioning of Gravity Main Pipeline from 700mm - 350mm DI K9 from Koorada OHSR to Kokkur OHSR...-Pipeline Work
DEPOSIT-Deposit work for coporation-EXTENSION OF DISTRIBUTION PIPELINE IN PWD ROADS UNDER URBAN AGGLOMERATION - WARD No.21 - CHEVAYUR - FOR KARAKUNNU AREA (BEHIND TOPFORM HOTEL)-Pipeline Work
Jal Jeevan Mission (JJM)-JJM Pipeline replacement-JJM pipeline replacement-RWSS to Velinalloor-Replacement of damaged pumping main from Attoorkonam Raw water pump house to WTP at Attoorkonam-Pipeline Work
Annual Plan-7/2023 Erattayanikunnu- Olikunnel Drinking Water Scheme Pipe Line Laying Work Ward 12 In Marady GP General Civil Work
Insulation Work-Providing new insulation to AC chilled water pipe line passing through the D-Block at the Administrative Block of KLC after dismantling the damaged insulation-General Civil Work
Annual Plan-Annual Plan-Thrikkalangode GP Annual Plan 2023-24, Proj.No-538,Completion of the Kolamkolli Drinking Water Pipe Line Motor Tank Pump House-Proj.No-538-General Civil Work-1
PIPE LINE
05-Installation of Motor and Pipe Line in Pallimukku Anganwadi
KIIFB Reconstruction of pump house of RWSS to Muzhakunnu and Supplying and laying of pipe line Utility shifting for Vallithode Ambayathode roadGeneral Civil Work
Deposit work 2019 20 Renovation of mini WSS at Echippara in ward No 7 of Varantharappilly Grama Panchayath Part III Laying of pipe line
DEPOSIT Urgent Pipe line extension at Kottamuri Vayal in Mayyanadu Panchayath Near Kottamuri Vayal Pumphouse Urgent Pipeline extension Pipeline Work
JJM Kareepra Panchayath Phase II- Construction of OHSR, laying pumping main, gravity main and distribution system supply and installation of pumpsets renovation of existing pump house and WTP, construction of chlorination room etc in Kareepa Grama p
JJM 2021-2024-Chinnakkanal, (Part-1) Package3-Supplying Laying,Testing and Commissioning of 100mm DI K9 Pumping main, 150 mm DI K9, Gravity main and Distribution system for zone3, Zone5 and Zone 6.Design, Construction and commissioning