Loading…
Loading…
10,751 results • Best match
ANNUAL MAINTENANCE OF RWSS TO CHINGOLI 2021-2022 - LEAK RECTIFICATION WORKS IN PUMPING MAIN - DISTRIBUTION LINES UNDER CHINGOLI PANCHAYAT FOR THE YEAR 2021-2022
Annual Maintenance - 2021-22 - Leak Rectification Works in Pumping main and Distribution Network of NABARD aided WSS to Areekode under P H Section Areekode .
Annual maintenence- 2021-22-UWSS to Anakkayam , RWSS to Mampad -Leak rectification works in pumping main and distribution system under P H Section , Manjeri
AMRUT 2022 23 Sewerage TSS Block L Supplying and laying 600mm pumping main from Edathara pump house to STP Muttathara Balance work Part II
Annual Maintenance - 2021-22 - CARWSS to Thekkumkara Grama Panchayath - Leak rectification works in pumping main and distribution lines for 12 months during 2021-22
DEPOSIT Kulanada Grama Panchayath WSS to Punnakkunnu Replacing old damaged pumping main of 80mm GI pipe at ward no 8 to Nattupara mukadi colony
KSP WSS to Nattakom Urgent rectification work of damaged 250 mm CI pumping Main from Vellooparambu WTP to Mariyapally OHSR near Mount Carmel School
Deposit work- Mankada block Panchayath - Water supply arrangements to PHC Koottilangadi in ward No. 1 in Koottilangadi panchayath - Providing Pump set and pumping main
AMC 2026 - 2027- Leak Rectification Works in Pumping main and distribution system of WSS to Othukungal and Ponmala under PH section No.1 Malappuram
Supplying,Laying Raw Water Pumping mains-Raw Water Pumping main-Pipeline Work Civil Work
JJM-3rd SLSSC- Koipuram Grama panchayath - Supplying and laying of Pipe lines and providing 7667 FHTCs including road restoration works.
Deposit work-2019-20 ARWSS to Arakuzha - Extension of 63mm PVC pipe line at Kathodimala in ward No. II of Arakuzha Panchayath
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Laying Distribution Pipelines Pipeline Extensions and Providing 884 Functional Household Tap Connections in Ward No 13 Kanakkode Ward No 14 Mulankad Ward No 15 Kuttiyani and Miscellaneous Connections
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Laying Distribution Pipelines Pipeline Extensions and Providing 880 Functional Household Tap Connections in Ward No 19 Vattavila Ward No 20 Mayiladumukal Ayiroorppara Ward No 21 and Miscellaneous Connecti
Urgent restoration work in karikode Kunnam road due to KWA pipe line laying
Drinking Water Project - Pipe Line, Tank, Pump House
Chittur block PanchayathSCP deposit work 202021 pipe line extension to KoriyarchallaMuthalamthodu in Perumatty grama panchayath
P No207/2022-23,Alathoor padam Drinking Water Project pipe line extension in Ward 5
Providing FHTC and pipe line extension in Chadayamangalam Panchayath of Kollam District- Phase II
Annual Plan-Mananthavady Municipality,P.No. 329/ 2022-23-Erection of Motor, tank and pipe line to Koduvila colony well in division-29, Rs,200000.-General Civil Work
Deposit Work Kottayam Municipality- KSP - WSS to Nattakom-Pipe line extension from Chingavanam to Moolamkulam junction ward 36 -Road Restoration work after laying pipe lines on PWD road.
Deposit work-Karakulam GP-Pipe line extension work to Green valley lane in Mudisasthamcode,Puravoorkonam lane in Vazhayila ward,Chekkakonam and Plathara and Joseph lane-Mudippura road in Kachani ward
Insulation at Media Room-Providing New Insulation Coating to 350mm Dia Chilled Water Pipe line inside of Media Room at Assembly Building at KLC Thiruvananthapuram
Procurement Of Gaskets For BPCL Pipelines Mumbai SR No. 1 To 34 Of BOQ, Procurement Of Gaskets For BPCL Pipelines Uran Sr. No. 35 To 41 Of BOQ, Procurement Of Gaskets For BPCL Pipelines Gujari Sr No. 59 To 74 Of BOQ, Procurement Of Gaskets For BPCL ... BPCL Pipelines Bina ... BPCL Pipelines Kota ... BPCL Pipelines Coimbatore ...
MLA ADF Ettumanoor Providing pipe line extension to Thrikkayil-Vadakkathupady and various places in ward VIIof Athirampuzha Grama Panchayath
KDP 2021-22 - Elanthoor Block Panchayath - Pipe line extension at Elanthoor -Kollampara Road in Ward- 5 of Pariyaram Divisio
State Plan 2019 20 WSS to Kottayam Replacement of 250mm 200mm od AC gravity main using DI pipes to WSS to Kottayam Panchayath in Thalassery Taluk Kannur District Road reformation on PWD Municipal road
Deposit work Vithura GP pipe line extension using 63 mmpnc pipe atMoonnam Number Parankimaam thottam and mullachira sheddumukku and manali Attumanpuram
Deposit Work-Vamanapuram Block Panchayath-RWSS to Palode -Peringamala-Pipe line extension to Kallippara-Chadachikkarikkakom,Plavara SC Colony and Pappanamcode-Mannoor
Annual Maintenance Estimate for leak repair works in the pumping main and distribution lines within the jurisdiction of Moorkkanad grama Panchayath for the year 2025
Deposit work Arpookara panvhayath pipe line extension kasturba arattukadavu road and mavadi Ambalakadavu road ward 1x and X1
Deposit work 2020-21- National Rurban Mission (NRuM) -Phase III- RWSS to Nedumpana - Pallimon - Replacing old and damaged pipes, extension of pipe line,Interconnection of JICA pipe line etc. in Ward No. 17 to 23 in NedumpanaPanchayath
DEPOSIT-SCP corpus fund 2021-2022-CWSS to Varkala amp Adjoining villagesProviding Pipe line extension and giving water connections to Thumpottukonam SC colony in Ward No. VII of Ottoor Gramapanchayath.-Pipe line extension and giving water connections
Deposit work 2019-20 - District Panchayath Pathanamthitta -General - Project No.SO 11.20 - RWSS to Peringara - Replacement of old and damaged 110mm PVC pipe line with 160mm PVC and 110mm PVC 6kg.cm2 pipe line from Kuzhuvelippuram junction to church
Deposit work Mattathur. Pt -2021-2022 - Laying of 90mm PVC pipe line at Murikungal Ward 5 , Replacing existing damaged PVC pipe line with 90mm PVC pipe at Nooluvalli in ward 10 of Mattathur pt- General Civil Work
DEPOSIT-Urban agglomeration- Pipe line extension.-Deposit work-QWSS to Kollam (Annual project of Kollam corporation 2022- 23, Project no-496/23)--Extension of pipe line in various places of Divisions in Kollam corporation-CFC Tied fund
State Plan Supply and Laying pipe line at various places in Varkala Legislative Constituency Budget outlay under the Head in State plan 2021 2022 Supply Laying pipe line at various places in Pallickal Panchayath General Civil Work
DEPOSIT-2024 Replacement of corroded 25 mm GI pipe line with 40 mm GI pipe line from Kollamkunnu GLT to Olikkal area of RWSS to Muttom in Muttom GP Ward 5 6Muttom GP Project No. 183 25
Deposit work 2019-20 - District Panchayath Pathanamthitta -General - Project No.SO 11.20) Replacement of old and damaged 110mm and 90mm PVC pipe line with 160mm PVC 6kg.cm2 pipe line fromChetenkerikadavu junction to Roadukadavu -MLA road - in ward 1
pipeline
Deposit Work - Nedumangadu Block Panchayath - Pipe line extension of paravilakom road-Maruthummoodu-Thazhekunnathumala road in Aanad Grama Panchayath, Pezhumoodu-Nmbad-Kaliyil-Kalathukal palli road and Madavana -Darshana road in Karakulam Panchayath
776/22-23-Pangode ward Anashwara road bye lane Re-concreting and Pipe laying in Pangode ward
MP-LADS-Construction of Canal and Pipe laying works of Kaimukku Lift Irrigation Project of Kuzhur GP
kaduthuruthy valachira padom motor fixing and pipe laying deepening of mathamkari c block vachal in kaduthuruthy GP
Jal Jeevan Mission - Kunnathoor Panchayath Phase3 Package 1 pipe laying and Road restoration works at Kunnathoor Panchayath
Green Book - WSS to Ayroor - Kanjeettukara in Pathanamthitta - Phase II - additional pipe laying work in Mookkannoor area.
PULPALLY GP/VELIYAM MARAKAVU WATER SUPPLY SCHEME PIPE LAYING AND TANK CONSTRUCTION, WARD 17, PRO NO 268
Restoration Work from Mulavana Kaithakode Road due to Njankadavu Pipe laying From ch1/770 to 2/800
Annual Plan-Vechoor GP Project No 155/23- 24-Pipe laying across Koduthuruth -mattam - SNDP- Valachakari road
DEPOSIT RESORATION Restoration work of Ravi karunakaran Road 2nd bit due to KWA Amruth New Pipe Laying