Loading…
Loading…
10,751 results • Best match
Proj no64Thidanadu Division 13th ward DRINKING WATER PROJECT PIPE LINE MOTOR INSTALLATION AND RELATED ACTIVITIES
Deposit Work- Malappuram Municipality-MWSS to Malappuram - Pipe line extension to Various places -Phase-III
Annual Plan-PR.NO. 502/25-26-Pipe line extention to thonniyankavu road in ward 25
Peechi vazhani tourism corridor road development re establishing existing pipe line service In Madakkathara GP
Annual Plan LID EW Vadakkenchery GP 2025 - 26 Challithara DWSS pipe line extentionProject.No. 359/26
Kolachery WSS Zone 1 Deposit Work pipe line extension at Kakkari road in Keezhallur Panchayath
Alakode GP - Pro- No - 251- 2025-26-Therthally Drinking Water Project- Pipe Line Maintenance Works
project no. 78-Providing pipe line to pattammavudi lift irrigation scheme in Ayavana G P
Annual Plan-PR.NO. 563/25-26-Providing motor and pipe line at Model Girls school
JJM 2021 2024 Phase IV Pipe line extension and Providing FHTCs in Chirayinkeezhu Grama Panchayath
401/25-THRISSUR CORPORATION OLK ZONAL DIV 16-NEW DRAIN CONSTRUCTION IN PIPE LINE ROAD
Annual Plan-2023-24 Keezhattur GP - Project No 190/24-kozhisserikund DWS Pipe line extension
KDP 2020 21 Elanthoor Block Panchayathu Pipe Line Extension From Kallekuttam to Mambulli ColonyGrama Panchayathu
Arranging Drinking water facility, pipe line extension in LIFE Housing Complex Perinthalmanna Municipality 2020 21
PIPELINE EXTENSION
Fisharies - B.I.F.H.D.F ( 2018-19) - Providing 50 mm PVC Pipe line extension 500 m at various places of ward number 1, 2, 14 and 15 in Perinjanam grama Panchayath
Extension of pipe line in ward No 13 and 14 of Kanjikuzhy Panchayath
pipeline
Pipeline
Jal Jeevan Mission- Kannur District- WSS to Kolachery and adjoining Panchayaths- Phase 3 Common gravity main for 6 Panchayaths (Kolachery, Narath, Kuttiattoor, Mayyil,Munderi and Koodali) from WTP Chavasseryparamba to GLSR at Padikkunnu
Jal Jeevan Mission- Kasaragod District- Puthige Panchayath- WSS to Puthige Panchayath and Bela Neerchal villages in Badiadka Panchayath- Construction of OHSR , Laying Gravity main and distribution system and providing FHTCs in Puthige Panchayath
Jal Jeevan Mission (JJM)WSS to ChungatharaPothukalluEdakkara and Vazhikadavu Grama Panchayaths in Malappuram DistrictConstruction of 18 LL OHSR at Edakkara for Edakkara GP and Gravity main from WTP to this OHSRGeneral Civil Work
DEPOSIT-Deposit work Karunagappally M u n i c i p a l i t y - C W S S t o O a c h i r a ,Karunagappally,Alappad and Clappana - Extension of distribution pipeline with 90 mm PVC 6Kg/cm2 pipe in Division 13 of Karunagappally Municipality. -General Civi
MLA ADF - Providing pipe line extension to Punnodu-Pezhuvila road (In front of Punnodu Church) for a length of 180m in Navaikkulam panchayath
Deposit work-TVPM Dist Pt-Providing pipe line extension towards Kaduvakkuzhykkara-Kozhivilanjal and nearby areas in Kurinjilakkadu ward of Kallara GP
Painting of hydrant pipelines and their connected accessories at Calicut BP
JJM 2020 2021 Vechoor Panchayat Kottayam District Laying pipelines and FHTC
JJM-2020-21-Pallickathodu Grama Panchayat-Laying pipelines and Providing FHTC
Deposit work RWSS to Cheriyanadu Grama Panchayath Extension of pipe line in all wards of Cheriyanadu Grama panchayath
Pipe line extension and providing bulk water connection
MLA SDF Pipeline extension KSP WSS to Kumaranallor Pipeline extension in Nattassery Neelimangalam Road KPD Road near Mannath building in Ward No 6 of Kottayam Municipality
KDP Vechoochira Grama Panchayath Rwss to Vechoochira Pipe Line Extension in Ward 11 Malayalampadi Kakkudukka - Kakkudukka NSS Gatepadi Ward 12Mannadisala Punchirimukk road in Vechoochira Grama Panchayath
Construction of water tank and laying pipe line from existing pond
Pipe line extension to Kuravarukonam, Kandamam, Nmbad-Kuzhikkonam in Karayalathukonam ward , KKV Nagar to Sixth stone -Ennasery rod,Nilami-Chirathalakkl-NSS karyogam, Kezhekklayam-KKV Nagar-kalagramam,Eanikkar,Tharatta road
State plan supply and laying pipe line at various places in Varkala legislative constituency budget outlay under the head in state plan 2021 2022 supply laying pipe line at various places inVettoor panchayath General civil work
Jal Jeevan Mission JJM CWSS to Vattavada panchayath in idukki district Supply and Laying of Raw Water Pumping Main in Chilanthiyar Zone-General Civil Work
Pro.No.071 25-26 Charapuram Drinking Water Project Pipe Line Maintenance Ward 7 of Kuravilangad G P
Interconnection of pipe line from Kumbalampoika High School to Thalachira Colony District Panchayathu Interconnection of pipe line from Kumbalampoika High School to Thalachira Colony
CWSS to Kallara Pangode Running contract 2019 20 Leak rectification works of variuos sizes of pipe line for one year
Jal Jeevan Mission JJM Mattthur Grama panchayath Phase 1 RWSS to Kavanadu Replacing the existing old Pumping main distribution line with 160mm PVC pipe
KIIFB RWSS TO KODIYATHUR PHASE 1 RELAYING PART OF PUMPING MAIN AND PART OF DISTRIBUTION LINE FROM THEYYATHUMKADAVU TO CHULLIKKAPARAMBA ROAD AT KODIYATHUR GP
Eramam Kuttur GP - Project No.180/2021-22 - Construction Overhead Tank, Pump House, Pumping Main and Distribution Network for Kannadipoil Drinking Water Supply Scheme
STATE PLAN 2022 23 Survey and investigation Survey of New Distribution and Pumping main at Tirurangadi Municipality for Enhancing water connection through various schemes
JJM 2020 21 WSS TO VAKATHANAM PANCHAYATH REPLACING 250 MM CAST IRON PUMPING MAIN TO KUMARANALLOR ON VELLOPARAMBU BRIDGE BY 250 MM MS PIPE
JJM CWSS TO IDUKKI KANJIKKUZHY VAZHATHOPE MARIYAPURAM KAMAKSHI VATHIKUDY AND VANNAPPURAM SUPPLY AND ERECTION OF FLOATING PUMP AND RAW WATER PUMPING MAIN PACKAGE I
O and M - Water Supply Schemes-Annual maintenance for the year 2025-UWSS to Perinthalamanna - Leak rectification work of Pumping main and Distribution system
State Plan 2024 25Survey and Investigation WSS to Kanhangad and Nileswar Municipalities in Kasaragod District Surveying of Transmission main and pumping main Investigation Work
ANNUAL MAINTANANCE OF RWSS TO MUTHUKULAM -2024-2025-LEAK RECTIFICATION WORKS IN PUMPING MAIN/DISTRIBUTION LINE UNDER MUTHUKULAM PANCHAYATH FOR THE YEAR 2024-2025
ANNUAL MAINTENANCE OF RWSS TO CHERUTHANA PANCHAYAT 2021-2022- LEAKRECTIFICATION WORKS IN PUMPING MAIN / DISTRIBUTION LINES UNDER CHERUTHANA PANCHAYAT FOR THE YEAR 2021-2022.
Annual maintenance 2021-22- Leak rectification works in pumping main and distribution system of RWSS to Elamkulam, WSS to Thazhekode- under P.H Section, Perinthalmanna