Loading…
Loading…
1,94,610 results • Best match
RECALL-Bohla Providing FHTC with distribution pipeline in village Bohla under JJM Coverage Providing FHTC with distribution of pipeline in Village Bohla
Laying of distribution pipeline in newly developed areas and replacement of old age pipeline along with other ancillary work under Bhawanipatna Municipality
Lowering Laying Jointing Water supply Distribution Pipeline at ward no.17 For Replacing Old Pipeline At Madhavnagar Road Lale Plot indraprasthnagar sangli.
Replacement of 100mm dia AC distribution pipeline with 160mm dia HDPE pipeline at Rotary nagar in 45th division of Circle-I area
Laying Pipe Line from The Submersible Near h/o Swadesh Maity towards h/o Nimangshu Maity at Pa Abasberia San-2. JL. No.- 97, Plot No.- 381 - 410
Laying Pipe Line from The Submersible Near h/o Harish Chandra Singha towards h/o Kartik Singha at Hinchageria San-12. JL. No.- 147, Plot No.- 1350 - 1426
Laying Pipe Line from The Submersible Near h/o Mrinal Bera towards h/o Rathikanta Bera at Pa Abasberia San-2. JL. No.- 97, Plot No.- 646 - 726
Laying Pipe Line from The Submersible Near h/o Palash Maity towards h/o Sukumar Mandal at Pa Abasberia San-2. JL. No.- 97, Plot No.- 742 - 830
Permanent Road Restoration works Bituminous Road Works for Laying of Distribution Pipe Line for Zone- I to VIII (i.e. all zone) and Clear Water Rising Main Pipe Line, TW to OHRS within Nalhati Municipality Birbhum
Inter connection of existing OHR and Rising main by D.I. Pipe line with shifting existing running D.I. Pipe line within zone I, OHR (new) site Ward no 24 in Santipur Municipality under 15th FC Tied.
Laying of pipe line, constrction of OHT with other ancillary works for PWS to village Dalki in Bonai block
Providing and fixing HDPE 63mm o/d pipe line in village Swamika for Connecting SBS from rising main and all other works contingent thereto
Repair To Distribution System Pipe Line At.Shindwadi Dist.Satara
Panghat and pipe line karya Sarewadi G.P.Rachheti,P.S.Amet
EOR to Tihar Jail, New Delhi. (SH- Replacement of damaged G.I./C.I. water pipe line with CPVC pipe line in New Residential Complex (Type-V, Type-IV Block 1, Type-III Block 1, 2 and 4).
B.T. PATCH WORK FOR DAMAGED ROADS FOR WATER SUPPLY PIPE LINE ROAD CUTTING, WASTE WATER PIPE LINE, OFC CABLES POT HOLES AND DAMAGED CULVERT, APPROACHES TO OTHER POT HOLES AT 14 TO 26 DIVISIONS IN KMC.
Construction of Drain and Passage and Laying Water Pipe Line and Seating Arrangement at Biju Chakaldas Ghat, Banganga and Laying Drainage Line and Fixing Ladikaran and Water Supply Pipe Line and Seating at Ramnath Dhobhighat, Bangana
Providing and Laying new water pipeline in Warli pada under magaswargiya nidhi
Replacement of existing damaged 110 mm PVC distribution pipeline with 110 mm HDPE distribution pipeline due to contamination from drain cross-connection with MS pipe in Ward No. 82 of Anakapalli Zone, GVMC, under Summer Action Plan 2026
Replacement of existing damaged 110 mm PVC distribution pipeline with 110 mm HDPE distribution pipeline due to contamination from drain cross-connection with MS pipe in Ward No. 82 of Anakapalli Zone, GVMC, under Summer Action Plan 2026
Estimate for Providing and FHTC and laying of pipe line in village Devigarh Poonia isar Laying of four Inch id DI pipe line making the FHTC including CI DI special and GI special and all other contingent thereto Under J JM Category I
Estimate for Providing and FHTC and laying of pipe line in village Mangali Surtia Hisar Laying of four inch id DI pipe line making the FHTC including CI DI special and GI special and all other contingent thereto Under JJM Cate 1
Estimate for Providing and FHTC and laying of pipe line in village Mangali Aklan Hisar Laying of four inch id DI pipe line making the FHTC including CI DI special and GI special and all other contingent thereto Under JJM Cate 1
Mundahera - Estimate for providing functional household tap connections (FHTC) and laying of pipeline under JJM Programme in village Mundahera, constituency Jhajjar, Block Salhawas Tehsil and district Jhajjar
1)WATER PIPE LINE FROM GOBARDHAN DHARA TO SANTANU MANNA (MANI MAITY) AT BARUIPUR PURBA UNDER CHISTIPUR-II GP
Laying of Water pipe line from Internal lanes of Chandra Reddy Nagar colony and Anjaneya towers Colony at ward No.6 in Badangpet Municipality under General Funds 2018-19.Laying of Water pipe line from Internal lanes of Chandra Reddy Nagar colony and Anjaneya towers Colony at ward No.6 in Badangpet Municipality under General Funds 2018-19.
Laying of 200mm dia DI water pipe line from H.No.8-3-229/D/51 to H.No.8-3-229/V/S-7 and 150mm dia DI water pipe line from H.No.8-3-229/D/2 to 8-3-229/D/15/E/607 Venkatgiri, Jubilee Hills under Jubilee Hills Section, SD-I, O and M Division No.VI.
Construction of LIS for Ist phase of the Lower Penganga Project including Approach Channel, Pump house, Pumping Machinery, Rising Main with Manifolds, Gravity Main, Anti-surge Devices, Delivery Chamber, Approach Roads, Mech. Comp. etc.
Laying and fitting of GI pipe of dias 80mm (M), 65 mm (M) , 50mm ,40mm,32 mm ,25mm,20mm and 15mm dia Rising main, Gravity main and distribution system under WSS Pidi Jandrola NRDWP
Restoration of rain damages of LWSS in GP Bhula Bharyara, pipli, Drubbal and Drahal in Tehsil Joginder Nagar Distt Mandi HP SH Laying jointing , carriage and testing of Rising main, gravity main pumping machinery
DRINKING WATER PIPELINE EXTENSION
drinking water pipeline extension
JACK PUSHING OF DIHIKA RISING MAIN PIPE LINE BY 800 MM DIA DI CARRIER PIPE LINE WITH 1200 MM DIA DI CASING PIPE LINE INCLUDING SUPPLY, FIXING ALL NECESSARY DI FITTINGS BY JACK PUSHING METHOD UNDER RAILWAY TRACK OF SOUTH EASTERN RAILWAY NEAR HARAMDIH
Replacement of PSC pipe line in between Ch.No. 423.00 to 424.00 with MS Pipe line on Phase-III gravity main of 1200mm dia from Singapur to Lingampally under Singapur Section, Sub-Division III, O&M Division VIII, Patancheru
Realignment of 450mm CI pipeline from Medavakkam mainroad to Keelkattalai UGSS pumping main Zone III
Providing for Pipeline for Pumping Main at Chellaiah Kollai toAD Colony OHT in Oonangudi Panchayat
BALASAR LAYING OF 12 INCH RCC PIPE LINE (WASTE WATER PIPELINE) FROM (1) H/O MUNSHI RAM TO POND (2) PAX SOCIETY TO POND AT VILLAGE BALASAR BLOCK RANIA DISTT SIRSA (gp)
Kasni Providing FHTC, laying of distribution pipeline, special repair of 2 Nos. S.S Tank, H.L.T, C.W.T, Filter Beds, providing filter media, Pump Chamber, Boundary Wall, Pumping Machinery and all construction of 1 No. Toilet Bathroom.
Recalled tender notice Amadalpur Providing functional household taps connections and laying of pipe line under JJM. Laying of 4 inch DI water supply pipe line including DI CI specials and Functional House hold tap connection in village Amadalpur.
Recalled tender notice Salodha Providing functional household taps connection and laying of pipe line under JJM Laying of 4 inch DI water supply pipe line including DI CI specials and Functional House hold tap connection in village Salodha.
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Mehrawana Water Supply Scheme etc. complete.
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Indroli Water Supply Scheme etc. complete.
Jal Jeevan Mission JJM-Phase- 4 Gravity main laying from DB College to proposed tank site in Chemmanakary- Pipeline Work
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Sijla Water Supply Scheme etc. complete.
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Mindal Water Supply Scheme etc. complete.
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Gorcha Water Supply Scheme etc. complete.
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Bagni Water Supply Scheme etc. complete.
Source Augmentation, Construction of CWR, Gravity main, Distribution of pipeline and related works in Jaadi Water Supply Scheme etc. complete.
Providing pipeline overburden and protection works to the 1400mm dia. Salauli gravity main at chainage 1600.00 near Cotarli road crossing.
ward 20 construction of pvc pipe line from kaka nagar