Loading…
Loading…
4,069 results • Best match
Construction of pump house inc Providing and laying distribution of pipeline, construction of sluice Valve chamber, providing and installation of pump and motor at Jogarai Para under DWS Sub-Division Kumarghat
Extension and Mtc. of Pipeline from Muhuripur PWD Road to Nakul Sen house under Charakbai GP within the jurisdiction of DWS Sub-Division, Jolaibari during the year 2025-26 (FFC Work).
Construction of 09(Nine) nos Small Bore Deep Tube Well including extension of pipeline FHTC with post and platform under JJM at different locations under Padmabil DWS Sub Division (Gr-III).
Construction of 09(Nine) nos Small Bore Deep Tube Well including extension of pipeline FHTC with post and platform under JJM at different locations under Padmabil DWS Sub Division (Gr-II).
Special mtc. Of LI Scheme at Rangamati 1 under Water Resource Sub- Division Melaghar during the year 2025-26_ Repairing_ Replacement of old pump set and repairing UPVC pipeline distribution system.
Urgent FDR-Restoration of different L.I schemes under Pecharthal RD Block under Water Resource Sub-Division Kanchanpur North Tripura during the year 2024-25-SH- Repairing and extension of UPVC pipeline
Annual Mtc of different L I Schemes under Pecharthal R D Block under W R sub Division Kanchanpur North Tripura during the year 2026 27 SH Repairing of pipeline and Leakages
Construction of DTW scheme at Corer par under South Kalamchora GP of Boxanagar RD Block of Sepahijala district SH Laying of PVC pipeline and allied work during the year 2020 21
maintenance of CI/DI/PVC pipeline including brickwork, PCC work, RCC work etc complete at different existing water supply scheme under manu R.D Block under DWS manu Sub- Division( Gr-I)
Extension of water supply Pipeline from Joydeb Das house to Milan Nama house at Latuatilla GP within the jurisdiction of DWS Sub-Division, Jolaibari during the year 2026-27(FFC Fund).
maintenance of CI/DI/PVC pipeline including brickwork, PCC work, RCC work etc complete at different existing water supply scheme under manu R.D Block under DWS manu Sub- Division( Gr-II).
Replacement of new pipeline at different uPVC dia, sluice valve, FHTC of Hydrant post and platform and other allied works etc under DWS Sub-Division Salema during the year 2025-26
Replacement of new pipeline at different uPVC dia, sluice valve, FHTC of Hydrant post and platform and other allied works etc under DWS Sub-Division Salema during the year 2025-26.
Providing and Laying Rising and Distribution Pipe line, Construction of Infiltration Well, Construction of Boundary wall etc. / Gr-II
- Providing and laying raising and distribution pipe line, Construction of boundary wall, Toilet block etc./ Gr-IV (2nd Call)
Supplying and fitting fixing of different dia D.I. special and Butterfly/ sluice valves in AMC South Zone area under DWS Sub-Division-II, Milansangha, Agartala.
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to the DNIe-T
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Mtc. and repairing of Pipeline leakage, Washing at Bankul Mahamoni, East Manubankul, Magroom, Rupaichari, South Manubankul, Kathalchari, under Rupaichari R.D Block within the DWS Sub-Division, Rupaichari during 2025-26.(Gr.-II)
Construction of 02 Nos. SBDTW by mini drilling rig machine and extension of pipeline from Chagaldema BOP to Halambari BOP under DWS Sub-Division, KLS during the year 2020-21 Deposit Fund
UWS Scheme 2023-24/SH- Extension, Remodelling of Pipeline and Providing domestic Connection including all allied works from PC Roychoudhury petrol pump to BOC para within the area of Dharmanagar Municipal Council
Extension and remodeling of existing pipeline in old DTW scheme and providing FHTC in different GP/VC under BC Nagar RD Block under DWS Sub-Division Barpathari during the year 2025-26.
Construction of RCC platform with hydrant post in/c required pipeline extension, with fittings etc. under JJM under the jurisdiction of DWS Sub-Division Teliamura during the year 2023-24 (Gr-III).
Construction of SBDTW with overhead water tank and providing pipeline to the kitchen and toilet of Phani KP JB school of Chawmanu RD Block under Manu RD Div, 2021-22.(2nd call).
Cnstructn 02 Nos. SBDTW at Paschim Dhajanagar/ SH- instlltn Submrssble mtr alongwth Prvdng, layng Pipeline distributn in/c othr allied wrks undr DWS SD-II, UDP durng yr 2024-25(Deposit fund)
Maintenance and repairing of Pipeline leakage, Washing, mtc. of hydrant including. of existing DTW schemes at Rupaichari-Baishnabpur sector under Rupaichari R.D Block under DWS Sub-Division, Rupaichari, Sabroom during 2024-25.
Construction of RCC platform with hydrant post in/c required pipeline extension, with fittings etc. under JJM under the jurisdiction of DWS Sub-Division Teliamura during the year 2023-24 (Gr-I).
UWS Scheme 2024-25/SH-Extension, Remodelling of Pipeline and Providing domestic Connection including all allied within the area of Dharmanagar Municipal Council area at kathaltilla, Asramroad, Lobnath lane, Sarnamoyee lane etc
Running Mtc. of pipeline leakage, blockage, lowering, lifting and rewinding of burnt pump-motor sets, column pipes reapair and replace of starter, mainswitch and other allied works under DWS Sub-Division Kamalpur
JJM Scheme SH Sinking of 10 Nos. SBDTW by manual means in/c. laying of delivery pipeline, FHTC complete at different location under DWS Sub-Division, Ampi during the year 2020-21
Construction of 1 No. SBDTW in/c Pipeline at Gamaria health sub-centre at Gamaria V.C undr Matabari R.D. Block undr DWS SD-II, Udaipur, Gomati Tripura during the year 2024-25.
Construction of RCC platform with hydrant post in/c required pipeline extension, with fittings etc. under JJM under the jurisdiction of DWS Sub-Division Teliamura during the year 2023-24 (Gr-IV).
NRDWP Scheme under DWS Division Dharmanagar during the year 2019-20 / SH - Providing Laying of different dia UPVC Pipeline in/c. all allied works within the jurisdiction of DWS Sub-Division Dharmanagar.
Construction of 10 (Ten) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with hydrant post and platform with other allied works under uncovered Schools of DWS Sub-Division Tulashikhar
Construction of RCC platform with hydrant post in/c required pipeline extension, with fittings etc. under JJM under the jurisdiction of DWS Sub-Division Teliamura during the year 2023-24 (Gr-II).