Loading…
Loading…
4,071 results • Best match
JJM Sch SH Const of 2Nos. SPPH, instal of pump motor, extens of pipeline and FHTC incl. other allied works etc complete in all respect at Bazar Para and Bagabasa-II under DWS Sub-Division N0-II during the year 2020-21.
Retrofitting of Water Supply scheme to the existing DTW at Surjakanta para an DTW scheme at Pancharatan para under Ranirpukur VC by providing and placing PVC storage tank and laying of DI/PVC pipeline,installation of submersible Pump set and other al
JJM Sch SH Const of 2Nos. SPPH, instal of pump motor, extens of pipeline and FHTC incl. other allied works etc complete in all respect at Biren colony and School para under DWS Sub-Division, N0-II during the year 2020-21.
Water supply scheme under JJM under DWS Division , Kumarghat during the year 2023-24 SH Construction of 28 nos steel staging with 5000 ltr pvc tank including pipeline for school AWCs of Gournagar RD Block under DWS Sub-Division, Kailashahar Gr-II
JJM Sch SH Drilling and deve of 4 Nos. SBDTW by manual means incl install of pump set,electrical panel board and providing,laying of delivery pipeline,FHTC etc. complete at diff. places under Amarpur DWS S.D, during the year 2021-22.
Retro of JJM Sch under Silachari Block/SH Augmentation of DTW sch by extension, remodeling pipeline, mtc. of pump, providing and installing of pump motor inc other allied works etc. at Kaptali Para under DWS SD, Karbook during the yr 2021-22.
JJM Sch SH Drilling and development of 15 Nos. SBDTW by manual means incl. install of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D,during the year 2021-22(Gr-VIII).
JJM Sch SH Drilling and development of 15 Nos. SBDTW by manual means incl. instal of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc at diff places of Amarpur DWS S.D, during the year 2021-22(Gr-VI).
JJM Sch SH Drilling and development of 10 Nos. SBDTW by manual means incl. install of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D, during the year 2021-22(Gr-II).
Running mtc of existing water supply scheme under Sepahijala district./ SH Leak mtc of pipeline attached to existing DTW and SBDTW schemes in/c some other allied works in Mohanbhog RD Block under the jurisdiction of AE DWS Sub-Division, Melaghar duri
JJM Sch SH Drilling and development of 15Nos. SBDTW by manual means incl. install of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D, during the year 2021-22(Gr-II).
JJM Sch S.H Sinking of 5nos. SBDTW by mnl mns incldng installtn of p.motor set, elec equpmnts in M.S. KIOSK and providing,laying of delivery pipeline commission etc. at Eklavya Residential Schl KBK under DWS S/D KBK during the yr 22-23.
JJM Sch SH Constr of 2 Nos. S.P.P.H, instal of pump motor, exten of pipeline, FHTC and in/c. other allied works etc complete in all respect at different location under DWS Sub-Division, Ampi during the year 2021-22 (Gr. No. II).
JJM Sch SH Constr of 2 Nos. S.P.P.H, instal of pump motor, exten of pipeline, FHTC and in/c. other allied works etc complete in all respect at different location under DWS Sub-Division, Ampi during the year 2021-22 (Gr. No. III).
Construction of SBDTW with overhead water tank and providing pipeline to the kitchen, toilet of 1) 90 kani JB school 2)Adharchan Roaja JB school 3)Aghore Sarkar para JB school 4)Lalcherra Nutan bazar JB school under Manu RD Div, 2021-22.
JJM Sch SH Drilling and development of 15Nos. SBDTW by manual means incl. install. of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D, during the year 2021-22(Gr-I).
Running mtc of existing water supply scheme under Sepahijala district./ SH Leak mtc of pipeline attached to existing DTW and SBDTW schemes in/c some other allied works in Jampuijala RD Block under the jurisdiction of AE DWS Sub-Division, Takarjala du
JJM Sch SH Drilling and development of 15Nos. SBDTW by manual means incl. install of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D, during the year 2021-22 (Gr-IV).
Retro of JJM Sch under Ampi Block SH Exten and re-modelling of pipeline, constrt of masonry chamber at Debendra P. DTW,Gandhek Malsom P. DTW and Radhanagar P. DTW Sch respectively under Ampi DWS S/D during the yr 2020-21.
JJM Sch under SH Const of 2Nos. SPPH, install of pump motor, exten of pipeline and FHTC incl. other allied works etc complete in all respect at Nuabari and Khilpara tilla under DWS S/D, N0-II during the yr 2020-21.
JJM Sch SH Drilling and develop of 5 Nos. SBDTW by manual means incl. instal of pump set,electrical panel board and providing,laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D during the year 2021-22(Gr-II).
RWS /JJM /RIDF Schemes in North Tripura District under 15th FC/State Fund during the year 2022-23/SH- Maintenance of CI/DI/PVC pipeline in/c allied works within the jurisdiction of Kalacherra block area under DWS Sub-Division, Dharmanagar/Gr.-I
JJM Scheme S.H Sinking of 15 nos. SBDTW by manual means incl instn of pump-motor set, elect equipments and providing ,laying of delivery pipeline,FHTC and commission etc. at different location under DWS SD Karbook during the yr 2021-22(Gr-III)
Imp of Tourist spot from Amarpur to Chabimura and having access to eco-Tourism Centre/Dismantling, relaying and providing fitting fixing of new water supply pipeline in/c all allied works etc.under DWS Sub-Division, Amarpur during the year 2020-21(de
Retro of JJM Sch/S.H Augmentation of different DTW Sch under Tepania Block by extention of pipeline and other allied works etc. at DTW at i)Amtali banduar, ii) Amtali Chandrapur, iii) RF Tilla iv). Hadra-II scheme during the year 2020-21.
Extn. of Domestic WS Supply Connection to the individual house hold under Atal Jaldhara Mission incl. extn of PVC pipeline from different ws schemes etc complete in Amarpur RD Block area undser D.W.S Sub-Divn Amarpur during the year 2020-21(Gr-X).
JJM Scheme S.H Sinking of 15 nos. SBDTW by manual means incl instn of pump-motor set, elect equipments and providing ,laying of delivery pipeline,FHTC and commission etc. at different location under DWS SD Karbook during the yr 2021-22(Gr-V)
JJM Sch SH Drilling and development of 15 Nos. SBDTW by manual means incl. install of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D, during the year 2021-22(Gr-IX).
JJM Scheme S.H Sinking of 15 nos. SBDTW by manual means incl instn of pump-motor set, elect equipments and providing ,laying of delivery pipeline,FHTC and commission etc. at different location under DWS SD Karbook during the yr 2021-22(Gr-IV)
JJM Sch SH Drilling and development of 15 Nos. SBDTW by manual means incl. instal of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff. places of Amarpur DWS S.D, during the year 2021-22(Gr-V).
JJM Sch SH Drilling and develop of 5 Nos. SBDTW by manual means incl. install. of pump set, electrical panel board and providing,laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D during the year 2021-22(Gr-I).
Extn. of Domestic WS Supply Connection to the individual house hold under Atal Jaldhara Mission incl. extn of PVC pipeline from different ws schemes etc complete in Amarpur RD Block area undser D.W.S Sub-Divn Amarpur during the year 2020-21(Gr-VII).
Renovation of DTW Scheme at Mokam under Purba Kunjaban GP of Kalyanpur Block under W.R Sub Division Teliamura during the year 2021 22 SH Providing and Laying of PVC distribution system, repareing of existing PVC pipeline and other allied Works Job no
Water supply scheme under JJM under DWS Division , Kumarghat during the year 2023-24 SH Construction of 28 nos steel staging with 5000 ltr pvc tank including pipeline for school AWCs of Gournagar RD Block under DWS Sub-Division, Kailashahar Gr-I
JJM Sch SH Drilling and development of 15Nos. SBDTW by manual means incl. install of pump set, electrical panel board and providing, laying of delivery pipeline, FHTC etc. at diff places of Amarpur DWS S.D, during the year 2021-22 (Gr-III).
JJM Sch under Gomati District SH Const of 2Nos. Semi Permanent Pump House, installation of pump motor , extn of pipeline and FHTC incl. other allied works etc. at Maidabari and Puktapal para under DWS Sub-Division, N0-II during the year 2020-21.
Extn. of Domestic WS Supply Connection to the individual house hold under Atal Jaldhara Mission incl. extn of PVC pipeline from different ws schemes etc complete in Amarpur RD Block area undser D.W.S Sub-Divn Amarpur during the year 2020-21(Gr-IX).
PDF/FFC/Other Panchayet fund 2025-26/SH- Drilling and development of 1no SBDTW by manual means in/c installation of pumpsets electrical panelboard, pipeline etc at Madhyabagan Boro Akhra (W-6)at Baghan GP of DWS Sub-Division Dharmanagar (2nd Call).
Mtc. of of L.I scheme at Baniacherra-II under Mohanbhog R.D Block under W.R Sub-Division , Melaghar during the year 2025-26/SH_ Installation of new pump motor and repairs of pump motor and panel board equipments mtc. of pipeline and pump house
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc. under DWS Sub Division Kanchanpur NH 44 to Jamarai para Dist North Tripura Package TR0307 P4 during the year 2026 27Gr III
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc under DWS SubDivision Kanchanpur NH 44 to Jamarai para Dist North Tripura Package TR0307 P4 during the year 2026 27GR IV
RWS/PDF/FFC/NDRF /NRDWP/RIDF/other Panchayet fund under DWS Division Dharmanagar 2025-26/SH-Const./drilling of SBDTW at Tarakpur HSC-AAM in/c installation of pump set electrical panel board, pipeline etc at Tarakpur GP of DWS Sub-Division Dharmanagar
Mtc. of pipe line of different OHT, Delivery line, mtc. of domestic connection etc. under G.S. Section and other allied works under DWS Sub-Division No.I, Collegetilla,Agartala.
Maintenance of RGM Hospital Kailashahar Unakoti Tripura SH Repairing of plaster sanitary pipe line and water supply line water proofing treatment of roof construction of outside drain etc complete
Borring and lowering of tube well along with motor connection and pipe laying and other allied works at 5(five) nos. water tank constructed by AMC in different locations. (Deposit Work)
JJM Sch under Gomati District SH Const of 2 Nos. Semi Permanent Pump House, instln of pump motor , extn of pipeline and FHTC incl. other allied works etc complete at Basan Khola and Rangachandra para under DWS SD, N0-II during the yr 2020-21.
JJM Sch S.H Sinking of 15 nos. SBDTW (150mm x 100mm) by manual means incl instan of pump-motor set, elect equipments and providing ,laying of delivery pipeline, FHTC etc. at diff location under DWS S.D Karbook during the year 2021-22(Group-I).
JJM Sch under Ampi Block/SH Const of 1No.Semi Permanent P/House, installation of pump motor, extension of pipeline and FHTC in/c. other allied works etc complete in all respect at different locations under DWS SD, Ampi during the yr 2021-22.(Gr-IV)
WSS undr JJM in Gomati Tripura/ SH- Cnstructn 03 nos. Semi Permanent PH, prvdng, instlltn pump sets, prvdng, layng pipeline, prvdng FHTC to individual household in/c othr allied wrks in MTB RD Blck undr DWS SD-II, UDP durng yr 2024-25 (Gr- II).
WS scheme of JJM in 2022-23/SH- Providing PWS with running water to school AWCs/Const. of SBDTW 10 Nos, Ext. of Pipeline, Providing, installation of Pump Motor PVC storage reservoir etc of Kalacherra R.D Block of DWS Sub- Division Dharmanagar/Gr-III