Loading…
Loading…
13,304 results • Best match
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (95) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sahjanwa Block at Jagdishpur W/S Scheme
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (75) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sahjanwa Block at Bhagaura W/S Scheme
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (750) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sardarnagar Block at Chauri part 2W/S Sch
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (850) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in SardarnagarcBlock at Chauri part 1W/S Sch
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (530) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sardarnagar Block at Bhaupar W/S Scheme
REPAIR MAINT OF WATER SUPPLY PUMPS INCLUDING REPAIRS OF CHLORONOME PLANTS SUPPLY OF CHEMICALS WATER SUPPLY PIPE LINE AND RISING MAINS INCLUDING CLEANING OF OVER HEAD TANK AND UNDER GROUND SUMP AND OTHER MISC WORKS AND REPAIRS TO PANEL INSTALLED AT WA
Maintenance of distribution pipe line work at Zone-5 and 6 (Sector KP-1, 2, 3, 5, Ecotech-2 (Udyog Kendra), 3, 12, Toy City, Ecotech-1 Extn., Ecotech-1 Extn.-1, Swarn Nagari, Sector-2, 3, 10) for three years, Greater Noida
ward no. 15 mein shree rashid ke makan se shree yakub ki dukun tak and saleem kasim se irfaan tak and shamsher ke makan se dr. nazim ke makan tak lagbhag 350 meter 100 mm paani ki pipe line bichnaane ka karye
WARD NO-08 NAHAR ROAD SRI LAKSHMAN GUPTA SE SRI VINOD YADAV TAK, SRIMATI SAROJ TIWARI KE GHAR SE KAMLESH YADAV KE MAKAN TAK, SRI SPRING DEM SCHOOL SE SRI RAVI DIXIT KE MAKAN TAK 3 INCH PIPE LINE VISTAR KARYA 170 METER.
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (642) in New / Existing W/S Distribution main and appt. works with all materials, labour, T andP etc. complete in Sardarnagar Block at Bal Buzurg W/S Scheme
Extension/Re. of LT Line, S/F LED Light on 16 Metre H. M. Light 04 Nos, S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos. 4KVA Steblizer, GI Pipe line and cabling work at NMY Nanpara Distt. Bahraich.
Laying of 110mm HDPE Pipe line Moh. Chahashiri B-16 Ward no-15 main From Subhash Agarwal house to Sarvjeet Saksena house length-41mtr/From Pramod Sharma house to vipin house length-60mtr/Sai Puram colony Ward no-15 main From Gourav ho
Moh Madar Gate Mein Soham Tau Gate se Kumarpal Ke House tak, Soham Tau Ashram ke Piche gate se Chaudhary ke house tak, Rajoriya ke house se Mithlesh ke house and smt Maya Sharma ke Aahate tak Pipe Line Dalne ka work
Laying of 110 mm HDPE Pipe line From Ward no-04 Moh. Kassaban Reti from Chandrapal house to lalita house length-50mtr / Hadishaha Masjid Wali gali main from Rajesh house to Abid house length-46mtr/ From Nadeem House to Abid house len
WARD NO 12 CHHATU GUPTA KE MAKAN SE MANNA JAISWAL KE MAKAN TAK, DEVENDRA MISHRA SE DURGA GUPTA TAK , JANTA SAMIYANA KE MAKAN SE GUPTA KE MAKAN TAK, AMBEDKAR NAGAR PARK SE RAKESH BHARTI KE MAKAN (RAMGULAM TOLA) TAK PIPE LINE VISTAR KARY
Laying of 110mm HDPE Pipe line Ward No-02 Moh. Jatan Jalalpur Road per Raju Chai Wale ke baraber wali gali main from Mahaveer house to Ramparsad house length-120mtr/Valmiki Park se aage From Atar singh house to Kalash singh house leng
Laying of 90mm HDPE Pipe line From star market at main gate to shameem godam moh bhatana length 50mtr/ ghyan chand house to shushil house moh-jatan B-3 length 36mtr/ ramkaran house to harpal house moh- kazipada length 128 mtr/ thaman
Laying of 110mm HDPE Pipe line Baskshiwala Road Ward No-11 Irshad Colony ki pehli Gali main Aadil house to Irshad colony ki gali Tak length-148mtr/ From Aadil house to Zeenat cosmetic ki shop length-45mtr/From Main road to Tariq house
SUPPLY LAYING AND COMMISSIONING OF 17.8 KM LONG ASBESTOS CEMENT BY MAZZA PROCESS PN-7.5 CLASS -15 PRESSUR PIPE LINE OF DIFFERENT DIAMETER FOR WATER DISTRIBUTION SYSTEM WITH ALL REQUERED ACCESSORIES AND TP TO COMPLETE THE WORK AS PER APPROVED L SEC
4216 jeernodhar/ sudharikaran ke antergat upper Dalibagh colony stith awas no- 12/1 Type 5 me bathroom me seelan marammat ka karya. Sewar chamber, marammat avem sewar pipe line badalne ka karya va 02 nag shatigrast darwaze badalne ka karya avam awas
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (150) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Brahmpur Block at Goplapur W/S Scheme
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (150) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sardarnagar Block at Dumari Khurd W/S Sch
Vikramaditya Marg sthit naya Upmantri aawas sankhya-10 me shatigrast 04 paani ki tanki badalna va tanki va supply tak jarjar pipe line badalna avem aawas me chhat se aa rahi seelan ko rokne hetu chhat par water proofing karna, shatigrast interlocking
S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at N. M. Y. Najibabad (Distt. Bijnaur)
10- Laying of 90mm HDPE Pipe line Veeru to Mukesh Verma, Rana Kunj to Subhaas, Rampal to Rahul, Tinku to Bhure, Banti Verma to Mukesh, Ballu to Golti, Mitlesh to mahendra, Parvesh to Suni Sharma House Moh. Ramleela ward No. 07 Jhalu
Laying of 90mm HDPE Pipe line From aakil house to ayyub and shameem ahmad house 82mtr ward no 24 latafat hussain house to noorpur road and chandrawali gali gangaram wali road lenght 300mtr santoshi mandir to naresh 252mtr faheem to ali sheer 232mtr
S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, Construction of 3 no. mini boring with 1HP submerssible pump, Pipe Line Connection, Cabling work at NMY Wazeerganj (Budaun)
Work no-05 Vijay nagar zone antargat ward-01 malin basti cristian nagar bagu me panchyat ghar ke pas gali no-04 va gali no-05 va sahayak galiyo me 110 mm vyas ki 760 meter HDPE payjal pipe line dalne ka karya
Laying of 110 mm HDPE Pipe line From Ward no-08 Moh. Chahashiri B-24 Moti Masjid Ke saamne wali gali main Mohsin Sabhasad house to Istekhar house length-103mtr/ from mobeen house to Saeed house length-40 mtr/ (Total length-143 mtr)
ward no 03 rakesh gupta ke plat se sanjay ke ghar tak kalicharan ke ghar se bachu ke ghar tak nagar panchayat karyalay se dr vidhyaram sharma ke makan tak chachiha road se vijendra ke makan tak aadi pipe line dalne ka karya
WARD NO. 02 SHREE IMTIYAZ KE GHAR SE SHREE AKARAM KE GHAR TAK, C.C ROAD SE AYURVEDIK HOSPITAL TAK, SHREE JITENDRA PANDEY SE ANAND YADAV TAK, AYURVEDIK HOSPITAL SE ETC SE DURBHASH TIWARI KE GHAR TAK 1517 METER PIPE LINE VISTAR KARY.
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (688) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Brahmpur Block at Kaithwaliya W/S Scheme
Surveying Soil investigation design and Supply of all materials labour T and P etc complete required for completion of following works of Extension of pipe line of Ghatampur Water Scheme on turn key basis Construction of Tube well Over Head Tank Pump
Mohalla- Ramnagar-01 Extension of water supply pipe line (11MN) in ajay pandey house to mata prasad yadav house and paras sharma house to radhe soni house and joshi house to visram yadav and chhotelal jaiswal house toNadder house up to Rajendra Mauri
Pipe line Extension- 63 mm Dia, Functional Household Tap Connection (FHTC) works (100) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sardar Nagar Block at Kewla Chak W/S Scheme
Expension and Maintaince Work 160 mm dia HDPE Pipe Line Nagar Panchayat Pakbara in (Ward No-08) Noor Alam Canteen Via Prathmik Vidyalay to kailsa road Umar mithai shop, umar mithai shop to Chaudhery Market kailsa road and Chaudhery Market to jama maj
Laying of 110mm HDPE Pipe line From Bullah chowk to Berrier and aara Machine mohalla Chahshiri ward 26 L 380 Mtr Liyaqat hosue To Saniyo ka mandir Mohalla Kazipara L 200 Mtr / gurudwara Road to Gurudwara L 250 cm Civil Line qward No
NAGAR PALIKA MAUDAHA HAMIRPUR KE ANTARGAT WARD NO 08 MUHALLA MARATHIPURA KI VIBHINN ANTRIK GALIYO ME PAYJAL VYAVASTHA HETU 90 MM PVC PIPE LINE VISTAR AWAM TATSAMBANDHI KARYA MAY SAMAGRI LEBAR T AND P TATHA NALKOOP CHALU KIYE JANE HETU VIDYUT SANYOJAN
Nagar panchayat Salempur ke ward No 3/4/6/9/10/13 me Pipe line wistar kary ewan 11/12/2 me 93 adada grih sayojan tatha wardn o 3/4/6/9/10/13 me 100 adada grih sayojan ka kary
WARD NO 30 DR.H S RAI SE BHOLA MALL KE DUKAN TAK, SHREE VIJAY SHANKAR SE NEHRU NAGAR PUMP KE SAMNE RAJA PRATAP SNGH TAK V AAGANBARI KENDR SE HARIHAR SAHI KE GATE K SAMNE TAK 300 METER PIPE LINE VISTAR KARYA
NAGAR PALIKA MAUDAHA HAMIRPUR KE ANTARGAT WARD NO 06 MUHALLA ILAHI TALAAB KI NIKAT BASTI ME PAYJAL VAYVASTHA HETU NALKOOP BORING PUMP HOUSE PUMPING PLANT THAT 150 MM DIK 07 RIJIGMAIN PIPE LINE VISTAAR AWAM TATSAMBANDHI KARYA MAY SAMAGRI LABER T AND
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (750) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sardarnagar Block at Phulwaria W/S Scheme
Vidhayak niwas -4 Royal hotel stith awas no. 19 me awas ke ek bathroom, shauchaley tatha kitchen ke tiles avem shatigrast fittings ko badalne ka karya, shatigrast darwazo ki chaukhat avem palle badalne ka karya, shatigrast GI pipe line badalne ka kar
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (1260) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Piprauli Block at Baghagada W/S Scheme
Vidhayak niwas 4 Royal hotel stith awas no 01 me awas ke chatigrast khidkiyo avam darwazo ke chawkhat avam palley badalne ka karya, khidki me aluminum ki grill lagane ka karya, madular kitchen banane ka karya, CI pipe line badalne ka karya, kitchen
Mohalla-Rani-01) extension of water supply pipe line (110MM) in purana hospital road to Shakeel Mhajan house and Islam house to Islam mistry house and Hafizurrahman house to Rajendra Mauriyan house and Sharma vati house to Siyaram house and Deepu med
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (1275) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sardarnagar Block at Baghar W/S Scheme
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (2250) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Brahmpur Block at Rajdhani W/S Scheme
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (1550) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Sahjanwa Block at Bhiti Rawat W/S Scheme
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (1750) in New / Existing W/S Distribution main and appt. works with all materials, labour, T and P etc. complete in Piprauli Block at Dumari Khas W/S Scheme