Loading…
Loading…
13,207 results • Best match
C/o 2Nos. tubewell with pump house and rising main RPS-02 in sec-22D,YEA
Strengthening of Sewerage ( Replacement of Damage 400 mm dia PSC Rising Main of SPS-55) Noida
Construction of New C.W.R. Tank , Deep Tubewell and Rising Main at Ghumra Jail Distt-Sonbhardra(U.P)
Strengthening of Sewerage (Replacement of Damaged 500 mm dia DI Rising Main of SPS-18) Noida.
Constructon of 02Nos Tubewell and supply Rising Main System for Gaur Yamuna City Scetor -19 YEA
Replacement / Repairing of Damaged Main Pipe Line of Mulsifier Pipe line system at 400KV Sub-station Bareilly
Work-9 (Pipeline) Rashtriye Rajmarg me kiye ja rahe chodikaran hetu pipe line ka vistar karye.
LAYING OF 110 MM DIA PVC WATER PIPE LINE WORK WARD 11
LAYING OF 110 MM DIA PVC WATER PIPE LINE WORK WARD 12
LAYING OF 110 MM DIA PVC PIPE WATER PIPE LINE WARD 04
Pipe line shifting,new pipe line laying,construction of drain
WARD-12/14 ME VIBHINNA ISTHANO PAR NEW PIPE LINE DALANE KA KARYA
Restoration Work on Road cutting for sewer AND water pipeline Repair OR Laying by the jal sansthan and jal nigam under the jurisdiction of Assistant Engineer VI
Hexagonal bush size 25x20 mm. spec. IS:1239 (Part-2) 2011 Tab. 27 AISI:304, (Material used for water pipeline bypass connection of EPPFS in LHB coaches).
Replacing 170 meters of damaged PVC drinking water pipeline of 110 mm dia in the lane of Dr. Sandesh Katiyar Ji situated in Geeta Nagar, Ward-52.
G.I. Nipple both side threaded size 15x100 mm. Thickness 3.4 mm, IS:1239 (Pt-1) 1990 Tab-2, (Material used for water pipeline connection in ICF coaches.)
G.I. Nipple size 25x75 mm. both side threaded, Drg. No. G/SD3-634 Item no. 4, (Material used in ICF coaches for water tank & water pipeline connection.)
Suply of Pipe Line Liakage items
pvc pipe line tubewell to muneem
Pipe Line work in mohalla Premchiraiya
Extension of pipe line in Gohand.
WORK NO 2 PIPE LINE VISTAR
Gohan - Jamrehi Sani Pipe Line Shifting
Rampura Nagar Pipe Line Shifting Work
Rampura Gramin Pipe Line Shifting Work
c.i. pipe line bichhane ka work
GI Pipe Line at Dariyapur Majhigawan
WARD NO-11 PIPE LINE VISTAR
Erection of Pipe line and accessories
WARD NO-03 PIPE LINE VISTAR
Solar Dual Submersible with pipe line
Konch Nagar Pipe Line Shifting Work
Mini Tubel, Pipe Line etc Work
gola ward pipe line work 1
Solar Dual Submersible with pipe line
dismantling and erection of pipe line
PIPE LINE AND PUMP INSTALLATION WORKS
Nagar wards pvc pipe line work
Pipe Line Extention In Npp Loni
WARD NO-12 PIPE LINE VISTAR
GI Pipe Line 950 Mtr Bairahana
BOQ (Q3) (Payjal pipe line vishtar)
PVC PIPE LINE REPAIRING MATERIAL (Q3)
BOQ (Q3) (Pipe Line leakage Material)
Pipe Line Ki Lekeage Repair Work
supply of cc pipe line item
AMBEDKARNAGAR ME HDPI PIPE LINE KARYA
SPARE PART OF PIPE LINE REPAIR
CC OF THE ROAD DAMAGED DUE TO LAYING OF PIPELINE FROM THE HOUSE OF MR. VINERA TO THE MAIN ROAD IN HARIPARVAT ZONE, WARD NO. 94, PROFESSOR COLONY. RESTORATION WORK BY (FFC FUND)