Loading…
Loading…
13,529 results • Best match
Annual maintenance of water supply schemes 2019,2020 Falling under Public Health Engg. Division No. 1, Karnal. Repair of pumping machinery of existing 22 Nos. tubewells/Boosting Station and all other works contingent thereto. For one year i.e., from
Maintenance of Water Supply distribution system in Sector-13 Bhiwani including EWS and Housing Board Area and all other works contingent thereto For a period of 3 months
Re-laying/shifting of damaged 100mm i/d D.I. water supply pipe line with D.I. Specials in Sector-1, U/E, Rohtak and all other works contingent thereto
Work of providing and fixing of D I specials of various sizes for repairing of water supply leakage in Sector 9 Bahadurgarh and all other works contingent thereto
Work of Providing and laying of DI specials for repairing of water Supply leakages at various locations of Sector 9 9A Bahadurgarh and all other works contingent thereto
Connecting water supply pipeline in Various Villages AWC in District
Teontha - Water Supply Scheme for installation of new tubewell against abandoned tubewell No.4 at village Teontha Tehsil and District Kaithal.
Revised R.C.E. for Providing Water Supply Scheme in U/A Village Patla in RGEC Sonipat i/c five years mtc. cost
Patti Dogran- Water Supply Scheme for installation of 1 No. Additional tubewell in Patti Dogran Shakti Nagar Tehsil and District Kaithal.
Bandrana-Water Supply Scheme for installation of new tubewell against abandoned tubewell No. 1 at village Bhandrana Tehsil and District Kaithal
Annual maintenance of Water Supply scheme in Sector 33 P, Hisar. Operate sluice valve and maintaining water supply system in Sector 33P, Hisar with watch ward of Boosting Station 24 Hours day and night complete in all respect and upto the entire
Annual maintenance of Water Supply Scheme in Sector 13 P, Hisar. Operate valve and maintaining water supply system with watch and ward of Boosting Station 24 Hours day and night in Sector 13 P, Hisar complete in all respect upto the entire satisfacti
Operation and Maintenance of ranney wells water supply Phase-I and II, Dadasia under water supply scheme for Faridabad Operation and Maintenance of 4 No. Ranney Wells at Dadasia, 1 No. Main Boosting Station at Dadasia, D.I. pipe line from Ranney to
Annual mtc. of Water Supply Scheme in Sector-33 P I Hisar. Repair of water supply leakage including excavation and refilling the trench, providing and fixing CID joints PVC pipe complete in all respect and all other works contingents thereto for the
Annual maintenance of Water Supply Scheme in Sector 13 P, Hisar. Operate valve and maintaining water supply system with watch and ward of Boosting Station 24 Hours day and night in Sector 13 P, Hisar complete in all respect upto the entire satisfacti
Annual Maintenance of Water Supply Scheme in Sector 27 and 28, Hisar. Hiring of JCB for excavation and refilling of earth for running the non functional water supply line from Main Water Works Tosham Road to Boosting Station , Sector 27 and 28, Hisar
Annual Mtc Water supply scheme Hisar Town Supply of water supply through water tanker for the resident at Dhandur Mirchpur Incident shiftied from Tanwar Farm House For the period 01/03/2022 to 30/09/2022 and all other works contingent thereto
Annual Mtc of Water Supply Schemes Radaur Town Town 2023 2024. Repair of Pumping Machinery of Existing Tubewells and all other works contingent thereto For One Year
Annual Mtc of Water Supply Schemes Yamuna Nagar Town for the year 2025-2026. S.U (For Eight Months) (Under PHE Sub Division No. 3, Yamuna Nagar) RECALL
Work of relaying of damaged water supply line by providing and fixing of DI pipes specials and repairing of leakages at various locations in Sector 11 and 13 Bahadurgarh
Repairing of 250 mm diameter water supply line width C.I. sluice valve, C.I. specials and baling out of water in Sector -62 Faridabad, and all other works contingent thereto
Providing and lowering, laying aligning fixing in position and jointing of D.I. pipe and C.I. specials for making the drinking water supply line leakage and clearing jungle including uprooting of rank vegetation, grass, brush wood, trees at boosting
Laharpur, Various Annual maintenance water supply scheme of Distt. Yamuna Nagar, ( Under PHESD Sadhoura), Providing and fixing CID joints, PVC pipes of various sizes for various water supply schemes under PHESD Sadhoura).
Ninan village providing and laying of DI pipeline, functional HH tap connection (FHTC) and repair of structure for water supply scheme Ninan. Laying of DI pipeline of size 4 inch and 6 inch dia, prov. New FHTC and repair of w.w structure for water
Construction of Pump Chamber of size 10x12 construction of boundary wall laying of IPB road and path , Rising main for connecting of tubewell providing and installation of electromagnetic flow meter of size 150 mm and online fully automatic
Interconnection of 500mm dia Ranney well line no-7 with 300mm dia supply line from sector-45 IBS near police chowki Greenfield colony, Faridabad.
Dismantling of 9No. RCC and 2 No. Brick Masonry existing abandoned OHSR
Drilling of Tubewell and Laying of rising main
Installation of tubewell Installation of tubewell
Installation of tubewell
Installation of tubewell against abandoned tubewell No. 4
Installation of tubewell
Construction of boundary wall , laying of IPB road and path and all other works contingent thereto
Installation of tubewell
Installation of tubewell
Installation of tubewell
Distribution system
Preparation of DPR for augmentation of W/S scheme of Meham Town Distt.Rohtak
Construction of Pump Chamber 10x12 and rising main for jointing of tubewell and all other works contingent thereto
Operation and maintenance of 200 to 900 mm dia DI pipe line (59842 Mtr) in Sec 75 to 89, Faridabad and all other works contingent thereto.
Design, laying, testing, commissioning of 400mm, 600 mm i/d D.I K-9 Pipe line - 7.1 (27.7 KM) from Proposed MBS at Dadasiya and New Ranney wells at Lalpur, Mahawatpur and Amipur, 300 mm i/d D.I pipe (1 KM) on Surajkund Road with design etc.
Installation of tubewell
Installation of tubewell
construction of Boosting Station in Bhutia Pana near old chopal, raw water inlet channel and strengthening of existing S and S tank no.2, Providing and laying distribution system
Supplying, laying, jointing and testing of 2 id 50 mm id GI connecting pipeline from existing tubewell to water tanki at Pahari in Indira Colony of Narnaul Town for running the water supply smoothly and all other works contingent thereto
Supplying, laying, jointing and testing of 2 id 50 mm id GI connecting pipeline from existing tubewell to water tanki at Pahari in Indira Colony of Narnaul Town for running the water supply smoothly and all other works contingent thereto
Job work for providing services for rural water supply schemes Silothi Section2 PHESD No. 3 Bahadurgarh and all other works contingent thereto for 12 months from the date of commencement
Job work for providing services for rural water supply schemes Silothi Section2 PHESD No. 3 Bahadurgarh and all other works contingent thereto for 12 months from the date of commencement
Annual Maintenance Repair of pumping machinery, starter, panel etc. installed on existing water supply scheme Kohrar, Murlipur, Lukhi, Lilodh, Khurshid Nagar, Bishowa, Mumtajpur, Karoli, Tumna, Nainsukhpura, Ahmadpur Partal, Bawwa, Gudiani, Gujjarwas
Hisar Supplementary Estimate for Aug water supply scheme Laying of 4 id DI pipe line CI DI special in New Aggarwal Colony and Aggarsain Colony and all other works contingent thereto