Loading…
Loading…
6,187 results • Best match
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.45
Extension and Augmentation of Water Supply System at Bhai Rupa for Distribution Network and Construction of 0.5 Lakh Gallon OHSR under AMRUT 2.0 Scheme, Part-1
P/l of 700 running feet 4inch DIK-7 Water supply line at the rea of Tagore Nagar and street of Atam in ward no-82.
Prov. and Laying of 8inch and 10inch dia Sewer Line and 4inch DIK 7 Dia Water Supply line in Various Localities of Ward No.2 Ldh.
Shifting of storm, water supply and sewer pipe lines passing through plots no. E-221C, E-212 and F-293 at IFP Phase VIII-B, Mohali
Prov. and Laying of 8 inch dia sewerage line, Replacement of sewerage and water supply line, Raising and Const. of M.H. slabs in Ward No.5
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.30
Rough Cost Estimate for P/L of 4inch dia DIK 7 water supply line and Sewer line at Khurana Colony in W. No.16 (Councillor Quota)
A/Mtc. of Water Supply Sewerage Scheme at 70.5 Acre, Improvement Trust, Maharaja Ranjit Singh Avenue, Jalandhar for the year 2022-2023 (w.e.f. 01.04.2022 to 31.03.2023).
Prov. and Laying of 4 inch DIK-7 Water Supply line and 8 inch UPVC Sewer lines at Bhai Randhir Singh Nagar in ward No-57.
Upgradation of 4 inch dia DIK7 Water Supply line and 8 inch and 12 inch UPVC Sewer line at New Karamsar Colony in W. No. 14.
A/Mtc. of Water Supply and Sewerage Scheme at 17Acre, Improvement Trust, Bye Pass G.T. Road Jalandhar for the year 2020-2021 w.e.f. 01.07.2020 to 31.03.2021.
REPAIR AND MAINTENANCE OF UNSERVICEABLE WATER SUPPLY DI/GI/CI PIPE LINES FOR TECHNICAL OMQ AREA AND EXTERNAL WATER/SPRINKERS/BOREWELL SUPPLY AT AF STN BHISIANA
Replacement of damaged sewer pipe line, missing link of water supply, Raising of M.H. Cover Frames and Const. of Add. M.H. Chambers in Ward No.47
REPAIR AND MAINTENANCE OF EXTERNAL WATER SUPPLY DISTRIBUTION SYSTEM AND ELECTRIC SUPPLY DISTRIBUTION SYSTEM DG SET ALONGWITH CONNECTED ITEMS AT 44 WEU UNDER GE (AF) BHISIANA
OUTSOURCING FOR MAINTENANCE AND OPERATION OF WATER SUPPLY, FIRE FIGHTING INSTALLATIONS AND 11 KV RECEIVING STATION AT MIL STN BEAS AND JANDIALA GURU UNDER GE KAPURTHALA
Repair / Replacement and maint of Fire Fighting System, repair to installation and external water supply works at Mil Stn Beas and Jandiala Guru under GE Kapurthala
PAINTING OF CHLORINE GAS CYLINDERS, PROVISION OF GASEOUS CHLORINATOR AND SUPPLY OF CHLORINE GAS FOR TREATMENT OF WATER AT WATER SUPPLY INSTALLATION UNDER GE UTILITY BATHINDA.
Shifting of Water Supply Pipeline due to Construction of Railway Over Bridge (ROB) and all other works contingent there to at Jalalabad Road, Sri Muktsar Sahib
Improved access to water through household connections in existing water supply village Chawinda Kalan and Chawinda Khurd Block Chogawan and District Amritsar under PRWSSIP 2a ii
REPAIR/MAINT TO SLUICE VALVE, NRV, CLEANING OF UG SUMP AND OH TANK, CENTRIFUGAL PUMP REPLACEMENT, EXTERNAL WATER SUPPLY PIPELINE AND ACCESSORIES UNDER GE (U) BATHINDA
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.27
Providing improved access to water through household connections in existing water supply village Bhagupur Bet Village Kotli Dasundi Block Chogawan District Amritsar under PRWSSIP 2a ii
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.24
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.23
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.21
Providing improved access to water through household connections in existing water supply village Manj and Dashmesh Nagar Block Chogawan and District Amritsar under PRWSSIP 2a ii
Operation and Maintenance of Water Supply and Sewerage Scheme at Phagwara Town Distt. Kapurthala for the year 2025 to 2026 01.04.2025 to 31.03.2026 for 12 Months
Providing Tap Connections to consumers, Extension and Augmentation of Water Supply System at Nakodar District Jalandhar for Distribution Network and Installation of Tubewell under AMRUT 2.0.
Laying of New Water Supply Pipe Lines In Place of Old Damaged Pipe Line Near 4 5 6 Marla Plots Urban Estate Phase II at Patiala
Estimate for Supplying of Material for the Maintenance of Water Supply Lines and Tubewells in Different Localities of Hoshiarpur Town. (Reso. No. 95 (3) dated 16.03.2021)
Prov./ Laying 4inch id DIK-7 water supply line and 16inch id RCC NP3 sewer line at Shanti nagar HDFC bank wlai gali ward no. 30
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.47
Upgradation of 10 inch id UPVC sewer line and 4 inch id DIK7 water supply line at Industry Area B Backside Pahwa Hospital ward no. 45.
Annual Maintenance of Water Supply and Sewerge Lines and Water Works at 43.60 Acre OUVGL Spinfed Site Abohar Distt.Fazilka for the period from 01.07.2022 to 31.03.2023.
O and M OF WATER SUPPLY and SEWERAGE SYSTEM AT BARIWALA, DISTT. SRI MUKTSAR SAHIB FOR THE PERIOD OF 09 MONTHS (01.07.2023 TO 31-03-2024)
Prov. and Lay. Water Supply and Sewer line in W.No.04 TP Scheme No.3 and Gali No. 4 at Hoshiarpur Town Distt. HSP Deposit Work
A Mtc. OF O and M OF WATER SUPPLY SYSTEM AT BADHNI KALAN, DISTT. MOGA FOR THE PERIOD OF 12 MONTHs 1.04.2023 TO 31-03-2024
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.20
Replacement of damaged sewer line and water supply line in area Mohmad deen Building,Kartar Nagar,Sandhu Colony,Bhalla Colony,Modern Colony,Harkrishan Avenue,W.No.77
Work of Renewal and Replacement of Damaged Roof Paint Electrical Wiring Joinery Water Supply Sanitary and Other Allied Civil Works at CE Border Zone PSPCL Amritsar
Providing Tap Connections to consumers, Extension and Augmentation of Water Supply System at Mullanpur Dhaka District Ludhiana for Distribution Network under AMRUT 2.0 Scheme (Part-1)
Replacement of missing link of water supply and sewer, Raising of M.H. Cover Frames and Const. of Add. M.H. Chamber in area of Ward No.44
Operation and Maintenance of Water Supply and MPS at Nawanshahr for the year 2023-24 period of 12 months 01-04-2023 to 31-3-2024
Supply of No. 22 Pump Operator and No. 02 Bill Distributor for water Supply Branch MC Jagraon (One Year on DC Rate) (Estimate Cost 38.77 Lacs)
O and M OF WATER SUPPLY and SEWERAGE SCHEME AT MALOUT, DISTT. SRI MUKTSAR SAHIB FOR THE PERIOD OF 10 MONTHS (01.06.2023 TO 31-03-2024)
A Mtc of Water Supply System at Ferozepur City and Basti Tankan Wali for the period of 6 Month(01-10-2020 to 31-03-2021)
Up-gradation of Sewer Line / Cont. of additional machine hole chambers, Water supply in Gwala Mohalla and Lassi Chownk to Local Adda Ward No.64 Ludhiana.
Providing and Laying of 10 inch dia UPVC ISI Mark Sewer pipe line and DI k7 water supply line in Dashmesh nagar Ward 29 Zone 5
Providing Tap connections for consumers by Augmentation and Rehabilitation of Water supply System at Sanaur Dist. Patiala, Punjab for Distribution Network part 1 AMRUT 2.0 Scheme