Loading…
Loading…
6,706 results • Best match
WATER SUPPLY WORK DGL TN-05-49 DINDIGUL BLOCK
Improvement of water supply system at Naranammalpuram Town Panchayat
Improvement of Water Supply System to Nasiyanur Town Panchayat
IMPROVEMENT OF WATER SUPPLY WORK IN SIVAGIRI TOWN PANCHAYAT
Supply of Water Supply Materials at Naduvattam Town Panchayat
IMPROVEMENT OF WATER SUPPLY SYSTEM TO BARGUR TOWN PANCHAYAT
Purchase of Water supply Accessories in Sendamangalam Town panchayat
Annual Tender Melachokkanathapuram Town Panchayat water Supply Material Purchased
Improvement of Water Supply System in Kurumbalur Town Panchayat
Supply of Water Supply Materials to Bikkatty Town Panchayat
Supply of Water Supply Materials in Ettayapuram Town Panchayat
Annual Maintenance of the Internal Electrical Installation and Fans, Water supply pumpsets, Compound lights for the Regional Station Office of Zoological Survey of India at Port Blair, A&N Islands. (For the year 2023-2024) Subwork/Packages: Annual comprehensive of 1 No. 13 passenger lift for 36 Months
REPAIR/ MAINT OF EXTERNAL WATER SUPPLY PIPE LINES, CLEANING OF OH TANKS, UG SUMPS, SHALLOW WELLS, SUPPLY OF CHLORINE, CHEMICALS, GAS, REPAIR OF PUMP SETS, STARTERS AND CONNECTED WORKS AT MH,PALLAVARAM, 100 ORs, DEFENCE COLONY AND OTA UNDER GE STM
COMPREHENSIVE MAINT AND OF INFRASRUCTURE OF EXTERNAL WATER SUPPLY SYSTEM INCLUDING CERTAIN ALLIED WORKS IN SMQ AND OMQ AREA AND REPAIR/MAINT OF RO PLANT ULTRA FILTRATION PLANT FILTERS AND CONNECTED ITEMS PIPE LINES AND OTHER MISC EM ITEMS AT AFS SULU
Providing Deep Borewell with Minipower Pump at Kamarajar Nagar Near Thanjavur Savadi Andimadam Road
Providing new pipeline at swaminathapuram wss
Construction Compound wall at Nariyampettai GLR and painting works 7 Nos of OHT in Kalambur Town panchayat
Rectification of repairs to 20HP sub. pumpset in kalluvili sump, Poojapuravilai open well and repairs to hand pumpset in Loorthu matha street 8th anbiyam
Rectificatin of repairs to 10HP Motor in Kanyakumari RR park and 12.5HP submersible pumpset in Poojapuravilai Open well
Construction of 3 Infiltration Wells and 2 Sumps of 2.00 Lakh lit, 1 sump of 3.00 Lakh lit capacity for water storage, Pumping Main Length of 24.05km points, Feeder Main 5.10 km length of HDPE pipes Construction of 3 New OHT
Laying of MS PIPE 406.4 MM and 6.3 MM THICK and 160MM PVC PIPE 6KSC PIPE LINE IN Bhavanisagar Head Works
Extension of Pipeline with Ward no.1 Gengupatti and Ward no.9 Andipatti Adidravidar street and Ward no.11 Rangampalayam Valluvar street in Konganapuram town panchayat
Providing New Bore Well With Mini Power Pump With Sintex Tank At Ward No 07 Burial Ground In Vanavasi Town Panchayat.
Rectification of repairs to 7.5HP submersible pumpset in Mantharamputhur Borewell No. I, Mantharamputhur well, Kumarisalai Well and 20HP submersible pumpset in Poojapuravilai sump
Providing And Erection Of 7.5HP Submersible Motor And Other Componenets For Ward No.2 Muniyappan Kovil Street Ward No 9 Sandhaipettai And Madeswaran Koil Street Ward No14 Rathinavelukadu And In Attayampatti Town Panchayat
construction of compound wall and valve pit at kalakad Road Water tank
Providing fencing arrangements for Josephpuram, Avarivilai, Marthandapuram North near Boothathar coil and Marthandapuram East OHTs near Anganwadi and Maintenance of pumproom at Amaravathivilai and maintenance of Gate in Gnanamnagar OHT in Mylaudy.
Supplying and Delivery of Submersible Pump set (Spare Moter) in Mohanur Town Panchayat
Providing New Bore Well With Mini Power Pump With Sintex Tank At Ward No 1 And 9 PHC Near Periyavanavasi In Vanavasi Town Panchayat.
Providing Pumping main from Ramar Kovil to East middle street OHT
Extension of Pipeline at Ward no.5 Uthukinaru to Panchayat Union MiddleSchool Reddimaniyakkaranoor Near Vinayakar Kovil in Elampillai Town Panchayat.
REPAIRS TO INTERNAL WATER SUPPLY LINES CLEANING OF WATER TANK REPAIRS TO STAIR CASE PLINTH PROTECTION TILES WALL TILES IN TOILETS PLUMBING SANITARY FITTINGS AND OF PRMNT AND TEMPORARY BLDGS ETC IN MD AND OTM ACCN IN ZONE B AND POIGAIPAKKAM ARAKKONAM
REPAIRS MAINT OF EXTERNAL WATER SUPPLY PIPE LINES PIPE LINE AT SEWAGE INSTALLATION AND ALL TYPE OF VALVES AND VALVE PIT PUMP SETS AND STARTERS WITH ALLIED WORKS CHLORINATION RO PLANTS WITH SUPPLY OF WATER TREATMENT CHEMICALS IN MAIN CAMP AND TECH AR
Construction of 5.00 LL Sump. Motor Room and Erection of 15 HP Open well Submersible Motor, panel board and Electrical Items and Laying of 110mm dia HDPE pipe line works for Water Supply at Ward No. 44 Karnnor in Hosur City Municipal Corporationa
Renewal of BT surfaces due to water supply woks at Manivasagar street, Manivasagar street 1st cross, Sankara eye hospital 2nd street, Sankara eye hospital 2nd street 2nd cross in ward no.30,Shajahan nagar main road, Shajahan nagar S-N road1, Shajaha
Operation and Maintenance of borewell, hand pump, water supply pumping and distribution pipe lines leakages, renewal, rewinding and re-erection of submersible motor in Ward No in Ward No 31,33 to 35, 40 to 44 and 46 to 48 in Zone-3
Providing New borewell 2 Nos, Erection of 10 HP submersible motor, Panel Board, Column Pipe, 3 core 6 Samm Cable and Laying of 90mm HDPE pipe line works for Water Supply at Ward No. 13 Krishna Nagar in Hosur City Municipal Corporation
Restoration of road cut surface for laying water supply pipe lines under 24x7 WSS from Bangalore ,Kanakapura ,Malavali ,Kollagal ,Chamrajnagar , Sathy ,Coimbatore Road NH 948 (Sathy Road ) in between Km 312/100 ,Km 315/570 in RHS and Km 312/100 ,Km 3
Construction of 10 Class rooms, 2 HSS Science Laboratory building, 1 unit of Girls toilet, 1 unit of Boys toilet and drinking water supply arrangements in GHSS Under NABARD RIDF XXIX for the year 2023-24 at Sokkanathapuram in Attur block, Salem Dist
Package3 Restoration of BT surfaces damaged due to UGSS and water Supply at 1) Reshma Garden main road west to east 162086R14052, 2) Reshma Garden main road north to south 162086R14053, 3) Reshma Garden west to east street1 162086R14054, 4) Reshma G
Restoration of BI Surtace tor Pipeline Cutting Portion damaged due to Water Supply works WSS at Selvapuram Arul nagar west to east cut road 1 162078R13346, Selvapuram Arul nagar west to east cut road 2 162078R13347, Selvapuram Arul nagar west to ea
PROVISION OF STAND BY DI WATER SUPPLY PIPE LINE OF 150 MM DIA FROM GURKHA HILL CIRCLE AND SPECIAL REPAIRS TO TILING FALSE CEILING WITH LED LIGHTING REPLASTERING WHITE WASH REPLACEMENT OF DOORS AT STORE ROOM OF UNIVERSITY DIVISION AT DSSC WEL
Replacement of Fully damaged 250mm dia C.I Pipe UGD line Relaying the 200mm P.V.C. Pipe and 250mm Dia C.I. Clamp Set at Vasuki Nagar 3rd Street and Attending Water Supply Contamination Works at Krishnapuram Colony Jn Srinivasa Avenue In Ward 5 and 16
Supply and Fixing of New 20 HP and 35 HP Open Well Submersible pump set motor for Sump and One Year Maintentance Works to OHT (01.04.2025 to 31.03.2026) at Mettur- Sriram Nagar OHT in Kurichi Water Supply Division South Zone, Coimbatore Corporation
Package No.24 Restoration of Damaged Road due to UGSS and Water Supply and Relaying of BT Road (more than 5 year) at AMMAN NAGAR CROSS ROAD 1162094R15586, AMMAN NAGAR CUT ROAD 10162094R15595, AMMAN NAGAR CUT ROAD 11162094R15596,AMMAN NAGAR CUT RO
Repair and maintenance of 20 HP and 35 HP open well submersible pump set motor for sump and one year maintenance works to OHT (01.08.2025 to 31.07.2026) at Kurichi Housing unit phase-I and II OHT in kurichi water supply division south zone
Removing of Existing damaged M.S hollow pipes, replacing of New Grill for Compound wall, water supply arrangements by providing bore well and treatment plant, Painting work for footpath, Tree and FRC benches at TNHB B6 Park in Dn-199, Unit-44, Z-15
Providing New borewell 3 Nos, Erection of 10 HP Panel motor, submersible Board, Column Pipe, 3 core b Sqmm Cable and Laying of 90mm HDPE pipe line works for Water Supply at Ward No. Booster 09 Alasanatham Hosur City Station Municipal Corporation
Package6 Restoration of damaged BT surfaces due to Before five years, UGSS and water supply works in ward no. 97 and 100 in Coimbatore Corporation 1.Housing Unit Phase 2 Main Road 7 (162097R16187), 2. Housing Unit Phase 2 Main Road 6 (162097R161
Operation and maintenance of water supply pumps and filling of water to overhead tanks of Type 1, 3, 4 5 and 5, CE Quarters and Non-Residential Buildings at Analmin Nagarfor, from the Date of Commencement of Work and up to 31.03.2025