Loading…
Loading…
3,423 results • Best match
R Mtc. of Agartala Water Supply Scheme during the year 2025-26 Hiring of 1(one) no vehicle M and M Scorpio N in absolute condition (Chasis not earlier than 2025) along with driver to be run in the different places of the state for supervising differe
Constn of 01 No of water supply scheme at S.K Para Proper (Near CRPF Camp) under Sindu Kumar Para VC by constructing of 02 Nos SBDTW PVC storage tank of 20000 liter Capacity and laying of DI_GI_UPVC of different dia in/c instln of submersible pump mo
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Site development works, approach road, Construction of Aerator, Sedimentation Tank (10000 Gallon), HRF cum SSF (1500 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system etc and other allied works /GR-I
Site development works, approach road, Construction of Weir, Construction of UFF cum SSF (2000 LPH) etc and other allied works under DWSSub- Division, Dasda/Gr-I
Clear Water Reservoir (10000 Gallon) with pump house Chlorination system, Raw water pump house with electrical accessories, Distribution Reservoir pumping arrangement/ GR-II
Site development works, approach road, construction of Infiltration Well, Sedimentation Tank( 10000 Gallon), HRF cum SSF (1500 LPH), Clear Water Reservoir../ GR-I
Site development works, approach road, Construction of Weir, Sedimentation Tank( 10000 Gallon), HRF cum SSF (1500 LPH) etc and other allied works under DWS Sub- Division, Dasda.Gr-I
Construction of Raw water pump house, providing Mono Bloc Pump with necessary electrical accessories, Boundary Fencing, providing and laying of Rising and distribution pipe line, providing FHTC etc and other allied works/ GR-III
Poviding and laying of Rising and distribution pipe line, providing FHTC etc and other allied works under DWS Sub- Division, Dasda.Gr-II
Site development works, approach road, Construction of Weir, UFF cum SSF (2000 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system, pumping arrangement(Solar), Boundary Fencing, providing and laying of Rising ...
Construction of Infiltration Well (6 mtr dia), Construction of Raw water pump house with electrical accessories, Boundary Fencing etc. and other allied works under DWS Sub- Division, Dasda/ Gr-III
Site development works, approach road, Construction of Infiltration well, UFF cum SSF (2000 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system, pumping ETC
Providing and laying of Rising and distribution pipe line, providing FHTC etc and other allied works under DWS Sub- Division, Dasda.Gr-III
Providing and laying of Rising and distribution pipe Line, providing FHTC etc and other allied works under DWS Sub- Division, Dasda/Gr-III
Providing and laying of Rising and Distribution pipe line, providing FHTCs etc and other allied works under DWS Sub- Division, Dasda/Gr-II
Construction of Weir, Construction of UFF cum SSF (2000 LPH) etc and other allied works under DWS Sub- Division, Dasda/Gr-I
Providing and laying of Rising and distribution pipe line, providing FHTC etc and other Allied works under DWSSub- Division, Dasda/Gr-III
Construction of Raw water pump house with electrical accessories, Boundary Fencing, construction of Infiltration well etc and other allied works under DWS Sub- Division, Dasda./ Gr-III
Site development works, approach road, Construction of Clear Water Reservoir (10000 Gallon) with pump house Chlorination system, Boundary Fencing ETC/ GR-II
Construction of Clear Water Reservoir (10000 Gallon) with pump house Chlorination system, Boundary Fencing, providing and laying of Rising and distribution pipe line, providing FHTC, Distribution reservoir(10000 gallon capacity) /Gr-II.
Construction of Raw water pump house with electrical accessories, Boundary Fencing, Construction Infiltration well etc and other allied works under DWS Sub- Division, Dasda. Gr-III
Site development works, approach road, Construction of Aerator (2500 GPH), Construction of Sedimentation Tank ETC Gr-I.
Site development works, approach road, construction of Infiltration Well, Sedimentation Tank( 10000 Gallon), HRF cum SSF (1500 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system/ GR-I
Poviding and laying of Rising and distribution pipe line, providing FHTC etc and other allied Works under DWS Sub- Division, Dasda./ Gr-II
SH Hiring Of 1 one NO Maruti Eco/ Maruti wagonR Petrol Registration commercial having Manufactured not before 2022 for the office of the Assistant Engineer DWS Sub-Division Kanchanpur North Tripura during the year 2026 27
Const. of 2 nos Pump House, providing, laying delivery pipeline, commissioning of DTW and Const. of 2 nos 2500 GPH Capacity Pakage type IRP, 3 Nos 5000 GPH modified IRP in/c O, M for 1 Year complete at Panisagar NP of DWS Sub-Division PANISAGAR
Const. of 2 nos Pump House, providing-installation of pumpset, providing electrical accessories, providing-laying delivery pipeline, commissioning of DTW and Const. of 2500 GPH Capacity Pakage type IRP at Panisagar NP of DWS Sub-Division PANISAGAR
Repairing, Restoration Mtc of Existing Water supply schemes at Various DTW Pump House under DWS Sub-Division Dasda.
Hiring of 1 No Maruti Omni/Maruti Eco/Maruti Celerio X/ Maruti Wagon R./Maruti Alto K 10 having commercial Registration (Manufacture not before 2018) for office of the Sub-Divisional Officer, PWD (DWS). Panisagar Sub-Division, during the year 2021-22
Hiring of 1 No Maruti Omni/Maruti Eco/Maruti CelerioX/ Maruti Wagon R./Maruti Alto K10 having commercial Registration (Manufacture not before 2018) for office of the Sub-Divisional Officer, PWD (DWS). Dharmanagar Sub-Division, during the year 2021-22
Please refer to DNIeT
Please refer to DNIeT
Const of 04 nos Masonry Well and Circular RCC Water Reservoir, Pump House, providing, installation of Pump Motor, providing laying of pipe line with providing domestic connection within the jurisdiction of DWS DIVISION, DHARMANAGAR/Gr.I
Providing and laying D.I. Rising pipeline from newly sunk DTW at Pratyekroy (Joypur-II) to Gobindapur W-3 (CWR-I) and Ward-4 (CWR-II) including all allied works. /Gr-I
Providing and laying D.I. Rising pipeline from newly sunk DTW at Pratyekroy (Joypur-II) to Gobindapur W-3 (CWR-I) and Ward-4 (CWR-II) including all allied works. /Gr-II
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Please refer to DNIeT
Borring and lowering of tube well along with motor connection and pipe laying and other allied works at 5(five) nos. water tank constructed by AMC in different locations. (Deposit Work)
Const. of RCC TRAY AREATOR,HRF cum SSF, CWR, Distribution Reservoir, Clear water Pump House, Electrical and Mechanical works, Boundary wall, providing pipeline and domestic connection, site deve. and approach road etc. of DWS Sub-Division, Dasda
GI PIPE FOR WATER SUPPLY
Repairing mtc. Of Innovative water supply schemes under DWS Sub-Division, Dasda under Dasda RD Block areas during the year 2024-25
Const of 1 no pump house, providing and installation of pump sets, providing and laying of distribution pipe line, extending domestic connection with hydrant post, platform etc. complete at LUNGTHIRECK of KALAGANG VC of DWS Sub-Division KANCHANPUR
Construction of 2(two) Nos. weir,1(one) Nos. ground level RCC Raw water reservoir in/c pump house, 1(one) Nos. Distribution water tank at village top, protection works for structures near cherra bed etc under Jampui Hill R.D Block area under DWS Divi
Construction of plant site approach road and internal road, construction of retaining wall, toe wall etc in/c allied works under DWS Sub-Division, Kanchanpur