Loading…
Loading…
2,872 results • Best match
Material & Labour charges for tapping of 250NB, 350NB WTP-1&2 Sludge GRP pipe lines and 700NB GRP header with flanges and laying of MS PU line 250NB and connected to stage-1 outfall line near stage-2 sea water reservoir back side during the Financial year 2024-25.
Custom Bid for Services - Assistance in operation of DM Plant CPU Chemical handling Coal sampling testing water sampling and testing stack ambient air SWAS effluent sampling and housekeeping of stageI and stageII area of WTP Operation of flue gas NT.. Similar Category Operation and Maintenance Power House/Power Plant
Repairs & Rewinding of 415V, 3-Phase LT Motors above 5.5kW capacity pertaining to WTP-I&II ,FIRE Pump House, SD-5/WTP, EM & MRT Division, Stage-II/SDSTPS for the year 2026-27
Consultancy services for appointment of Authority Engineer for Design Review & Construction Supervision Quality Assurance and technical auditing if Surbey Investigation Design Construction Testing commissioning of smart infrastructure works of ... , water treatment plant , ...
Construction of 300mm Size CC Drains from a) E.P.No.GNP.4/83 near Absab house to P Nabisab house (D.No.4-361-C) b) Akbar Basha house (D.No.4-463-A) to E.P.No.CH 13511 (Opp. Water Treatment Plant) in West BC Colony, Election Ward No.19.
SUPPLY OF PLASTIC FILTER NOZZLES FOR DMF, PSF AND LSF TANKS IN WTP-1AND2
Overhaul/Breakdown maintenance of various pumps in WTP-II for the FY:2026-27
Overhaul/Breakdown maintenance of various pumps in WTP-1 for the FY:2026-27
SDSTPS (2X800 MW)- Cleaning of Sintex Water Tanks, Maintenance of Sewer Lines, Removal of debris from dustbins, disposal of cleared jungle at WTP, Switch Yard, CHP, AHP Buildings and Supplying of water to flowering plants in road side shoulders at various locations for the period from 01.04.2020 to 31-03-2021
SDSTPS(2x800MW)-Cleaning of sintex water tanks, maintenance of sewer lines, removal of debris from dustbins at WTP,Switch yard,CHP,AHP buildings and supplying of water to flowering plants in road side shouldres at various locations for the period from 1.04.2018 or actual date of commencement of work to 31.03.2019.
Laying of 4" HDPE Pipe Line and CC Road Cum 450mm drain from D No 2/88 to D No 2/62 in Telugu Veedhi 1 in 20th EWm& Laying of CC Road from D No13/477-3 to D No 13/481 (Reddaiah Rice Mill Road),D No13/388 to RO Plant (Chakkanayya Street) & D No 13/451-6 to D No 13/409 in 12th EW& Construction of 300mm CC Drain in Padamati Veedhi of 17th EW in Kamalapuram Nagara Panchayat.
AMC- Stage-II- Removal of Debris/ garbage from dust bins and silt removal from internal drains at WTP-1 and WTP-2, AHP, Silo locations etc., for the period from April'2026 to March'2027.
Engaging of Man Mazdoor on Outsourcing basis for maintenance of Water Supply to AIIMS Water Treatment Plant and Mangalagiri urban, Maintenance of Greenary in Horticulture Wing in Managalagiri Urban and Rural areas for a period of 12 Months in Mangalgiri Tadepalli Municipal Corporation under Municipal General Funds
AS PER BOQ AND TENDER DOCUMENT
AS PER BOQ AND TENDER DOCUMENT
Drilling Of Bore Well at Ippatam Secretariat Office for water Supply to RO Plant in Ippatam (V), Tadepalli rural under AE - 4 Section in Mangalagiri Tadepalli Municipal Corporation Under Municipal General Funds
SDSTPS (2X800 MW) - Upkeeping of buildings, Cleaning of toilets and Maintenance of flowering plants and lawn at WTP, ETP, Fuel Oil Pump House, Fire Water Pump House, Chemical Lab, Ware House and Hazardous Storage Building, Switch Yard , Cooling Tower Road and Stage -II Pylon in SDSTPS for the period from 01.04.2019 to 31.03.2020
SDSTPS (2x800MW)- Cleaning of Sintex water tanks, maintenance of sewer lines, removal of debris from dustbins, disposal of cleared jungle at WTP, Switch Yard, CHP, AHP buildings and supplying of water to flowering plants along road side shoulders at various locations for the period from 01-04-2019 to 31-03-2020.
SDSTPS (2X800 MW) - Upkeeping of buildings, Cleaning of toilets and Maintenance of flowering plants and lawn at WTP, ETP, Fuel Oil Pump House, Fire Water Pump House, Chemical Lab, Ware House and Hazardous Storage Building, Switch Yard , Cooling Tower Road and Stage -II Pylon in SDSTPS for the period from 01.04.2019 to 31.03.2020
SDSTPS-3X800MW- Stage-I-Cleaning of Sintex Water Tanks, Maintenance of Sewer Lines, Removal of debris from dustbins, disposal of cleared jungle at WTP, Switch Yard, CHP, AHP Buildings and Supplying of water to flowering plants in road side shoulders at various locations for the period from 01.04.2025 to 31-03-2026
Supply and Delivery of 20 W,70 W LED Lights and Nut & Bolts,Tap Roles and AB Cable for installation of new street lights in Extenstion Area from Ward No.1 to 40 and at WTP,Pump Rooms from Ward No.1 to 40 in Dharmavaram Municipality under General Funds 2025-26
Construction of Providing Water Supply, Trunk Infra such as Raw Water Intake Well, WTP, ELSRs, Pump Room etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in Krishna District, Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability period under Lump sum contract (Percentage Tender) cum Reverse Tendering.
Construction of Providing Water Supply, Trunk Infra such as Raw Water Intake Well, WTP, ELSRs, Pump Room etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in Krishna District, Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability period under Lump sum contract (Percentage Tender) cum Reverse Tendering
Providing 400 MM Dia DI Transmission Main from 1000 MM dia New MGR line to WTP of MES at Narava to release Bulk Water (Raw) of 10 LGPD (Package-I) from 1000mm dia MGR Raw water pipeline (near Narava high school) to Santhoshi matha colony (Narava) under Deposit contribution work of MES
Restoration of major leak over 700mm dia MS pumping main beside old MBR at Takkellapadu WTP
Potable water purification system Average Turn Over of Last 3 Years 2 Lakh (s) Experience with Gov. Required 3 Year (s) MSME Exemption For Years Of Experience And Turnover Yes Potable Water Purification System ( 6 ) Technical Specifications * As per ... Operated Reverse Osmosis based ...
Construction of permanent campus for IIT Tirupati at merlapaka village, Yerpedu Mandal, Chittoor Dist., A.P Phase-I(Stage-I) SH: providing water fountains for aeriation process in Pond No-1 and SITC of openwell submersible pumpsets with allied ... KLD WTP .
Rewinding & Repair of 15-HP 3- phase Monoblock motor,7.5-HP 3- phase Monoblock motor , 5.0 -HP 3- phase Monoblock motor, 1.0 -HP 3- phase Monoblock motors for Maintenance of water supply in Nulakapet WTP& supply and delivery of 1HP submersible motor Under AE section-4 in Mangalagiri Tadepalli Municipal Corporation under Municipal General Funds
Keeping the chlorination plants of Stage-I, II & III into service and collection of the samples from the clarifiers, collection of bottom ash, Fly ash and Mill samples from all the Six units, testing the same at WTP for the year 2019-20 during the period from 01-04-2019 to 31-03-2020.
Repairs of 60 HP(P2) Motor pump at WTP Pump Room in Rayadurgam Municipality under General Funds.
Manufacturing, Supply, Delivery and Fabrication of indoor TYPE 75KVAR AUTOMATIC POWER FACTOR CONTROLLER PANEL for Krishna Nagar WTP in Nulakapeta 11th Ward of Tadepalli urban and For Booster Motors in Various Places of Tadepalli and Merged Villages Ippatam. Gundimeda, Chirravuru and Prathuru pump house under AE-4 section in Mangalagiri Tadepalli Municipal Corporation under General Funds
Providing Water Supply facility to AIIMS, Mangalagiri from Atmakuru Storage Tank as Source - Construction of staff quarters at 2.5MLD Filteration plant in AIIMs,Mangalagiri including cost and conveyance of all material etc., to complete. Manufacture, ... MLD WTP respectively).
Providing Water Supply facility to AIIMS, Mangalagiri from Atmakuru Storage Tank as Source - Construction of staff quarters at 2.5MLD Filteration plant in AIIMs,Mangalagiri including cost and conveyance of all material etc., to complete. Manufacture, ... MLD WTP respectively).
Construction of Providing Water Supply, Trunk Infra such as Trunk mains, Raw Water Intake Well, WTP, ELSRs, Pump Room etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in NTR (Krishna) District, Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability period under Lump sum contract (Percentage Tender) cum Reverse Tendering.
Manufacturing, Supply, Delivery and Fabrication of indoor TYPE 75KVAR AUTOMATIC POWER FACTOR CONTROLLER PANEL for Krishna Nagar WTP in Nulakapeta 11th Ward of Tadepalli urban and For Booster Motors in Various Places of Tadepalli and Merged Villages Ippatam. Gundimeda, Chirravuru and Prathuru pump house under AE-4 section in Mangalagiri Tadepalli Municipal Corporation under General Funds
Overhauling of 3.3KV HT Motors of capacity 725KW, and 1085KW connected to SKID High Pressure pumps in WTP-1&2 including de-coupling, painting, alignment with driven equipment in WTP-I & II , SD-5,EM&MRT Division Stage-II, SDSTPS for 2026-27.
SUPPLY OF FERRIC, LSF/MB ACID AND CAUSTIC UNLOADING PUMPS WITH SUITABLE MOTOR AND TROLLEY IN WTP-2
Providing 15 HP motor and pump set Pandaripuram head water works WTP Ward No.35 in Chilakaluripet Municipality
Providing CC Road Opp WTP In BC Colony (Rajaka) 1st&2nd Cross in ward no 2nd in Repalle Municipality
Providing of 41 No's contractors workmen to assist in Trouble shooting round the clock, Upkeeping, Routine, Preventive and minor breakdown works of Common Auxiliaries equipment and equipment in WTP, ETP,STP,Raw water pump house, Cranes in above areas, ventilation system, Compressor air system of Unit-I & II of SDSTPS for the period from 01.04.2017 to 31.03.2018 including consumables (LPG,DA,O2 gas).
BZA Division: 1) Provision of Divyangjan facilities at way side stations in SSE/ works/ TUNI section under ADEN/ TUNI sub-Division; 2) BZA-VSKP section:- Provision of water supply system & RO plants between Chebrolu- Duvvada stations; 3) GLU, REG,NASP;- Construction of IRS type PF shelters on PF No. 1,2&3 in SSE/W/TUNI section; 4)Provision of Cover over platform shelters of IRS type on platform 1,2&3 at ANV in ADEN/ SLO sub division; 5)Provision of cover over platform shelters of IRStype on plat form 1,2&3 type on platform 1,2&3 at PAP, GLP, MPU & BVL stations ADEN/SLO sub division under Sr.DEN/North /BZA jurisdiction- Electrical arrangements.
Maintenance of Electrical and Mechanical installations at ICGS Married Accommodation premises, Krishnapatnam for the year 2023-24 Subwork/Packages: Providing IEI & Fans, LT UG cable for additional 10KLH RO plant building and pole collars for street light pole etc
Supply, Installation and commissioning of Portable De Ionizer water distilled water plant of 200 ltrs capacity. Approx TDS:200 PPM, Demineralizing unit capacity of 20 Lit per hour. Specification:1.Stage One: Reverse Osmosis basis pre-treatment, Maximum input feed water TDS will not more than 500ppm require at least 35 PSI inlet water pressure with ball valve and AC power supply with 5Amp 3-pin socket with switch 3 feet near to the location and vent for drain water under scope from Railways. 2.Stage Two: Media based treatment. 3.Stage Three: Output treated water per hour will be 20 liters (+/ 10%) at an input water TDS not more than 500 ppm. Place of installation within the BZA Division (COA, MTM & BZA) and specified by Railways after joint survey with the supplier. MAKE PARAMOUNT No.PAT-NRDM20 or similar.
Construction of New National Academy of Customs, Indirect Taxes and Narcotics (NACIN) Under Phase-1 at Palasamudram, Anantapur District, Andhra Pradesh. SH: Planning, Designing and Construction of Buildings, Development works, Bulk Services, ... Tanks, Water Treatment Plant , ...
CONSTRUCTION OF 400 BEDDED 350 AND 50 SUPER SPECIALITY HOSPITAL GROUND PLUS SEVEN FOR ESIC AT SHEELANAGAR VISAKHAPATNAM ANDHRA PRADESH SUB HEAD PLANNING DESIGNING AND CONSTRUCTION OF BUILDINGS DEVELOPMENT WORKS BULK SERVICES HORTICULTURE WORKS ... TANKS WATER TREATMENT PLANT RAIN ...
SDSTPS - 3X800MW- AMC-Attending Miscellaneous Civil works of WTP, ETP, Switch yard, CHP, AHP, Internal Roads & drains for the period from 01.04.2026 to 31.03.2027
Laying of 200NB line at Fuel Oil Tank area(HFO LDO Tanks) in place existing damaged line including supports for newly laid pipe excluding RCC pedestals and laying of new 200NB line from FWPH to WTP along the main Road above ground in place of existing damaged underground line during the year 2021-22 including material required during the year 2021-22 including material required for completion of work
Laying of 200NB line at Fuel Oil Tank area(HFO LDO Tanks) in place existing damaged line including supports for newly laid pipe excluding RCC pedestals and laying of new 200NB line from FWPH to WTP along the main Road above ground in place of existing damaged underground line during the year 2021-22 including material required during the year 2021-22 including material required for completion of work
Annual Maintenance Contract of Supply and delivery of PVC, HDPE, MS and GI pipes for the maintenance of existing pipe lines, DI D/F Gate valves (sluice valves) for the maintenance of various sizes to 9 Merged Panchyats ie. Ward. No.93 to 98 and ... 42MLD WTP under ...
Construction of Raw water Intake well cum Pump house and Foot Bridge at Chippili Storage Tank with 6.0 mtr Dia. 15 M staging,Supply, delivery and erection of 3 Nos x 63 KW at Chippili Storage Tank Intake well including suction, delivery connection at ... at Filtration Plant , ...