Loading…
Loading…
2,533 results • Best match
Repair and renovation of the office of E.E(Dwarka) WTP, E.E(EAP)-III and E.E(Project)W-V at OHT, Ashok Vihar ,D.J.B.
SITC of One No. Chlorinator 10 Kg/hr Capacity at Pre with allied work at WTP Bawana Make Metito/Pennwalt/Capital Control l.
Augmentation of Raw water by removal of floating material through mechanical arrangement with special attachment at Haiderpur WTP PhI and II Re-invited
Renovation of the MS Structure with allied works as per site requirement at Raw Water Pump House I and II of Haiderpur WTP.
Running Operation of various units of 2nd and 3rd 40 MGD and Intake plant of Wazirabad WTP by providing unskilled workers 26 nos
Construction of RCC block and P/F grill in both side and restoration of upstream River Bank of Wazirbad Barrage at Wazirabad WTP.
Under AE(E) EMSD-3 (M-South) Police Complex, Malviya Nagar, New Delhi-110017.
Domestic Refrigerators-IS 1476, Domestic Water Heater-geyser - as per IS 2082, convection heaters- room heater, blower, Potable water purification system Reverse Osmosis or UV based, Cloth Dryer Stand, Chairs-Office- IS 3499, Executive Table, Almirah Steel-IS:3312, Wooden Almirah, Single/Double Bed - Wooden - With/Without Box, Patient Bed (Fowler and Semi Fowler), quilts, Laundry Type Washing Machines/Drying Machines, Liquid Crystal Display LCD Panel or Monitors
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable water purification system with inbuilt water cooler.; 3 to 5; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servicing, ... System Reverse Osmosis Or ...
Procurement of 4,300 MT Alumina Ferric (Alum) Grade-IV, ISI marked,for treatment of raw water at Wazirabad, Haiderpur and Bawana WTP of DJB.
Providing and laying of electric cables along with SITC of Distribution panel for additional nos. of tubewells at Sonia Vihar WTP Campus. (Re-Invited)
Augmentation of Raw water by removal of floating material through mechanical arrangement with special attachment at Haiderpur WTP, Ph-I and II. ( Re-Invited)
Removal of floating material manually by labour at different bar screens installed at RWPH of WTP Haiderpur Phase-I and II up to 20.05.2026.
S/I/T/C OF EOH WITH COMPLETE SET OF BATTERIES, PLATFORM AND FRP SHED WITH WEIGH MACHINE AT 1ST 40 MGD WTP WAZIRABAD
Repairing of 02 nos. drain valves of Shiva Durga make installed at filter bed no. 03 and filter bed no 04 of Bawana WTP.
Refurbishment of Existing HDPE Tank Distribution Network 1 to 33 No. with Cleaning of the HDPE Tank and Allied Work at WTP HP-II.
Laying of power supply cable from main supply at filter house South Phase HP II to horticulture Tube well at rose garden Haiderpur WTP
Renovation servicing of 03 Nos. Valves of 600 MM dia. installed at filter bed no. 07 and 08 at filter house of Bawana WTP.
Removal of floating material manually by labour at different bar screens installed at RWPH of WTP Haiderpur Phase I and II up to 28.02.2026.
REPAIR AND SERVICE OF STIRRER or AGITATORS, GEAR BOX AND LIFT OF ALUM TANKS 03 NOS. NO. 01 TO 03 AT WTP CHANDRAWAL I.
Hiring of portable flow meter transmitter for measurement of flow at various line/location for audit of primary reservoir under Okhla WTP (Re-Invited).
Removal of building debris/mixed garbage from Wazirabad WTP and Staff Colony and sealing of opening of abandoned Staff Qtrs. to prevent unauthorized entry.
Electrification fitting at newly built Pre Chlorination buildings near raw water sump at WTP HP-I and other allied works at lab staff rooms
Hiring of 1 nos cycle rickshaw for lifting and disposal of day to day garbage from WTP Haiderpur under EE(C)Plant,WW-HP.
Renovation/Repairing/Servicing Of 2 Nos Chlorinators Metito Make 40 Kg/Hr Chlorinators With Allied Work At Pre and Post Points At Chandrawal WTP-II
Deployment of staff for Patrolling/Operation of valves for Twin Main emanating from Badli intersection (near Haiderpur WTP) to Wazirabad Water Works up to 05.07.2026.
Repairing of 02 nos. 1000 mm dia. Sluice valve of Shiva Durga make installed at UGR no. 1 and no.2 respectively at WTP Bawana.
S/I/T/C of 1 no. Chlorinator capacity 10 Kg/hr (as per attached chlorinator specification) with allied works at Pre Chlorination WTP Bawana
REFURBISHMENT, REPAIR AND SERVICE OF CHAIN PULLLY SYSTEM USED FOR NCHANGING CHLORINE CYLINDER AT PRE AND POST CHLORINATION POINT OF WTP-III 40 MGD WAZIRABAD
Repairing servicing of 02 nos filter valves of Upadhaya valves make installed at filter bed no 06 and 07 at filter house of Bawana WTP.
REPAIR AND SERVICE OF METITO MAKE CHLORINATOR OF 40 KG/HR CAPACITY WITH REQUIRED SPARES AT MACHINE NUMBER 01 AND MACHINE NUMBER 02 AT WTP WAZIRABAD
Strengthening of Filter Bed No.3 and 4 of Filter House including required civil works at Bawana WTP under EE(C)Plant,WW-HP. (Re-invited)
Electrification fitting at newly built Pre chlorination Buildings near Raw Water Sump at WTP HP-I and other allied work at lab Staff Rooms.(Re-Invite)
DESILTING OF PAC TANKS, REPLACEMENT OF FEEDING VALVE AND REPAIRING OF MOTOR PUMP FOR LIFTING OF PAC TO PVC TANKS AT WTP-III 40 MGD WAZIRABAD
Supply, Installation, Testing and Commissioning of 50 Nos. Tube wells along with Automation, O and M for 2 Yrs. at Bhagirathi WTP for augmentation water supply
Removal of floating material manually by labour at different bar screens installed at RWPH of WTP Haiderpur Phase I and II up to 31 10 2025
Deployment of staff for operation and maintenance of tubewells installed at Haiderpur. (Re-invite)
Renovation or rolling shutters and channel shutters at CWPH HP II
Procurement of floor fill / epoxy concrete repair compound for repairing of fraction wheel path of clarifier at filter house , HP WWII (Re-invite)
Improvement of power factor in Domain make 125 KVAR APFC Panel installed at CWPH HP- II.
Boring of 10 nos. trial bores at Nangloi-Najafgarh Road, Rohtak Road Iradat nagar Pump House
Procurement of miscellaneous mechanical items for Filter House HP II
Repairing Servicing Supply and installation of regular wear and tear parts of globe make EOTs of Bar screen installed at RWPH at Haiderpur WTP for 1 year.
Deployment of unskilled and semi-skilled manpower for maintenance at Haiderpur Water Works, Bawana WTP and Varun Niketan in the division of EE(C)Plant,WW-HP.
Replacement of damaged pipe railing and P/F collapsible gate and MS Jali etc. for safety and security of workers of new Pump House at Okhla WTP.
Deployment of unskilled and semi-skilled manpower for maintenance at Haiderpur Water Works, Bawana WTP and Varun Niketan in the division of EE(C)Plant,WW-HP.
Deployment of unskilled and semi-skilled manpower for maintenance at Haiderpur Water Works, Bawana WTP and Varun Niketan in the division of EE(C)Plant,WW-HP.
RENOVATION/REPAIRING/SERVICING OF 03 NOS MAKE 40 KG/HR METITO MAKE CHLORINATORS ALONG WITH GAS HEADER LINE WITH ACCESSORIES AS PER REQUIREMENT AT CHANDRAWAL WTP II
Deployment of staff for patrolling operation of valves for twin main emanating from Badli intersection Near Haiderpur WTP to Wazirabad water works. UP to 28.02.2026 (Re-Invite)
Comprehensive routine maintenance and operation