Loading…
Loading…
1,450 results • Best match
State Plan 2019 20 RWSS to Muypliyam Replacing the damaged filter media including replacing the filter sand and required quantity of filter media and connected work of Water Treatment Plant at Inchakundu in Varandarapilly Panchayath
JJM 2022 2024 WSS to adjoining Panchayaths of Varkala Phase II 600mm DI K9 RWPM 23 MLD WTP 12 LL Clearwater Sump Water Supply arrangements Electrical Mechanical items in WTP PLC SCADA Automation and related items in WTP Well cumPump House
O M Water Supply Schemes Mace of WTP Chavasseryparamba Transportation of empty chlorine tonner from WTP to Kochi back after refilling of 1 year contract
MP LADS MPLADS 2022 23 DEPOSIT WORK ADV A M ARIFF MP LOK SABHA RWSS TO THRIKKUNNAPUZHA SUPPLY ERECTION AND COMMISSIONING OF 3000 LPH REVERSE OSMOSIS TREATMENT PLANT AT FISH LANDING CENTRE IN WARD 10 OF THRIKKUNNAPUZHA GRAMA PANCHAYATH
DEPOSIT ME1202 CWSS to Sabarimala and Pampa Mace of RO Plants at Pampa and Sabarimala during Mandala Makara vilakku and Masa Poojas through out the year ME 1202 General Civil Work
KIIFB-TRAN-11-WRD025-10- Drinking water project in coastal panchayaths of Chirayinkeezhu Constituency Phase I , II- Design ,Construction ,trial running ,commissioning and maintenance of 15 mld water treatment plant , 9 lakh litres capacity clear wat
JJM - NAYARAMBALAM PT in Ernakulam DIstrict - Phase II (Part II)- Improvements of Water Treatment Plant - Renovation of 430KW FCMA Soft Starter of 600 HP No.1,3 motors and allied works at 63 MLD Plant at Chowara
Appendix -II-JJM - RO Plant installation and Providing drinking water to the Fluoride affected area - Kizhoor habitation at Trikkediri Grama Panchayat in Palakkad district.
AMRUT 2015 2016 PhaseI Augmentation Modernization of Water Supply Distribution System in Alappuzha Municipality Supply and installing of Ultrasonic Flow Meter on 800 mm DI clear water pumping main at premises of Water treatment plant at Karumadi
Mace of 30 MLD WTP at Chavasseryparamba Transportation of empty chlorine tonner from WTP to TCC Kochi and back after refilling for a period of one year
Maintenance of WTP at Chavasseryparamba -13 7 MLD at Chavasseryparamba Transportation of empty Chlorine tonner from WTP at Chavasseryparamba to TCC Kochi and back after filling road
State Plan-2022-23 - Maintenance of ARWSS to Urakam Vengara and Kannamangalam-Optimisation of production and transmission - Renovation of WTP-Mace of 11 MLD WTP at Vengara
O andM JICA WSS to Cherthala Municipality and adjoining Panchayaths Maintenance of WTP Thycattussery Replacement of HT TOD Meter Current Transformers and Potential Transformer at WTP Thycattussery
Others KWA DRW 2022 23 Urgent works to Mitigate water scarcity Improvement works in WTP Supplying and fixing Chlorinator unit and accessories 2Kg Hr at WTP Kidangoor
Maintenance of WTP at chavasseryparamba Transportation of empty chlorine tonner from WTP at Chavasseryparamba to TCC Kochi and back after refilling for a period of 1 year
DEPOSIT WORK - Chengannur Block Panchayath Annual plan 2024-25 -Providing RO plant at Schools, Pre-metric hostel and Block office compound in Chengannur Block Panchayath
DEPOSIT-NPPMBI- Burns unit - Urgent modifications in Govt Medical college Hospital Thrissur for installation of RO Plant in Burns unit-Electrical work-General Electrical Work
DEPOSIT-MCTCR- Development -NPPMBI- Burns unit - Urgent modifications in Govt. Medical college Hospital Thrissur for installation of RO Plant in Burns unit-General Civil works
Jal Jeevan Mission (JJM)-WSS to Cheekode and Adjoining Villages--Urgent repair works to 41 MLD Water treatment plant Compound wall with RR Pitching work to protect Raw water pumping main from soil erosion including
JJMAkalakkunnam Mutholy Upgradation of WTP Mutholy and Booster Pump House Edamula
State Plan CWSS to Varkala Refurbishing filter media for Mullasserikkunnu WTP
OandM Water Supply Schemes Mace of CARWSS to Ranni Pazhavangadi and Vadasserikkara Desilting and washing the Clariflocculator No2 with Flash mixer and Sump in the Water treatment plant and OHSR at Anapparamala Ranni IR No 1603670 Pipeline Work
AMRUT-AMRUT - 100MLD WTP at Vasoorichira - Balance Civil Work-AMRUT 1.0 -Balance Civil Work - Phase II -Construction of storm water drain and pond at 100MLD WTP at Vasoorichira
Maintenance of KWSS 30MLD WTP at Chavasseryparamba Transportation of empty Chlorine Tonner from WTP to TCC Kochi back after refilling Conveyance for a period of One year 24Nos
State Plan- State Plan 2021-2022 Part 1 - Construction of Toilets in 9 MLD WTP , 12.5 MLD second stage compound , Pudussery WTP and PIF Booster.-General Civil Work
State Plan-2025-26-UWSS to Anakkayam-Supply, erection and commissioning of suitable air blower/compressor at existing 8.5 MLD WTP and related works-General Electrical Work
O and M Water Supply Schemes 74 MLD JICA assisted WTP - Replacement of damaged 200mm MS service water line at 74 MLD WTP Balance Work General Civil Work.
SPECIAL REPAIRS TO HT SYSTEM BY REPLACING HT OVERHEAD LINES AND HT TWO POLE/FOUR POLE STRUCTURE WITH HT UG CABLES AND RMU AT FILTRATION PLANT AND CSD AREA AT INA EZHIMALA
Proj. No.165 2021-22-Side Protection of Various Thodu-Rubber factory thodu(44)thaithodu(41)-ESI south side(42)-Idukku junction to RO plant(46)
TWSS-Mace of 86 MLD WTP at Aruvikkara-Conveyance of chlorine cylinder from 86MLD WTP at Aruvikkara to M/S TCC ltd Kochi and filled cylinder back to Aruvikkara
TWSS-Mace of 86MLD WTP at Aruvikkara-Conveyance of chlorine cylinder from 86 MLD WTP at Aruvikkara to M/S TCC ltd Kochi and filled cylinder back to Aruvikkara
JJM 2023 2024 Kottukal Grama Panchayath Supply Eerection Testing and commissioning of 1 No 400 KVA 11KV 433 V Indoor Transformer at WTP site at pongil WTP Pipeline Work
State Plan 2022-23- UWSS to Punalur Municipality - 9 MLD WTP - Maintenance of filter house building, pump house building, maintenance of OHSR at WTP and Mussavarikunnu at Punalur Muncipality
Supplying and replacing of water filter media in WTP at IISER TVM
RKI Energy Audit- optimisation replacing 16 ineffitient pumping systes at peruvannamuzhi WTP
Supplying and replacing of water filter media in WTP at IISER TVM
Electrical Works at STP and WTP near Main Gate in IIMK Campus
RECONSTRUCTION OF COMPOUND WALL AND RETAINING WALL IN KALLISSERRY WTP COMPOUND.
Providing 4505 FHTC with replacement of old pipes pipe line extension in various wards Renovation of water treatment plant pump house construction of sump OHSR pump houses and connected works of RWSS to Vilappil in Vilappil panchayath under Aryanad
-Maintenance of WTP- Tanker Lorry Yard Works Construction of drain and flooring work at tanker filling point -Construction of drain and flooring work at tanker filling point-General Civil Work
REPAIR/REPLACEMENT OF EXTERNAL WATER SUPPLY LINES, PUMP SET AT PANGODE MIL STN, MUKKUNNIMALA, MAINT OF AMPHIBIOUS TRG NODE (SWIMMING POOL), FILTRATION PLANT, CLEANING OF OHT AND UG SUMP UNDER GE (ARMY) TRIVANDRUM
Supply, Installation, Testing & Commissioning of Swimming Pool Wall Mount Filtration Plant, PUMP OF 1.5 HP 220 V/50 Hz, 01 no, Flow rate 15m3/h, fiber glass shell size 1110x670x780mm, Under water SS
TWSS-Mace of 72 MLD WTP at Aruvikkara-Conveyance of chlorine cylinder from 72 MLD WTP at Aruvikkara to M/S TCC ltd Kochi and filled cylinder back to Aruvikkara
OandM Water Supply Schemes Mace of WTP at Chavasseryparamba Transportation of Empty Chlorine cylinder from WTP at Chavasserypamba of KWSS to TCC Kochi and back after refilling for 1 Year
Servicing maintenance of water treatment plant Removing media from 02 Nos multigrid pressure sand filter 02 Nos carbon activated filter and supply refilling new media testing and commissioning of raw water pump house at BSF Campus Nadapuram of 131 BN
Mace of JICA Assisted KWSS to Meenad and adjoining villages Package I Intake works and Water Treatment plant Revamping the Control Panel components of Edamon Feeder and Supply and installation of LBS to the multi panel at intake Pump House Tholiko
Construction of 5 Lakh liters capacity ground level water tank near water treatment plant including providing and fixing Hydro Pneumatic water pumping system at National Institute of Technology , Calicut .SH: Providing Internal Electrical Installations and LT Panel at Pump room.
JJM-2021-WSS to Keezhuparamba Panchayath in Malappuram Dt-Package I -Construction of 5 MLD WTP with sump cum pump house OHSR at WTP site CWPM Wash water drain at Pazhamparamba
Maintenance of WSS to Anjarakandy, Peralassery and adjoining Panchayaths 46 MLD WTP at Chavasseryparamba Transportation of empty Chlorine tonner from WTP Chavasseryparamba to TCC Kochin and back after refilling 2020 21
Jal Jeevan Mission (JJM)-CWSS to Kalipara - Optimization of Water treatment plant, Improving capacity of 36.00 MLD WTP at Kalippara-Electrical Maintenance of Sub Station Kalipara -General Civil Work