Loading…
Loading…
1,451 results • Best match
Maintenance of WSS to Anjarakandy, Peralassery and adjoining Panchayaths 46 MLD WTP at Chavasseryparamba Transportation of empty Chlorine tonner from WTP Chavasseryparamba to TCC Kochin and back after refilling 2020 21
State Plan 201920 RWSS to PuthenvelikkaraRenovation of WTP at Elenthikkara in Puthenvelikkara Panchayat
JJM 2021-22- Setting up Quality control lab attached to JICA , Peruvannamuzhi WTP.
Annual Plan-XIV-th Plan 2024-25 of Wandoor Block BP 284- Taluk Hospital Dialysis Center - RO Plant Plumbing Works-Project No-284/2024-25-General Civil Work
MLA ADS 2019_20 Sri Mullakkara Rethnakaran MLA Chadayamangalam constituency Alternate Water Supply Facility to Govt Taluk Hospital Kadakkal _Marupuram Pond_ in Kadakkal Pt RO Plant for Dialysis Unit
Shifting of 630KVA transformer from 9MLD WTP cler water sump compound to clear water sump cum pump house of 45 MLD WTP and errection of main switch board and energising
Coveyance of empty chlorine cylinder tonner from various Water Treatment Plants unjder Neyyattinkara Division
JJM_Reappropriation- Sreekrishnapuram Panchayath- Improvement of WTP by Conveying laying pumping main inside the plant compound and construction of Pump Operator room,Interlock paving in WTP compound and Balance restoration in PWD road
Maintenance of WSS to Anjarakandy Peralassery and adjoining panchayath 46 MLD WTP at Chavasseryparamba Transportation of empty Chlorine tonner from WTP at Chavasseryparamba to TCC Kochi and back after refilling 2022 23
Maintenance of CWSS to Kuthuparamba Pattiam Kottayam WTP at Thattil Transportation of empty Chlorine tonner from WTP at Thattil to TCC Kochi and back after refilling for a period of one yearr
AMRUT-2.0 - Replacement of existing Distribution lines at PSY East Area in Irinjalakuda Municipality-Replacement of existing Distribution line from WTP to SNDP (WTP Road, Pallikkad Road, Kattungachira Road)-General Civil Work
STATE PLAN 2020-21 - CWSS to Alappad, Clappana, Karunagappally and Oachira - Supply and fixing New Chlorinator (feeding 0 - 10 Kg/hr) - 2 Nos. at WTP, Oachira and Booster station (feeding 0 - 10 Kg/ hr - with 100 Kg Cylinder - 2 Nos.)
State Plan 2021-22 - Demolishing Clarifier - 4.5MLD WTP at Pudussery
DRW 2022-23 - IWSS to Irinjalakuda Municipalicity - Supply of Chlorine tonner for Mangadikunnu WTP
JJM VADAKKEKARA PT IN Ernakulam district Part 1 Improvements of water treatment Plant Supply and erection of 600HP VT motor pump set in PWPH having discharge 2736m3 Hour against a total head of 42 m in 63MLD plant at Chowara Patrt 1
Potable water purification system Potable Water Purification System ( 3 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis ... Operated Reverse Osmosis based ...
CWSS to Kovalam tourist area Vizhinjam corporation area Kalliyoor and Venganoor panchayaths Providing a platform for entering the vehicles for loading and unloading of chlorine cylinder in the chlorine room of 21.90MLD WTP at Vellayani under Vandi
Supply of Quality Testing Lab Equipments to WTP of WSS to Irikkur and Adjoining Villages at Poovam and WTP of WSS to Naval Academy at Chanadukkam
Mace works Annual contract for Conveyance of Empty Chlorine tonners cylinders from various water treatment plants under Cherpu section to TCC Kochi and Filled Chlorine tonners cylinders from TCC Kochi to various water treatment plants
GENERAL-Replace the old GI water supply lines from the RO plant to the HDS Dialysis unit with CPVC pipes at Govt. Medical college Kozhikode.-Work-General Civil work
STATE-PLAN-2022-2023- Nemmara Constituency - Supply and Erection of various motor pumpsets at Koduvayur Pudunagram WTP and Thekkathvattaram sump cum pump house and allied improvements to Koduvayur Pudunagaram WTP at Puzhapalam Chittur
State Plan 2022 23 Optimization of Production and Transmission Renovation of WTP Augmentation of WSS to Paravur Muncipality and adjoining panchayaths 63 MLD WTP at Chowara Supply of 930 KG Capacity Chlorine Tonners
SWAJAL DHARA DRINKING WATER - WATER TREATMENT PLANT CONSTRUCTION (KEEZHATHOTTAM WARD)
Supply, Installation, Testing and Commissioning of Ducted Exhaust System in WTP, IISER Campus, Thiruvananthapuram
State Plan 2019 2020 Renovation Of WTP Renovation of Lab at Head Works Aluva
State Plan 2025 26 Recycling of waste water at WTP Vellayani General Civil Work
Supply and erection of centrifugal pump
STATE PLAN 2024-25 - CWSS TO KAYAMKULAM AND ARATTUPUZHA- WTP PATHIYOOR -SUPPL Y, ERECT ION AND COMMISSIONING OF 75 HP C/F PUMP SETS (ARATTUPUZHA ZONE) AT CLEAR WATER PUMP HOUSE, WTP AT PATHIYOOR.
AMRUT-2.0- SWAP 1-Construction of a new WTP of 4 MLD at Olari with Pumping station at Pullazhi with connected works-Package II-Soil exploration test for WTP site at Pullekunnu-Investigation Work
Maintenance of WSS to Thalassery Mahe 36MLD WTP at Mailady 6 5MLD at PathipalamTransportation of empty chlorine Tonner cylinder from WTP to TCC Kochi and back after refilling for a period of 1 year
DRW 2022-23 - RWSS to Karalam, Padiyur, Poomangalam - Supply of Chlorine tonner for Karalam WTP
State Plan 2021-22-Optimization of production and transmission renovation of WTP-Modernisation of 72MLD
REFER TENDER DOCUMENT
JICA Assisted KWSS to Meenad and adjoing villges- Package I- Intake works and Water Treatment plant-- Supply and erection of 1 no VT pump set at Raw water Pump house at Tholikkode having discharge1666.66 m3 hr and head 130.78 m and other allied wor
KIIFB Renovation and augumentation of 25mld WTP at Kallissery Renovation of 33mld WTP at Thiruvalla for Thiruvalla, Changanassery Municipalities and adjoining two panchayaths - Package IIIa Construction of 15LL OH tank at Thiruvanvandoor supply and l
JAL JEEVAN MISSION JJM JJM 2021 22 PHASE 2 PART 8 WTP VELLAYANI ADDITIONAL WORK AT REVAMPING THE EXISTING FILTER MEDIA IN 21 90 MLD WTP AT VELLAYANI UNDER WW SECTION VANDITHADAM GENERAL CIVIL WORK
Mace works Conveyance of filled chlorine tonner from TCC Ltd Udyogamandal Kochin to Irinjalakuda Karalam WTP and Conveyance of empty chlorine tonner from Irinjalakuda Karalam WTP to TCC Ltd Udyogamandal Kochi for the year 2023
Jal Jeevan Mission-Kannur District-Dharmadam Panchayath-Renovation of WTP at Mailady-General Civil work-
Draining out of backwash water from WTP to an existing Rain Water Pond at Kinfra
Supply of Chemicals to CETP and WTP for Water Treatment at Rubber Park Irapuram Ernakulam
State Plan 2019 20 Maintenance of Kolachery WSS Replacement of clarifier bridge structure at WTP
State Plan 2020-21-Cleaning of clear water sump of 42LL capacity at Maradu WTP
Installation of 3.3KV VCB Panel for new 72MLD WTP of Kerala Water Authority at Aruvikkara
Providing and fixing flow meter in WTP, Various Hostels and Academics Buildings for IISERTVM Campus
Jal Jeevan Mission (JJM)-Karoor Panchayath - Package 1 - 6MLD WTP at Valavoor and allied works
AMRUT2 improving production capacity of 100 MLD WTP Lifting of existing 2 nos VTpump sets
Special repairs and maintenance of PWD rest house Nenmara (New block)- Purchase of Materials and Installation of RO plant, Water purifier and its service etc. for Rest House, Nemmara
MPLAD - 2018 - 2019 - Supply , Erection , Testing and Commissioning of Skid Mounted 250 LPH output capacity RO Plant Capable of remove TDS up to 2000 PPM with all accessories in GHS Chandiroor
Custom Bid for Services - Manning and operation of services for external water supply RL 30 and filtration plant and connected misc works at INA Ezhimala and comprehensive annual operation and maintenance of drinking water cum iron removal treatment ..()