Jal Jeevan Mission-Augmentation of CWSS to Chithara and adjoining panchayaths -Construction of 10 MLD WTP at Madathara.
State Plan2022 23Tracing of AirScourSluice Valve Chambers of Transmission Main from 74 MLD WTP Aruvikkara to PTP Nagar
DRW 2022 Removing sludge from wash water pond at 30MLD WTP Chavasseryparamba and sump at Booster station Veliyambra
RWSS to Ayroor Kanjeettukara-Urgent works related to 114 th Cherukolpuzha Convention Installation of Hot Cold Water Dispensers Water Kiosks RO plant having 1000 Litters hour capacity and pipe line work at Convention Nagar Pipeline
Annual Maintenance Contract for Operation and Maintenance of electrical installationsDG set,Air conditioningFire protectionMini RO Plant and Kitchen equipments in Kerala HouseTravancore House and attached Quarters at New Delhi for a period of 1 year
Construction of 10 MLD Water Treatment Plant-BoosterStation,RWPM,CWPM,OHSR,2 Nos pumpsets
Design, detailed engineering, Preparation of drawings, Supply, Fabrication, Installation, third party inspection, Testing and Commissioning and 3 years CAMC of Sea water Filtration and Intake System including hooking up with Heat Exchanger at MULT Je
Jal Jeevan Mission (JJM)- WSS to Thrikkaruva, Panayam, Perinad, Munroethuruth - Phase -2-Design and construction of 12 LL OHSR at Thrikkaruva, Laying 600mm DI RWPM from Nanthirikkal to Perinad WTP and laying 500 mm and 450mm DI CWPM from WTP to Thrik
State Plan Optimization of production and transmission 2024 2025 State Plan 2024 2025 Supply Erection commissioning of centrifugal pump set 32m3 hr 1450rpm154 m Head at Manjalloor WTP ManiyathadamGeneral Civil Work
Renovation and water Purification system
Supply Installation trial run and commissioning of Control Module for remote operation of pumping stations Raw Water Pump House for 15MLD WTP at Vynthala
State Plan- Modernization of Aruvikkara Pumping Station- Balance Construction of Proposed Canteen Building at Aruvikkara WTP Campus - Phase - 2
Flood 2018 RWSS to K V Mury Supply and erection of chlorinator in WTP at Mandikunnu in Meloor panchayat
Maintenance of Aeration Tank Rest Room of WTP and Painting of compound wall at KINFRA Hi-Tech Park Kalamassery
TWSS mace Periodical Washing of 13.5 MLD and 16 MLD WTP at PTP NAGAR for the year 2021 2022
State Plan-2025-2026- BWSS- Supply and Installation of chlorinator and 2 Nos. of chlorine tonner in purameri WTP
O and M - Water Supply Schemes- Periodical washing of 16 MLD WTP -at PTP Nagar for the year2025-26
TWSS MACE Periodical Washing of 13.5 MLD and 16 MLD WTP at PTP NAGAR for the year 2020 2021
JJM- Upgradation of existing lab at 19 MLD Kunnummal WTP,Kuttiady and NABL Accreditation works- Civil and Electrical works
State Plan 201819 WSS to Vadakkekara Chittattukara Supply errection centrifugal monoblock pump set at WTP at Elanthikkara Pump house
AMRUT-2.0-WSS to Panakkad and Melmuri Villages in Malappuram Municipality - Construction of 7.50 MLD WTP -General Civil Work
O and M - Water Supply Schemes - Maintenance work - ARWSS to Kumily and Chakkupallam - Kumily WTP roof leak proofing work
Construction of 7MLD Water Treatment Plant, OHSR,CWPM-Pipeline Work-1-and construction of tanks
O M Water Supply Schemes ANNUAL MAINTENANCE III WASHING AND MINOR WORKS MAINTENANCE OF WTP VELLAYANI UNDER WW SECTION VANDITHADAM General Civil Work
State Plan 2023 24 UWSS to Kothamangalam Supplying Erection and Commissioning of one 100 HP CF pump set and allied works in the CWPH Kothamangalam WTP no I General Civil Work
DRW-2022-23-UWSS to Tirur -Repair of Clarifier no 2 of WTP Tirur including electro mechanic works providing flocculator system and rail for clariflocculator
State Plan-7.2 MLD WTP FILTER BED-State plan 2022-23 - Mace. of Choondi WSS - Replacing Existing Sand filter beds 2 nos of 7.2 MLD WTP at Choondy with dual media sand filter using anthracite Size of sand filter bed- 7.00x4.50x2.00m -General Civil Wor
Cable-Replacement of defective cable from Power house to Kotta and High mast, Relaying cables from Pump house to RO plant Vertical Distribution Board, Kotta to Pump Room and Pump Room to newly constructing temple under Sponsorship
JJM Elamad _Source improvement_ JICA Meenad _ Supply erection and commissioning of new chlorinator and chlorine header line at WTP Panamkuttimala
KWA-JICA-Assisted Kerala Water Supply Project to Kozhikode Corporation and 13 Adjoining Panchayaths - Annual Operation and Maintenance of intake well and pumping station at Peruvannamuzhi and 174 MLD WTP at Ponmala Hills for Three years
Refer NIT
Supply Erection and Commissioning of 400KVA and 315KVA Transformers and accessories in WTP site and Raw water pump house site
JJM - 2020-2021- Phase II-A4-B- Supply and erection of Pump sets in Kummy WTP in Karakulam Grama Panchayat
JJM -CWSS to Kuttippuram Thirunnavaya Athavanad and Marakkara Panchayaths-Construction of 48 MLD WTP at Kuttippuram-General Civil Work-1
O and M - Periodical washing of 16 MLD WTP at PTP Nagar under Thirumala Section for the year 2024- 25
Deposit work Malappuram Municipality Supply and fitting of centrifugal pump set to Mamparamba WTP in Panakkad village in Malappuram municipality
State Plan 24 25 Supply of Chlorine Tonner to 3.45 MLD WTP at Aryampallam under Chittoor Section-General Civil Work
State Plan2022 23 Tracing of Air Scour Sluice Valve Chambers of Transmission Main from 86 MLD WTP Aruvikkara to Peroorkada
State Plan 2022 23 Renovation of WTP at Inchakund of RWSS to Mupliyam in Varandarapilly Panchayath Part 2 Renovation work
STATE PLAN 2021.2022.Renovation of WTP.CARWSS to Elappara and adjoining villages Supply of new chlorinator unit for 9.5 MLD WTP
O and M - Periodical washing of 13.5 MLD WTP - at PTP Nagar under Thirumala Section for the year 2024 - 25
Maintenance-Mace of NRDWP-WSS to Velliyamattom-Repacking of Filter Bed Nos. I and II of 4MLD WTP at Njaralampuzha
Providing Fencing Work for Astronomy Club from WTP water tank to STP treated water tank at Hill top Nila Campus
Operation and maintenance of waste water treatment plant with capacity of 0.5MLD at Taliparamba municipality, Kannur
Construction of 3.5 mld water treatment plant and allied works at 12th mile General Civil Work
Deposit Work Kallara Panchayath Project No.213/21 Supply Erection Testing Commissioning of skid mounted 500 LPH out put capacity RO Plant capable of removing TDS upto 3000 ppm with all accessories in Panchayath compound of kallara Panchayat
Conveying Empty Chlorine Cylinder to TCC Kochi for Refilling and back to WTP Peruvalathuparamba
Jal Jeevan Mission JJM 2021 22 PHASE 2 WTP VELLAYANI REMOVING THE EXISTING FILTER SAND OF THE FILTER MEDIA TO A DEPTH OF 0.30M AND REFILLING WITH NEW FILTER SAND TO A DEPTH OF 0.30 M IN 21.90 MLD WTP AT VELLAYANI UNDER WW SECTION VANDITHADAM General
Jal Jeevan Mission -RDWSS to Karalam, Kattoor, Padiyoor, Poomangalam- Dismantling the existing compound wall and construction of new Compound wall around WTP site at Karalam.
SDP Sabarimala-M and M festival in 1195 ME-Certain urgent works at sannidhanam-Improvemens to Aazhy, cleaning the drains and surroundings prior to festival, engaging technicians, plumbers and cleaning staffs to RO plant and kelby units and servicing