Loading…
Loading…
14 results • Recent activity
Repairs to Flooring of Bldg. No. 145 of F2 section Room No. 5 and 5A of Bldg. No. 360 and Bldg. No. 30 and 888 of L3 section and Bldg. No. 529 of C4 section inside factory at AFK.
Construction of toilet block at F-4 and Store section inside factory at AFK.
Demolition of RCC Elevated water tank near Bldg 435 and demolition of old Boiler chimney at Boiler house near L3 section inside Factory at AFK.
Repairs/Renovation of industrial canteen kitchen area except dining hall area inside factory at AFK.
REPAIRS TO TOILET BLOCK OF ROOM NO. 1 TO 4, VIP ROOM DHANUSH, SEMINAR HALL AND DINING HALL OF OLD IB AND WPT OF ROOF SLAB OF OLD IB AT AFK.
Term Contract for Artificers work in Non-filling area inside factory at AFK for the year 2025-26